搜档网
当前位置:搜档网 › 地铁隧道施工外文文献翻译

地铁隧道施工外文文献翻译

地铁隧道施工外文文献翻译
地铁隧道施工外文文献翻译

(含:英文原文及中文译文)

文献出处:Cocheril Y. Study on Construction Technology of Multi-Arch Tunnel Group in Urban Underground Railway[J]. Journal of Communications, 2015, 3(4):22-32.

英文原文

Study on Construction Technology of Multi-Arch Tunnel Group in Urban

Underground Railway

Y Cocheril

Abstract

In this paper, the construction method of the multi-arch tunnel group is discussed by using an engineering example of Metro Line 3. In the construction of the subway, the construction technique of changing a multi-arch tunnel into a single-hole tunnel was first proposed. The technical solutions of the single-middle wall and the separated middle-wall structure were compared and selected to meet the requirements of structural safety, construction safety, and economic efficiency. Good technical solutions can provide reference and reference for the design and construction of similar projects in the future. Keywords: multi-arch tunnel group, single middle partition wall, separated middle partition wall, construction technology

Because of the design requirements of the subway tunnel, a variety

of tunnel structures are required. Among them, a multi-arch tunnel segment consisting of unequal cross-linked arches and triple-arched tunnels is often used for the connection of the main line and the crossover line. This article combines the project example according to the geological conditions of the tunnel, the time limit requirements through comparison and selection of the best construction program that can achieve rapid construction and save construction costs.

1 Project Overview

The return line of Sports West Road Station on Metro Line 3 is a complex type of return line from Sports West Road Station. In the section , a tunnel group with unequal spans with double arches and triple arches was set up. Unequal cross-arch tunnel excavation span of 20.1m excavation height of 10.076m cross-vector ratio of 1:0.5 hole lining after the lining of 5.2m large-hole lining after the span of 11.4m in the wall thickness of 1.6m. The triple-arch tunnel excavation span is 19.9m and the 7.885m cross-vector ratio is 1:0.1. The surrounding rock of the section of the multi-arch tunnel is from top to bottom: artificial backfill, red sand and alluvial sand layer, alluvial-diluvial earth, fluvial-lacustrine sedimentary soil, plastic residual soil, hard plastic-hard residue. Soil, weathered rock formations, strong weathered rock formations, weathered layers, and weathered layers. Tunnels through the formation of more homogeneous rock strength, strong bearing capacity and stability. The

建筑类外文文献及中文翻译

forced concrete structure reinforced with an overviewRein Since the reform and opening up, with the national economy's rapid and sustained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced technology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce costs, and is of great significance. Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, some of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteristics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency. 1、steel mechanical link 1.1 radial squeeze link Will be a steel sleeve in two sets to the highly-reinforced Department with superhigh pressure hydraulic equipment (squeeze tongs) along steel sleeve radial squeeze steel casing, in squeezing out tongs squeeze pressure role of a steel sleeve plasticity deformation closely integrated with reinforced through reinforced steel sleeve and Wang Liang's Position will be two solid steel bars linked Characteristic: Connect intensity to be high, performance reliable, can bear high stress draw and pigeonhole the load and tired load repeatedly.

