试论市政园林工程施工过程造价管理

龙源期刊网 https://www.sodocs.net/doc/476102433.html,

试论市政园林工程施工过程造价管理

作者:田芹

来源:《价值工程》2010年第06期

摘要:市政工程从基本建设程序看须经过可行性研究、项目立项、初步设计、施工图设计、施工阶段、竣工验收等多个阶段和环节。由于市政建设规模大,建设周期长,工程预、结算审核方面的控制应贯穿于建设项目的全过程,这就需要对工程造价的管理始终贯穿于项目的全

过程,合理确定工程造价。

Abstract:From the basic construction process, the municipal project has to go through the processes offeasibility study, project approval, preliminary design, construction design, construction stage, multiple stages of completion and acceptance etc. Since the urban construction has the characteristics of large-scale and long construction period, project budget and settlement auditing control should run through the whole process, which requires the management of the construction cost of the project to run through the whole process in order to determine the construction cost.

关键词:施工;管理;工程造价

Key words:construction;management;construction cost

中图分类号:TU723.3 文献标识码:A文章编号:1006-4311(2010)06-0134-01

1实施阶段工程造价管理主要环节

1.1 规范招投标活动,积极推行工程量清单招标工程项目招投标是项目实施阶段的第一道工序,是确定工程合同造价、择优选取施工单位的关键阶段,因此非常重要。招投标阶段对工程造价的控制重点应放在规范招投标活动和招标方式的确定上,招标评标应实行合理低价中标。随

着工程造价体制和管理模式改革,工程量清单计价规范在全国得到了较好的推广和实施。工程

量清单招投标即由招标人按统一的工程量计算规则,计算并提供工程量清单,投标人视自身的技术、管理水平和劳动生产率以及市场价格进行自主报价。

1.2 认真、严格地对待现场签证现行的市政工程项目一般都实行监理负责制。作为进驻施工现场的监理人员在熟练掌握现场施工和管理的同时,应熟悉工程造价知识,对由施工单位填写的签证,一定要认真核实后方能签字盖章,对不应该签证的项目不应盲目签证,对施工单位在签证上巧立名目,弄虚作假,以少报多,蒙哄欺骗,遇到问题不及时办理签证,结算时搞突击,互相扯皮的现象应严格审查。

1.3 加强设计变更的审查设计变更是实施阶段影响工程造价的又一个重要因素。设计变更应尽量提前,变更发生得越早则损失越小。若在设计阶段变更,则只须修改图纸,其他费用尚未发