搜档网
当前位置:搜档网 › 福特常用缩写词

福特常用缩写词

福特常用缩写词
福特常用缩写词

福特常用缩略语

(CP)Confirmation Prototype确认样车 Final Status最终状态 (J1)Job 1整车投产 PT(P/T)Power Train动力传动系统 (ST)Surface Transfer表面参数传递 Change Cut-Off更改完成 Launch Readiness投产准备就绪 Launch Sign-Off投产验收 Program Approval项目批准 Product Readiness产品准备就绪 Pre Milestone 1SI前里程碑1 Pre Milestone 2SI前里程碑2 Strategic Confirmation策略确认 Strategic Intent策略意向 Strategic Planning策略计划 (SP)Structural Prototype样车结构 (TTO)Tool Try-Out工装设备试运行 OK to buy同意发运 Global 8D Eight disciplinary Actions G8D (福特公司解决问题的标准方法) 14D More Detailed than Global 8D (used to contain and resolve stop- shipment/recall problems) 更详细的细节(包括并解决停止运货/ 召回问题) 1MIS One Month in Service投入使用1个月 1PP First Production Proveout第一次试生产 2PP Second Production Proveout第二次试生产 3MIS Three Months in Service投入使用3个月 4P Production Process Proveout Program生产程序验证项目 5s 整理(SEIRI)、整顿(SEITON)、清 扫(SEISO)、清洁(SEIKETSU)、 素养(SHITSUKE) 一种现场管理方法 AAA American Automobile Association美国汽车工业联合会ABS Affordable Business Structure可承受商业结构ABS Anti skid brake system防抱死制动系统AIAG Automotive Industry Action Group汽车工业行动小组AIC Accelerated Implementation Centre快速实施中心 AIM Automated Issues Matrix问题结构图 AIMS Automotive Industry Action Group机动车工业行动小组AIMS Automated Issues Matrix System问题自动跟踪系统AME Advanced Manufacturing Engineering先进制造工艺 AMPPE Advanced Manufacturing Pre-Program Engineering 先进项目前制造工艺 ANOVA Analysis of Variance多样性分析AP Attribute Prototype设计样车 APEAL Automotive Performance Execution and Layout 机动车性能实施与规划 APQP Advanced Product Quality Planning先期产品质量计划APW Average Production Weekly周平均产量 ASQ American Society for Quality美国质量协会AVT Advance Vehicle Technology先进车辆技术AWS Analytical Warranty System分析性的保修系统

大众汽车集团常用的缩写词和概念修订版

大众汽车集团常用的缩 写词和概念 集团标准化小组:[VVOPPT-JOPP28-JPPTL98-LOPPNN]

大众汽车集团常用的缩写词和概念 H?ufig verwendete Abkürzungen und Begriffe im VW – Konzern LH Lastenheft (S?mtliche Unterlagen zu einem Projekt) 要求汇总书(一个项目的所有资料) TPB Technische Produkt – Beschreibungen ( Zeichnungen, TL usw.) 技术产品描述(图纸,技术供货条件等等) DKM Daten – Kontroll – Modell ( Urmuster 1:1 für die Form) 数据控制模型(汽车形状1:1 的基准样车) P P – Freigabe = Planungsfreigabe ( Entscheidung Serieneinsatz ) P 认可 = 计划认可(决定投入批量生产) B B – Betriebsmittel) B 认可 = 采购认可(对生产手段的投资认可) D D – Freigabe = Dispositionsfreigabe ( für die Nullserie) D 认可 = 零件生产和供应认可 (为零批量) BMG Baumustergenehmigung 产品工程性能检查认可 EM Erstmusterprüfung 首批样件检验 ,也称首批样件认可(Bemusterung ) EMPB Erstmusterprüfbericht , Erstmuter für die Erstmusterprüfung = Bemusterung; EMPB = Erstmuster – Prüfbericht ( Dokumentation der Prüfungen der EM durch den Liferanten) 首批样件检验报告 (供货厂对其样件检验的文件) LH DKM TPB P B D BMG EM+EMPB 2TP PVS