施工组织设计外文翻译

摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工

土木工程外文翻译隧道与地下空间技术

隧道与地下空间技术 2006 年 5-7 月刊,第 21 期,章节 3-4,第 332 页 釜山——巨济的交通系统:沉管隧道开创新局面 1 1Wim Janssen Peter de Haas Young-Hoon Yoon 荷兰隧道工程顾问:大宇工程建设公司釜山—巨济交通线隧道工程技术顾问 韩国大宇工程建设公司摘要 釜山—巨济交通系统将会为釜山和巨济两岛上的大城市提供一条道路连接。该沉管隧道有许多特点:长度达到千米,处于水下 35 米处,海况条件严峻、地基土较为软弱和线型要求较高。基于以上诸多特点,隧道的设计和建造面临着巨大的挑战。可以预见的是这项工程将会开创沉管隧道施工技术的新局面。本文突出论述了这些特点以及阐述在土木和结构方面的问题。1.工程简介 釜山是韩国的第二大城市和一座重要的海港。它位于韩国的东南部,其南面和东面朝向朝鲜海峡同时在釜山北部山势较为陡峭。该市发展迅速,近年来的人口增长超过 370 万(总计 460 万人)。人口密度达到 4850 人/km2,约为香港的 3/4。釜山市的进一步发展由于其所处的地理位置而受到限制。釜山—巨济交通系统在釜山和巨济岛之间创造了一条直接的联系线,以从客观上满足釜山的城市扩展,在巨济岛上发展工业区,以及为釜山市民在较短的行车距离内增加休闲娱乐的去处。巨济岛西侧目前已经与朝鲜半岛相连,在本项连接工程完工之后,从釜山市到巨济岛的驾车时间将由原来的 2 小时缩短为现在的 45 分钟。釜山—巨济交通系统将在巨济岛与 Gaduk 岛之间提供一条连接,使其成为连接釜山新港地区至巨济岛的双重高速公路体系的一部分。这一系统总计公里长,穿越海峡并将Daejuk Jungjuk 和 Jeo 三个无人小岛连接在一起。原则上该系统由一条长度为 3240m 的双向四车道沉管隧道和两座主跨 475,两边跨 230m 的斜拉桥组成。2.规划组织该项目是作为一个公私合作,共同建设的工程,GK 交通系统公司可获得设计、施工和运营的特许权,经营期限为 40 年。特许权基于该系统设计理念的一个环节。GK 交通系统公司由大宇工程建设公司领衔的 7 家特许权法人组成。TEC/Halcrow 等合资公司作为技术顾问,从工程开始便参与该项工程。Halcrow 与 TEC 两个合资公司分别负责关于桥梁和隧道建设方面的技术问题。永久设施的设计工作已接近完成,后续的建设的准备工作也已经开始。图 1. 工程地理位置图 2. 空中鸟瞰效果图设计要求和基本闲置因素该项目将 Gaduk 岛与巨济岛经 Daejuk Jungjuk and Joe island 三个小岛连接在一起,基本布局由三条航道的要求决定。位于 Gaduk 岛和 Daejuk 岛之间的主航道宽 1800m, 18m。 深由于这条航道没有官方的水深规定,因此选择以隧道的方式穿越成为一种可行的方案。另外两条位于 Jungjuk—Jeo 岛和 Joe—巨济岛的次级航道,最小宽度分别为435m 和 404m,各自的通航净空要求分别为 52m 和 36m。两条次级航道的水深均为 16m。鉴于 Daejuk 岛和 Gaduk 岛之间相对较为陡峭的海岸,开挖作业又是在海床以下 25至 30 米处,这就使得工程无法满足两岛之间的对准开挖。而为了驾驶的舒适与安全又不得不延长梯度线和坡长。因此,将穿越该水域的沉管隧道设置在略低于海床平面成为一个合理的选择。图 3. 线路纵剖面图岩土条件 地层在隧道线路方向上呈现出不同但是在纵向自上而下依次为典型的海洋粘土、海砂、砾卵石和海床基岩。 在沉管隧道沿线的海床主要以海洋粘土为主,除了在海岸线附近露出地表的海床、

土木工程外文文献翻译

专业资料 学院: 专业:土木工程 姓名: 学号: 外文出处:Structural Systems to resist (用外文写) Lateral loads 附件:1.外文资料翻译译文;2.外文原文。

附件1:外文资料翻译译文 抗侧向荷载的结构体系 常用的结构体系 若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。确实,较好的高层建筑普遍具有构思简单、表现明晰的特点。 这并不是说没有进行宏观构思的余地。实际上,正是因为有了这种宏观的构思,新奇的高层建筑体系才得以发展,可能更重要的是:几年以前才出现的一些新概念在今天的技术中已经变得平常了。 如果忽略一些与建筑材料密切相关的概念不谈,高层建筑里最为常用的结构体系便可分为如下几类: 1.抗弯矩框架。 2.支撑框架,包括偏心支撑框架。 3.剪力墙,包括钢板剪力墙。 4.筒中框架。 5.筒中筒结构。 6.核心交互结构。 7. 框格体系或束筒体系。 特别是由于最近趋向于更复杂的建筑形式,同时也需要增加刚度以抵抗几力和地震力,大多数高层建筑都具有由框架、支撑构架、剪力墙和相关体系相结合而构成的体系。而且,就较高的建筑物而言,大多数都是由交互式构件组成三维陈列。 将这些构件结合起来的方法正是高层建筑设计方法的本质。其结合方式需要在考虑环境、功能和费用后再发展,以便提供促使建筑发展达到新高度的有效结构。这并

