Supplier/Mfg Location 供应商/制造地点:
Part Number(s) / 零件号:
Program(s) / 项目:Part Name / 零件名:
* Type Key 类型:
S = Design-Supplier / 供应商设计T = Tooling / 模具A= Appearance 外观R = Production Control / 生产控制I = Logistics 物流
G = Design-GM / GM 设计 C = Capacity / 产能
O = Other / 其他
K= Packaging Engineering 包装工程
F = Facilities / 设备
L = Late Release / 发放滞后
P = Purchasing / 采购
M = Manufacturing/Process / 制造/工艺
Issue No.序号
Issue Date 发布日期
IssuesDescription and/or
Sketch
问题描述或插图描述
Person Responsible (Name)责任人
* Type 类型Root Cause Description
根本原因描述
Short Term Action Plan
短期措施
BP 断点
Long Term Action Plan
长期措施
BP 断点
Status 状态
Status 状态描述:
4/4 Issue Resolved 问题已解决
Reviewed by / 审批:
Date / 日期:
APQP Open Issues / APQP 问题清单
1/4 Find Root Cause 找到问题根本原因
0/4 Issue Identified 明确问题定义2/4 Short Term Action Plan Proposed and start to Implement 确定短期措施,并开始实施
3/4 Long Term Action Plan Proposed and start to Implement 确定长期措施,并开始实施
Duns Number / 邓白氏号:
Supplier Contact / 供应商联系人:
SGM SQE :
May,2008June29,2009
1 of 1
GM1927-5GM1927-5(SGM)