常用汽车行业英文缩写及词汇

常用汽车行业英文缩写及词汇 Passenger V ehicle 乘用车 常用汽车行业英文缩写及词汇 1PP- First Phase of Production Prove-Out 第一次试生产 3C Customer(顾客导向)、Competition(竞争导向)、Competence(专长导向) 4S Sale, Sparepart零配件, Service, Survey信息反馈 5S 整理,整顿,清理,清洁,素养 8D- 8 Discipline ABS Anti-lock Braking System AIAG 美国汽车联合会 ANPQP Alliance New Product Quality Procedure Apportionment 分配 APQP Advanced Product Quality Plan Backlite Windshield 后窗玻璃 Benchmark Data 样件资料 bloodshot adj.充血的, 有血丝的 BMW Bavarian Motor Works C.P.M Certified Purchasing manger 认证采购经理人制度 CB- Confirmation Build 确认样车制造 CC- Change CutOff 设计变更冻结 CC\SC- critical/significant characteristic CCR Concern & Countermeasure Request CCT Cross Company Team Characteristics Matrix 特性矩阵图 COD Cash on Delivery 货到付现预付货款(T/T in advance) CP1- Confirmation Prototype 1st 第一次确认样车 CP2- Confirmation Prototype 2nd 第二次确认样车 Cpk 过程能力指数Cpk=Zmin/3 CPO Complementary Parts Order Craftsmanship 精致工艺 Cross-functional teams跨功能小组 CUV Car-Based Ultility Vehicle D1:信息收集;8D D2:建立8D小组; D3:制定临时的围堵行动措施,避免不良品流出; D4:定义和证实根本原因,避免再发; D5:根据基本原因制定永久措施; D6:执行和确认永久措施; D7:预防再发,实施永久措施;

常用汽车行业英文缩写及词汇

常用汽车行业英文缩写及词汇 常用汽车行业英文缩写及词汇;PassengerVehicle乘用车;常用汽车行业英文缩写及词汇;1PP-FirstPhaseofProducti;3CCustomer(顾客导向)、Competi;4S Sale,Sparepart零配件,Serv;5S整理,整顿,清理,清洁,素养;8D-8Discipline;ABSAnti-lockBrakingSyste; 常用汽车行业英文缩写及词汇 Passenger Vehicle 乘用车 常用汽车行业英文缩写及词汇 1PP- First Phase of Production Prove-Out 第一次试生产 3C Customer(顾客导向)、Competition(竞争导向)、Competence(专长导向)4S Sale, Sparepart零配件, Service, Survey信息反馈 5S 整理,整顿,清理,清洁,素养 8D- 8 Discipline ABS Anti-lock Braking System AIAG 美国汽车联合会 ANPQP Alliance New Product Quality Procedure Apportionment 分配 APQP Advanced Product Quality Plan Backlite Windshield 后窗玻璃

Benchmark Data 样件资料 bloodshot adj.充血的, 有血丝的 BMW Bavarian Motor Works C.P.M Certified Purchasing manger 认证采购经理人制度 CB- Confirmation Build 确认样车制造 CC- Change CutOff 设计变更冻结 CC\SC- critical/significant characteristic CCR Concern & Countermeasure Request CCT Cross Company Team Characteristics Matrix 特性矩阵图 COD Cash on Delivery 货到付现预付货款(T/T in advance) CP1- Confirmation Prototype 1st 第一次确认样车 CP2- Confirmation Prototype 2nd 第二次确认样车 Cpk 过程能力指数Cpk=Zmin/3 CPO Complementary Parts Order Craftsmanship 精致工艺 Cross-functional teams 跨功能小组 CUV Car-Based Ultility Vehicle D1:信息收集;8D D2:建立8D小组;