不是说富于想象力的结构设计就能够创造出伟大建筑。正相反,有许多例优美的建筑仅得到结构工程师适当的支持就被创造出来了,然而,如果没有天赋甚厚的建筑师的创造力的指导,那么,得以发展的就只能是好的结构,并非是伟大的建筑。无论如何,要想创造出高层建筑真正非凡的设计,两者都需要最好的。 虽然在文献中通常可以见到有关这七种体系的全面性讨论,但是在这里还值得进一步讨论。设计方法的本质贯穿于整个讨论。设计方法的本质贯穿于整个讨论中。 抗弯矩框架 抗弯矩框架也许是低,中高度的建筑中常用的体系,它具有线性水平构件和垂直构件在接头处基本刚接之特点。这种框架用作独立的体系,或者和其他体系结合起来使用,以便提供所需要水平荷载抵抗力。对于较高的高层建筑,可能会发现该本系不宜作为独立体系,这是因为在侧向力的作用下难以调动足够的刚度。 我们可以利用STRESS,STRUDL 或者其他大量合适的计算机程序进行结构分析。所谓的门架法分析或悬臂法分析在当今的技术中无一席之地,由于柱梁节点固有柔性,并且由于初步设计应该力求突出体系的弱点,所以在初析中使用框架的中心距尺寸设计是司空惯的。当然,在设计的后期阶段,实际地评价结点的变形很有必要。 支撑框架 支撑框架实际上刚度比抗弯矩框架强,在高层建筑中也得到更广泛的应用。这种体系以其结点处铰接或则接的线性水平构件、垂直构件和斜撑构件而具特色,它通常与其他体系共同用于较高的建筑,并且作为一种独立的体系用在低、中高度的建筑中。

施工组织设计外文翻译

XXXXXXXXX 毕业设计(论文)外文翻译 学生姓名: 院(系): 专业班级: 指导教师: 完成日期:

施工组织设计的重要性 摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案 不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工程设计文件的重要组成部分,是编制工程投资概预算的主要依据和编制招投标文件的

桥梁结构设计外文文献翻译

桥梁结构设计外文文献翻译 (文档含中英文对照即英文原文和中文翻译) 结构设计 Augustine J.Fredrich 摘要:结构设计是选择材料和构件类型,大小和形状以安全有用的样式承担荷载。一般说来,结构设计暗指结构物如建筑物和桥或是可移动但有刚性外壳如船体和飞机框架的工厂稳定性。设计的移动时彼此相连的设备(连接件),一般被安排在机械设计领域。 关键词:结构设计结构分析结构方案工程要求 Abstract: Structure design is the selection of materials and member type ,size, and configuration to carry loads in a safe and serviceable fashion .In general ,structural design implies the engineering of stationary objects such as buildings and bridges ,or objects that maybe mobile but have a rigid shape such as ship hulls and aircraft frames. Devices with parts planned to move with relation to each other(linkages) are generally assigned to the area of mechanical . Key words: Structure Design Structural analysis structural scheme Project requirements Structure Design Structural design involved at least five distinct phases of work: project requirements, materials, structural scheme, analysis, and design.