福特常用缩写词 Acronym List

ACRONYM TERM中文译名(CP)Confirmation Prototype确认样车 Final Status最终状态 (J1)Job 1整车投产 (PT)P/T Design Complete 动力传动系统设计结束 PT(P/T)Power Train动力传动系统(ST)Surface Transfer表面参数传递 Change Cut-Off更改完成 Launch Readiness投产准备就绪 Launch Sign-Off投产验收 Program Approval项目批准 Proportions & Hardpoints比例与固定点 Product Readiness产品准备就绪 Pre Milestone 1SI前里程碑1 Pre Milestone 2SI前里程碑2 Strategic Confirmation策略确认 Strategic Intent策略意向 Strategic Planning策略计划 (SP)Structural Prototype样车结构 (TTO)Tool Try-Out工装设备试运行 G8D (福特公司解决问题的

Global 8D Eight disciplinary Actions标准方法) 14D More Detailed than Global 8D (used to contain and resolve stop- shipment/recall problems) 更详细的细节(包括并 解决停止运货/召回问 题) 1MIS One Month in Service投入使用1个月1PP First Production Proveout第一次试生产2PP Second Production Proveout第二次试生产3MIS Three Months in Service投入使用3个月 4P Production Process Proveout Program 生产程序验证项目 AAA American Automobile Association美国汽车工业联合会ABS Affordable Business Structure可承受商业结构ABS Anti skid brake system防抱死制动系统AIAG Automotive Industry Action Group机动车工业行动小组 AIC Accelerated Implementation Centre 快速实施中心 AIM Automated Issues Matrix问题结构图AIMS Automated Issues Matrix System问题结构图系统 AME Advanced Manufacturing Engineering 先进制造工艺 AMPPE Advanced Manufacturing Pre- Program Engineering 先进项目前制造工艺 ANOVA Analysis of Variance多样性分析AP Attribute Prototype设计样车

大众汽车集团常用的缩写词和概念

大众汽车集团常用的缩写词和概念 LH 要求汇总书(一个项目的所有资料) TPB 技术产品描述(图纸,技术供货条件等等) DKM 数据控制模型(汽车形状1:1的基准样车) P P认可=计划认可(决定投入批量生产) B B认可=采购认可(对生产手段的投资认可) D D认可=零件生产和供应认可(为零批量) BMG 产品工程性能检验认可 EM 经行首批样件检验的首批样件。 首批样件检验也称首批样件认可。 EMPB=首批样件检验报告(供货厂对其样件检验的文件)2TP 两日生产(供货厂的批量预生产,用来验证批量能力)PVS 生产试制批量 0S 零批量(在批量生产条件下的总演习)SF 批量认可(对批量生产的产品认可) EPF (批量供货)计划认可 KAF 集团路试验收(质量方面的批量认可) SOP 生产启动(批量生产启动)ME 市场导入(提供给销售商) CAD 计算机辅助设计 COP 沿用件(与先前车型通用的零件) CKD 全部拆散 SKD 部分拆散 HT 自制件(本厂自己生产的零件) KT 外构件(外部供货厂生产的零件) KD 售后服务 OTS 用批量生产的模具生产的零件 Q 质量… QS 质量保证 TE 技术开发部 PE (合资厂中的)产品工程部 TL 技术供货条件 TS 产品零件表 ZP. 检验点 ZSB 总成 AEKO (产品)改动的控制组织 FMEA 缺陷可能性及其影响分析

项目管理和状态跟踪来确保整体项目各步骤按要求完成。 LH TPB DKM P B D BMG EM 2TP PVS 0S SF EPF KAF SOP ME CAD COP CKD SKD HT KT KD OTS Q QS TE PE TL TS ZP. ZSB AEKO FMEA 要求汇总书(一个项目的所有资料) 技术产品描述(图纸,技术供货条件等等) 数据控制模型(汽车形状1:1的基准样车) P认可=计划认可(决定投入批量生产) B认可=采购认可(对生产手段的投资认可) D认可=零件生产和供应认可(为零批量) 产品工程性能检验认可 进行首批样件检验的首批样件。 首批样件检验也称首批样件认可。 EMPB=首批样件检验报告(供货厂对其样件检验的文件)两日生产(供货厂的批量预生产,用来验证批量能力) 生产试制批量 零批量(在批量生产条件下的总演习) 批量认可(对批量生产的产品认可) (批量供货)计划认可 集团路试验收(质量方面的批量认可) 生产启动(批量生产启动) 市场导入(提供给销售商) 计算机辅助设计 沿用件(与先前车型通用的零件) 全部拆散 部分拆散 自制件(本厂自己生产的零件) 外构件(外部供货厂生产的零件) 售后服务 用批量生产的模具生产的零件 质量… 质量保证 技术开发部 (合资厂中的)产品工程部 技术供货条件 产品零件表 检查点 总成 (产品)改动的控制组织 缺陷可能性及其影响分析