有关隧道方面外文文献与翻译

A convection-conduction model for analysis of the freeze-thaw conditions in the surrounding rock wall of a tunnel in permafrost regions HE Chunxiong( 何春雄 ), (State Key Laboratory of Frozen Soil Engineering, Lanzhou Institute of Glaciology and Geocryology, Chinese Academy of Sciences, Lanzhou 730000, China; Department of Applied Mathematics, South China University of Technology, Guangzhou 510640, China) WU Ziwang( 吴紫汪 )and ZHU Linnan( 朱林楠 ) (State key Laboratory of Frozen Soil Engineering, Lanzhou Institute of Glaciology and Geocryology Chinese Academy of Sciences, Lanzhou 730000, China) Received February 8, 1999 Abstract Based on the analyses of fundamental meteorological and hydrogeological conditions at the site of a tunnel in the cold regions, a combined convection-conduction model for air flow in the tunnel and temperature field in the surrounding has been constructed. Using the model, the air temperature distribution in the Xiluoqi No. 2 Tunnel has been simulated numerically. The simulated results are in agreement with the data observed. Then, based on the in situ conditions of sir temperature, atmospheric pressure, wind force, hydrogeology and engineering geology, the air-temperature relationship between the temperature on the surface of the tunnel wall and the air temperature at the entry and exit of the tunnel has been obtained, and the freeze-thaw conditions at the Dabanshan Tunnel which is now under construction is predicted. Keywords: tunnel in cold regions, convective heat exchange and conduction, freeze-thaw. A number of highway and railway tunnels have been constructed in the permafrost regions and their neighboring areas in China. Since the hydrological and thermal

土木工程专业外文文献及翻译

( 二 〇 一 二 年 六 月 外文文献及翻译 题 目: About Buiding on the Structure Design 学生姓名: 学 院:土木工程学院 系 别:建筑工程系 专 业:土木工程(建筑工程方向) 班 级:土木08-4班 指导教师:

英文原文: Building construction concrete crack of prevention and processing Abstract The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processing Foreword Concrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the

施工组织设计外文文献翻译最新译文

文献出处: Phillip Yetton. The Study of Construction Organization Design [J]. International Journal of Project Management, 2015, 9(2): 33-43. 原文 The Study of Construction Organization Design Author: Phillip Yetton Abstract Building construction is a complex work, huge building products, the production cycle is long, is a collection of architectural art, architecture, function, structure, decoration, water supply, power supply, intelligent system for a wind. Need to complete a project unit, type of work well together, and in the process of implementing, also under the influence of various subjective and objective conditions around. In order to meet the quality, cost, time limit for a project, under the premise of safety goal task to complete a project, must according to the requirement of the construction unit and the characteristics of the proposed construction project, the various raw materials on the basis of full investigation, compile an used to guide the whole process of technology, economy and management of project construction comprehensive document, this document is the construction organization Keywords: Construction; Organization design; Project cost 1 Introduction Construction organization design is a construction project for the object establishment, to guide the project bidding, construction contracts, construction preparation, construction installation until the whole process of the final acceptance of the technology, economy and management comprehensive document, is to ensure that project smooth implementation effective programmatic document. Construction organization design is proper or not, will directly relate to the quality of the proposed construction project, cost, time limit, safety, etc. The smooth realization of the intended target. With the development of The Times, modern engineering project scale and the demand is higher and higher, project management has become increasingly complex, and the construction organization design also put forward higher requirements. The construction organization design, construction organization

隧道施工外文翻译

超大型土压平衡式盾构在 隧道施工中引发的地面沉降分析 1 摘要: 使用盾构法进行隧道施工会导致隧道周边的土体位移和地面的沉降,这就使得估测土体的位移和沉降变得尤为重要了。由于之前已做过很多研究,所以在该领域已取得突破。然而,对于超大型土压平衡式盾构机在隧道施工中所引发土体移位与沉降的研究还很罕见,其原因是该工法在世界范围内很少被应用,但近年来,该工法已经在城市地下铁道运输结构的施工中有所应并且前景广阔。由于高含水地层中的切应力作用会使土体中产生超孔隙水压力。在盾构停止推挤土体后孔隙水会逐渐消散,土压力也会逐渐减小。而且,土质移位和地面沉降将会发生。与小型盾构机相比,上述现象在超大型土压平衡式盾构机施工中更为明显,原因就是它超大的开挖面面积。通过对监测数据和工程实际的隧道参数进行分析,可以发现盾构隧道施工参数对开挖面上土压力的影响规律和超孔隙水压力的大小。而且,通过调整隧道的开挖参数,可以减小地面沉降。盾构尾部的空隙填充量可以由反演算法与镜像法来确定。可以依据空隙量来调整注浆量以减少地面的沉降量。在上海的两个工程实例证明了这种方法在以后工程施工中的价值。 2 关键词 超大型土压平衡式盾构、盾构法隧道施工、地面沉降、镜像法 3 概述 盾构法隧道施工因其低噪音和对路面交通影响小的优点而被广泛的应用在城市地下隧道工程的施工中。但是,对原状土的扰动和土层损失将不会导致土层形变和地面沉降,而且会破坏建筑与结构的稳定。盾构法施工已被广泛研究以至于取得了许多的瞩目成就。但是超大型土压平衡式盾构在世界范围内很少被使