汽车行业常用英文术语缩写词与中文解释

汽车行业常用英文术语缩写词与中文解释 汽车行业常用英文术语缩写词与中文解释 英语简写英语全称中文含义 FPS Ford Product System 福特生产系统 TPS Toyota Product System 丰田生产模式 JIT Just in time 准时化生产 LP Lean Product 精益生产 TPM Total Product Manage 全员生产维护 TQM Total Quality Manage 全员质量管理 ISPC In Station Procece Control 在线过程控制APQP Advance Product Quality Plan 产品质量先期策划和控制FMEA Potential Failure Mode and Effects Analysis 潜在失效模式及后果分析PFMEA Process Failure Mode and Effects Analysis 过程失效模式及后果分析DFMEA Design Failure Mode and Effects Analysis 设计失效模式及后果分析SFMEA System Failure Mode and Effects Analysis 系统失效模式及后果分析MSA Measure System Analysis 测量系统分析 PPAP Produce Piece Approve Procedure 生产件批准程序 SPC Statistical Process Control 统计过程控制 EPC Engineering Process Control 工程过程控制 CKD Completely Knock Down 全散装件组装 SKD Semi Knock Down 半散装件组装 NVA No Value Action 无价值动作 VA Value Action 有价值动作 NVH Noise、Vibration、Harshness 噪声、振动、声振粗糙度 FTT First Time Through 一次下线合格率 OIS Operator Instruction Sheet 作业指导书 SOP Standard Operation Procedure 标准作业指导书 WES Work Element Sheet 工作要素表 WBB Work Balance Sheet 工作平衡板 ABS Anti-skid Brake System. 防滑刹车系统(防抱死系统)EBD Electric Brakeforce Dis-tribution 电子制动力分配 ECU Electronic Control Model 电子控制单元

Valeo 常用缩写词

V- ACRONYMS V- 缩写词 Definition 定义 AQP.pp ADVANCED QUALITY PLANNING for product and process: aim of AQP.pp is provide VALEO with all the guarantees concerning the means to achieve product quality. The AQP.pp includes: VALEO Requirements File (VRF), Quality Assurance File (QAF), Initial Samples File (ISF) and a Quality Monitoring File (QMF). 产品和过程先期质量策划:AQP.pp的目的是向法雷奥提供担保,保证达到产品质量要求的各项方法。AQP.pp 包括:VALEO Requirements File(VRF)法雷奥要求文件,Quality Assurance File (QAF)质量保证文件,Initial Samples File (ISF)首批样件文件和 Quality Monitoring File(QMF)质量监控文件。 CAR CORRECTIVE ACTION REQUEST 纠正措施要求(即,不符合项) CERTIFICATION 证书Notice given by an OFFICIAL organization on the basis of the appropriate procedures or documents by which the component is recognized as being in compliance with STATUTORY requirements 官方认证机构基于适宜的程序或文件,认可零件符合法定要求的通知 CONFORMITY 符合Fulfilment of a requirement. Note: The term "CONFORMANCE" is a synonymous but deprecated. (ISO 9000 - 2000) 满足某一要求。注意: 与术语 "CONFORMANCE" 是同义词, 但不赞成使用. (ISO 9000 – 2000) CONTROL PLAN 控制计划Documented description of the systems and processes required for controlling component. (ISO TS 16949) 对控制零件所要求的体系和过程的文件化的描述. (ISO TS 16949) CSL CONTROLLED SHIPMENT LEVEL 1 and 2 : CSL1 and CSL2 are provisional procedures implemented with a view to guaranteeing certified deliveries while awaiting the re-establishment of the conformance of the production process. 受控发货等级 1 和等级2:CSL1 和 CSL2 是在等待重建合格的生产过程时,为了保证按需发货而实施的临时性程序。 DPM The indicator at each delivery/collection and cumulated at monthly bucket. The indicator DPM (non DELIVERED PARTS per MILLION) is measured at each delivery/collection and cumulated at monthly bucket. DPM = [ NPNOT / NPR ] x 1000000 NPNOT : Number of Pick-up order lines Not On Time NPR : Number of Pick-up order lines Requested by VALEO “Not On time” means the quantity received is not equal to the quantity ordered, at the time slot specified by VALEO in the Pick-Up Order. 该指标按每次交付/定购,每月累计。 DPM(每百万零件中未交付零件数量)该指标按每次交付/定购,每月累计。 DPM = [ NPNOT / NPR ] x 1000000 NPNOT:未按取货式订单时间交付的数量 NPR:法雷奥取货式订单要求交付的数量 “Not On time”意思是在法雷奥取货式订单规定的时限内收到的数量和订货数量不一致。