用,而且盾构施工过程中的土体沉降也少有被研究。在以往对其他类型盾构隧道施工研究中,有两方面被作为主要的研究对象,即开挖面和盾构尾部。首先,现在对于开挖面失效模式的研究重点主要在破坏区形状方面而不是在土压力和超孔隙水压力方面。实际上,后来提到的两方面对于地面沉降是很重要的,特别是在砂土和粉土地层中。相比于小型盾构机,超大型土压平衡式盾构机的大断面开挖会引发土压力和超孔隙水压力的更大影响。通过研究这两方面因素,超大型土压平衡式盾构开挖面的土压平衡机质会被揭示出来。其次,在盾构隧道的尾部后端形成的空隙会在施工过程中被同步注浆。但是,在绝大多数情况下,空隙是不会被完全充填的,之后则会导致地面沉降。当凝结开始后,同步注浆的体积会有所减少,隧道衬砌结构的形变和扰动土的固结被视为引发盾构尾部土体沉降的首要诱因。然而,由于空隙未被充填完全而导致的泥浆渗入周围土层则很少作引发盾构尾部土体沉降的诱因而被进一步研究。对于超大型土压平衡式盾构机施工而言,这一点尤为重要。而且,在确定同步注浆质量方面具有很高的实践价值。 4 开挖面的研究 4.1 超孔隙水压力在隧道盾构中的浮动原则 超大型土压平衡式盾构机的施工方法主要是在开挖面后的土压力与土舱中的土压力之间寻求一个平衡。土舱中的土压力在计算时要考虑水文地质和隧道的埋深,表达式为h p k γ0 =,其中P 是平衡土压力和开挖面前端土体压力而且包括水压力;γ是土层的平均重度可以取为m kN 30.18;h 是土舱内压力传感器的 埋置深度,k 0是土的侧压力系数,范围是0.75~0.90,并且根据地面沉降的监测数据进行调整。 超大型土压平衡式盾构施工中的平衡状态是理想状态。当封闭结构前端的土体被刀盘挤压时,这种理想的平衡就会在刀盘的敞开面形式。随着刀盘的旋转和向前不断推进,土压力与超孔隙水压力也会有所增加,在此之后超孔隙水压力就会形成了。该压力在后期会逐渐消散而且导致土体固结和地面沉降。在超孔隙水压力增大时,土质结构会被更严重的破坏;当超孔隙水压力消散后,土层固结与

土木工程外文文献及翻译

Original Article Impact of crack width on bond: confined and unconfine d rebar David https://www.sodocs.net/doc/4c5693990.html,w1, Denglei Tang2, Thoma s K. C.Molyneaux3 and Rebecca Gravina3 (1)School of the Built Environment, Heriot Watt University, Edinburgh, EH14 4AS, UK (2)VicRoads, Melbourne, VIC, Australia (3)School of Civil, Environmental and Chemical Engineering, RMIT University, Melbourne, VIC, 3000, Australia David W. Law Email: https://www.sodocs.net/doc/4c5693990.html,w@https://www.sodocs.net/doc/4c5693990.html, Received: 14January2010Accepted: 14Decemb er2010Published online: 23December2010 Abstract This paper reports the results of a research project comp aring the effect of surface crack width and degree of corrosi on on the bond strength of confined and unconfined deforme d 12 and 16mm mild steel reinforcing bars. The corrosion was induced by chloride contamination of the concrete and

施工组织设计中英文对照外文翻译文献

施工组织设计中英文对照外文翻译文献(文档含英文原文和中文翻译)