常用缩写名词解释

中兴公司常用缩写名词解释: 一、与开发过程/项目有关的名词: OTS:Off tool sample工装样件(首件) TTO:Tool Try-Out. 工装设备试运行/工装工艺路线调试/工装验证。 PP:Production Preparation/Production Prove-Out生产准备/试生产 1PP(First Phase of Production Prove-Out 第一次试生产)、2PP试生产的不同阶段SOP:Start-of-production批量生产 WBS:Work break down structure工作分解结构(项目管理PM工具之一)VPP——Vehicle program plan项目总计划(确定整个项目关键节点和时间进度的详细路标图)TDWP——Timing design work plan项目工作计划,包含各部门子计划的主要内容。 二、与质量管理有关的名词: FTT:First Time Through一次通过率 PPM:Parts per million 以百万分一为单位的不合格品率(此指标反映的是质量水平)ZCPA:中兴产品评审(站在用户角度进行的产品评审,引自福特FCPA- Ford Consumer Product Audit) 8D- 8 Discipline: D1:信息收集; D2:建立8D小组; D3:制定临时的措施,避免不良品流出; D4:定义和证实根本原因,避免再发生; D5:根据基本原因制定永久措施; D6:执行和确认永久措施; D7:预防再发,实施永久措施; D8:认可团队和个人的贡献。 五大工具: APQP:Advanced Product Quality Planning and Control Plan产品质量先期策划与控制计划 PPAP:Production Part Approval Process生产件批准程序 SPC:Statistical Process Control统计过程控制 MSA:Measurement System Analysis测量系统分析 FMEA:Failure Mode Effect Analysis 失效模式与后果分析 2008-6-24 (待续)

大众常用英文缩写词和概念

大众常用英文缩写词和概 念 Prepared on 24 November 2020

OTS-PVS-OS-2TP-PPAP-SOP —Off Tooling Sample工程样件。 即全工装状态下非节拍生产条件下制造出来的样件.用于验证产品的设计能力. 工程样件得到认可后形成的报告叫OTS认可报告,也叫工程认可报告。主要包括设计资料(图纸等设计资料),PSW(产品保证书)、实验合格报告(尺寸、性能、外观合格报告)、控制计划(CP)、设计失效模式分析DFMEA、实验室认可证书、BOM表(分供方物料清单)和测量系统分析(MSA)等。以上均为供方提供,受到需方审核。需方反馈供方时,输出为OTS(工程样件)认可报告。 批量试生产。小批量试生产(生产试制批量,大众术语)主要是对生产节拍及产品批量稳定性的评价。 零批量(在批量生产条件下的总演习),产品形成和批量成熟之间。一个过度阶段。应该是工装样件生产阶段,但要保证与正式批量生产相同的生产条件。是批量生产前的总演习,批产的全面验证;接下来就是SOP(标准作业程序),即批量生产。 正式批量供货前的2日试生产,用来验证批量能力。代表QPN(新零件质量提高计划)的结束。目标是获得批产认可;生产过程准备就绪;结束项目规划;在批产能力状态下,对整个过程的可靠性和适宜性做最后的审核。(两日试生产,大众术语),主要是验证供应商的批量供货能力。 part approval process 生产件批准程序。规定了包括生产件和散装材料在内的生产件批准的一般要求。PPAP的目的是用来确定供应商是否已经正确理解了顾客