施工组织设计的重要性 摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。

质量控制和安全施工外文翻译

本文献来源于: [1] 董祥. 土木工程英语. 2010(9):145-151 质量控制和安全施工 1在施工中存在的质量和安全问题 质量控制和安全问题对项目经理来说变得越来越重要。施工过程中的设备缺陷或故障可能会导致非常大的成本。即使有轻微缺陷, 也可能需要重新建设使设施运营受损。导致成本的增加和延误结果。在最坏的情况下,故障可能导致人身伤害甚至死亡。在施工过程中的事故可能导致人身伤害和巨大的花费。保险,检验和监管的间接成本迅速增加,会导致直接成本的增加。好的项目经理应尽量确保在第一时间完成任务,并且在工程中没有重大事故发生。 随着成本的控制,关于已完成设施的质量的最重要的决策是在设计和规划阶段,而不是在施工阶段。正是在该组件的配置,材料规格和功能性能这些初步阶段而决定的。施工过程中的质量控制主要是确保其是否符合原先的设计和规划决策。 虽然符合现有的设计决策是质量控制的首要重点,但也有例外的情况。第一,不可预见的情况下,错误的设计决策或希望通过在设备功能的所有者权益变动,可能在施工过程中要求对设计决策进行重新评估。虽然这些变化可能是出于关心质量,但他们意味着随之而来的所有目标和限制因素都要进行重新设计。至于第二种情况,一些明智且适当的设计决策就是取决于施工过程本身,例如,一些隧道要求在不同的位置作出一定数量支护的方法,就是根据土壤条件,观察在隧道里面的过程而做出的决策。由于这样的决定是基于有关工地的实际情况,因此该设施的设计可能会更符合成本效益的结果。任何特殊的情况下,重新设计的施工过程中都需要考虑各种因素。 在施工过程中以讲究一致性作为质量的衡量标准,质量要求的设计和合同文件中的说明将变得极为重要。质量要求应该是明确的、可验证的,能使项目中的各方都能够理解的一致性要求。本章的大部分讨论均涉及到发展和建设的不同质量要求,以及确保符合性的相关问题。 建设项目中的安全性也在很大程度上影响到规划设计过程中的决策。一些设计或施工计划本身就是又危险又很难实现的,而其他类似的计划,则可以大大降低事故发生的可能性。例如,从施工区域内修复巷道使得交通分道行驶可以大大降低意外碰撞

建筑外文文献及翻译

建筑外文文献及翻译

外文原文 Study on Human Resource Allocation in Multi-Project Based on the Priority and the Cost of Projects Lin Jingjing , Zhou Guohua SchoolofEconomics and management, Southwest Jiao tong University ,610031 ,China Abstract -- This paper put forward the affecting factors of project 'prsiority. which is introduced into a multi-objective optimization model for human resource allocation in multi-project environment . The objectives of the model were the minimum cost loss due to the delay of the time limit of the projects and the minimum delay of the project with the highest priority .Then a Genetic Algorithm to solve the model was introduced. Finally, a numerical example was used to testify the feasibility of the model and the algorithm. Index Terms —Genetic Algorithm, Human Resource Allocation, Multi- project 's project 's priority . 1.INTRODUCTION More and more enterprises are facing the challenge of multi-project management, which has been the focus among researches on project management. In multi-project environment ,the share are competition of resources such as capital , time and human resources often occur .Therefore , it 'csritical to schedule projects in order to satisfy the different resource demands and to shorten the projects 'duration time with resources constrained ,as in [1].For many enterprises ,the human resources are the most precious asset .So enterprises should reasonably and effectively allocate each resource , especially the human resource ,in order to shorten the time and cost of projects and to increase the benefits .Some literatures have discussed the resource allocation problem in multi-project environment with resources constrained. Reference [1] designed an iterative algorithm and proposed a mathematical model of the resource-constrained multi-project scheduling .Based on work breakdown structure (WBS) and Dantzig-Wolfe decomposition method ,a feasible multi-project planning method was illustrated , as in [2] . References [3,4] discussed the resource-constrained project scheduling based on Branch Delimitation method .Reference [5] put forward the framework of human resource allocation in multi-project in Long-

相关主题