工程设计记录和规范的所有要求,以及其生产过程是否具有潜在能力,在实际生产过程中按规定的生产节拍满足顾客要求的产品。 Operating Procedure标准作业程序。就是将某一事件的标准操作步骤和要求以统一的格式描述出来,用来指导和规范日常的工作。SOP是一种标准的作业程序。所谓标准,在这里有最优化的概念,即不是随便写出来的操作程序都可以称作SOP,而一定是经过不断实践总结出来的在当前条件下可以实现的最优化的操作程序设计。说得更通俗一些,所谓的标准,就是尽可能地将相关操作步骤进行细化,量化和优化的度就是在正常条件下大家都能理解又不会产生歧义。 QPN---Qualifizierungs-Programm Neuteile新零件质量提高计划,大众也叫质保工程验收书。是对外协件的跟踪体系。目的为保证各车型整体项目进度,得到符合约定质量和数量的外协件。从TMA(试制协议)开始,到SOP(标准作业程序)结束。在QPN中,2TP前有个质量前提为:提交BMG(产品工程性能检验认可)样品。提交OTS(工程样件),EM(首批样件检验)样品;提交PVS(批量试生产)样件;提交0S(零批量生产)。提交SOP(标准作业程序)。 BMG--- Bau-Muster-Genehmigung产品工程样件性能检验认可---B件必须提前得到德国研发部BMG认可(适用于欧洲)

福特项目节点名词解释

GPDS Milestone Description Management Review Alignment Management Review () presents and secures cross-functional Senior Management alignment regarding the Program's fundamental Business/Marketing/Technical assumptions (including initial content, scale, timing, investment, etc.) and agreement on the Program's role in supporting key corporate strategic/business needs (e.g. role in portfolio, vision, etc.). Remaining key issues & workplans are to be resolved prior to and agreement on any additional alternative studies to be conducted between & . Program Start The focus of is to further refine output of the MR Review into a prime strategy that defines the starting point for the Program (e.g. program assumptions, financial targets/status, product vision, manufacturing strategy, etc) This task is the responsibility of a small cross-functional team taking into account customer, business, technical and manufacturing perspectives. Program Strategy Confirmed Complete 1st Engineering Concepts, Attachment C's and Attribute System Requirements (Attachment D's) to provide multiple sets of feasible hardware concepts for System Selection. Review Attachment C's to agree on Prime Alternative and Targets. Study hardware alternatives for the product concept and prepare Program Direction Letter (PDL) and Bill of Material (BOM) for . All manufacturing long- lead funding (if required) is requested at this time. Program Target Compatibility Checkpoint All system/subsystems are selected & reconfirmed as compatible with QCWF targets and the Bill of Process (BOP). The major Marketing targets & attributes are confirmed and work continues in preparation for (Program Target Compatibility). For commodities with Supplier Engineering- On-Board (EOB) date at (per Key Commodity Plan) Sourcing Agreement Letters (SAL's) are signed. Program Target Compatibility The focus of is to use the output from the target alignment system selection and further refine programs targets. This task is the responsibility of a small cross-functional team taking into account customer, business, technical and manufacturing perspectives. Program Approval At ABS, QCWF targets and market equation are confirmed compatible and become objectives, Commercial and Program Agreements are signed, program objectives are approved, preliminary activities for mass production are initiated, the second of three Appearance Approval Process events (AA2) is completed, the final Interior / Exterior design is approved, the design data is released, and the Upper Body V2 activities are completed. Final Data Judgment At all engineering designs are completed, and data readiness for VP prototype tooling, build, test and production tooling is judged by Senior Engineering Management based on verification/validation during Upper Body V0/V1/V2 and results. Vehicle Milestone Names and Descriptions GPDS Milestone Names

长安福特常用缩写词(20200720234140)

(CP) Confirmation Prototype 确认样车 Final Status 最终状态 (J1) Job 1 整车投产 (PT) P/T Design Complete 动力传动系统设计结束PT(P/T)Power Train 动力传动系统 (ST) Surface Transfer 表面参数传递 Change Cut-Off 更改完成 Launch Readiness 投产准备就绪 Launch Sign-Off 投产验收 Program Approval 项目批准 Proportions & Hardpoints 比例与固定点 Product Readiness 产品准备就绪 Pre Milestone 1 SI前里程碑 1 Pre Milestone 2 SI前里程碑 2 Strategic Confirmation 策略确认 Strategic Intent 策略意向 Strategic Planning 策略计划 (SP) Structural Prototype 样车结构 (TTO) Tool Try-Out 工装设备试运行 Global 8D Eight disciplinary Actions G8D (福特公司解决问题的标准方法) 14D More Detailed than Global 8D (used to contain and resolve stop-shipment/recall problems) 更详细的细节(包括并解决停止运 货/召回问题) 1MIS One Month in Service 投入使用1个月 1PP First Production Proveout 第一次试生产 2PP Second Production Proveout 第二次试生产 3MIS Three Months in Service 投入使用3个月 4P Production Process Proveout Program 生产程序验证项目AAA American Automobile Association 美国汽车工业联合会ABS Affordable Business Structure 可承受商业结构ABS Anti skid brake system 防抱死制动系统AIAG Automotive Industry Action Group 机动车工业行动小组AIC Accelerated Implementation Centre 快速实施中心 AIM Automated Issues Matrix 问题结构图 AIMS Automated Issues Matrix System 问题结构图系统AME Advanced Manufacturing Engineering 先进制造工艺AMPPE Advanced Manufacturing Pre-Program Engineering 先进项目前制造工艺ANOVA Analysis of Variance 多样性分析

it常见专业词缩写及解释

IT常用专业词缩写 IT:IT = Information Technology,很明显是信息技术的意思 IE:Windows预安装环境,是带有限服务的最小Win32子系统,基于以保护模式运行的Windows XP Professional内核。 CPU Fan:中央处理器的“散热器”(Fan) MB:主机板MotherBoard RAM:内存Random Access Memory,以PC-代号划分规格如PC-133,PC-1066,PC-2700 HDD:硬盘Hard Disk Drive FDD:软盘Floopy Disk Drive CD-ROM:光驱Compact Disk Read Only Memory DVD-ROM:DVD光驱Digital Versatile Disk Read Only Memory CD-RW:刻录机Compact Disk ReWriter VGA:显示卡(显示卡正式用语应为Display Card) AUD:声卡(声卡正式用语应为Sound Card) LAN:网卡(网卡正式用语应为Network Card) MODM:数据卡或调制解调器Modem HUB:集线器 WebCam:网络摄影机 Capture:影音采集卡 Case:机箱 Moniter:屏幕,CRT为显像管屏幕,LCD为液晶屏幕 USB:通用串行总线Universal Serial Bus IEEE1394:新的高速序列总线规格Institute of Electrical and Electronic Engineers Speaker:喇叭 Printer:打印机 Scanner:扫描仪 UPS:不断电系统 IDE:指IDE接口规格Integrated Device Electronics,IDE接口装置泛指采用IDE接口的各种设备 SCSI:指SCSI接口规格Small Computer System Interface,SCSI接口装置泛指采用SCSI接口的各种设备 GHz:(中央处理器运算速度达)Gega赫兹/每秒 FSB:指“前端总线(Front Side Bus)”频率,以MHz为单位 ATA:指硬盘传输速率AT Attachment,ATA-133表示传输速率为 133MB/sec AGP:显示总线Accelerated Graphics Port,以2X,4X,8X表示传输频宽模式PCI:外围装置连接端口Peripheral Component Interconnect ATX:指目前电源供应器的规格,也指主机板标准大小尺寸 BIOS:硬件(输入/输出)基本设置程序Basic Input Output System CMOS:储存BIOS基本设置数据的记忆芯片Complementary Metal-Oxide

相关主题