搜档网
当前位置:搜档网 › GM 1927-03_SQ_SOR质量要求

GM 1927-03_SQ_SOR质量要求

GM 1927-03_SQ_SOR质量要求
GM 1927-03_SQ_SOR质量要求

1. Supplier Quality Base Requirements: 供应商质量基本要求

?This document is intended to be used in conjunction with and is in addition to the GM General Standard Terms and Conditions.该文件被视为GM的一般标准条款,以及标准条款的额外补充。

?All suppliers are expected to supply parts to General Motors with zero defects. Parts shall meet all engineering specifications and function with no abnormalities according to intent。所有供应商的供货应当是零缺陷的。零件必需符合工程以及性能要求。

?Funding is to be identified in the initial quote and subsequent quotes to reflect error occurrence detection (poka yoke, error proofing devices, etc) and defect outflow prevention to customers. Controls implemented at a later date are the financial responsibility of the supplier.为了阻止缺陷外流给客户或因需要防错而产生了额外费用,该费用应当在最开始的报价或之后的几轮报价中反映出来。后续控制所产生的费用应当由供应商自己承担。

2. ISO/TS 16949 - Quality System Requirements:质量体系要求:

?All providers of a) production materials, b) production or service parts, or c) heat treating, plating, painting or other finishing services directly to General Motors must be certified to ISO/TS 16949 by a Certification Body (CB) recognized by the International Automotive Task Force (IATF) and have a current certificate available

demonstrating compliance to GM supplements.所有与GM有关的原料,配件以及热熔焊,电镀,喷漆或其他加工服务,必须获得认证机构所颁发的TS16949认证并在有效期内。

?Effectiveness of the heat treating processes, the plating processes and the coating processes shall be demonstrated using the CQI-9 Heat Treat System Assessment, the CQI-11 Plating System Assessment, and the CQI-12 Coating System Assessment published by the AIAG and as required in the GM Customer Specifics.热处理,电镀,喷漆等特种加工工艺,必须获得AIAG美国汽车工业行动小组发布的CQI-9,CQI-11,CQI-12的评估认可。

? Welding and soldering process shall be compliant with CQI-15 Welding System Assessment and CQI-17 Soldering System Assessment published by AIAG.烧焊以及电焊必须符合CQI-15以及CQI-17的评估认可。

?Suppliers utilizing outside test facilities must provide evidence that the test facility is accredited per ISO/IEC 17025. The following groups are recognized to assess organizations that accredit Independent test and/or

calibration laboratories to ISO/IEC Standard 17025:2005.供应商使用委外的实验室做实验,其实验设备必须符合ISO/IEC17025标准,以下的几个组织是认可清单内的:

?National Cooperation for Laboratory Accreditation (website at https://www.sodocs.net/doc/728476352.html,/)

Note: NACLA does not require its member organizations to sign an MRA for recognition.全球实验室认可

合作组织,网址:https://www.sodocs.net/doc/728476352.html,

?International Laboratory Accreditation Cooperation (website at https://www.sodocs.net/doc/728476352.html,)

Note: The ILAC organizations are signers of Mutual Recognition Arrangements (MRA’s) which may

preclude them from accepting non-MRA signatory assessments. The MRA signatories do have

procedures that may allow acceptance of assessments conducted by other organizations. GM

encourages the utilization of these procedures. Specific concerns should be directed to the appropriate

MRA. 全球实验室认可合作组织,网址:https://www.sodocs.net/doc/728476352.html,

?Suppliers not certified to ISO/TS 16949, or those suppliers constructing or purchasing facilities to manufacture the parts being quoted, must include a defined certification attainment plan with their quote for further

consideration.供应商没有拿到ISO/TS16949认可的,或者供应商制造或者采购的设备没有获得认可的,为长远考虑,他们必须在报价时附上一个体系认可计划。

3. China Compulsory Certification (CCC) Supplier Requirements:CCC认证要求

It is the supplier’s responsibility to contact China Quality Certificate Centre (CQC)for CCC activities and ensure all

maintain their specific duns’ code to the CCC China Compulsory Certification requirements in GQTS (Global Quality

Tracking System) – Supplier Certification. A copy of the certificate for the part should be sent to GM Engineering

before PPAP or when saleable status is attained also email to SQ_Cert@https://www.sodocs.net/doc/728476352.html, (must include the duns’ code).

Web-site: https://www.sodocs.net/doc/728476352.html,/english/index.htm供应商承担CCC强制性认证责任,所有的零件不需满足CCC认

证。

4. General Motors Procedures and Reference Documents: 通用程序以及参考手册

Suppliers are to adhere to the requirements contained in the following documents.

Quality Planning Requirements:质量计划要求:

?APQP: Suppliers must use an advanced product quality planning process that follows the GM APQP Project Plan (GM1927-1) that ensures production readiness with parts that meet 100% o f the product’s specifications.按照APQP开发流程同步GM APQP项目开发,确保产品100%满足产品技术要求。

?Operator Training: Training plan must address new operators and current operators performing new functions. Training status should be displayed in the area of the manufacturing process.(Refer to QSB

Strategies)培训计划必须包含新老操作工的培训情况,培训应当在生产现场进行。明确上岗需具备的能力,以及新上岗所需的培训时间。

?Error Proofing: Suppliers shall implement error-proofing strategies for the control of materials, processes and labeling for all products provided to GM. Supplier shall implement error proofing techniques to ensure that mistakes are detected and corrected before becoming a defect (i.e. make it impossible to produce defective items even if an error occurs). Implementation of error proofing is to be measured by “% Error Proofed.” % Error Proofed is the percent of total steps in the manufacturing process which have been adequately error proofed.

The supplier must error proof to a level where it is not possible to ship defective products to GM. (Refer to QSB Strategies)供应商必须实施对材料,过程,标签,零件等的防错策略,确保错误在发生之前被探测以及纠正。供应商必须达到一个不可能错误的等级(参考QSB策略)

?Traceability: A Traceability scheme shall be developed in accordance with regional and divisional requirements. Traceability scheme may include manufacturing date code and lot control. Items to be traced shall be determined in during the APQP process. (Refer to QSB Strategies)根据内部以及外部制定一个可追朔性计划,包含制造日期以及批量控制。可追朔内容在APQP中体现。(参考QSB策略)

?Verification of Customer Used Features:Customer-used part features (examples: fit, form, function, mating surfaces, etc.) shall be incorporated in the PFMEA, process control plan, layered audits, and

error/mistake proofing. Additional items to be checked shall be defined during the APQP process. These features should be verified at a frequency of 100%. An AQC (Attribute Quality Characteristic) symbol should be used on the drawing to specify these characteristics. (Refer to QSB Strategies)顾客使用特种(例如匹配,形状,功能,装配等)应当体现在PFMEA,控制计划,分层审核以及防错措施里。这些特征应当被100%检验。AQC符号应当在图纸中标明。(参考QSB策略)

?Inspection Fixtures and Gages Requirements:检测设备以及检具的要求:

?Supplier to assume the gage construction orientates the part in vehicle position unless Supplier Quality approves a deviation.供应商需确保检具的制造基准与零件装车状态一致,除非SQE同意偏差。

?All customer monitored APQP parts shall have gage designs approved by the Supplier Quality Engineer or the appropriate customer gage approval group prior to the start of fixture construction (for your regional

requirements, contact your supplier quality engineer). Gage designs shall incorporate approved GD&T datum schemes and gages/fixtures must be capable to dimensionally evaluate parts.检具制造以前检具的设计需得到检具工程师以及SQE的批准,检具设计应当符合GD&T图纸对基准的要求,并具备检测全尺寸的能力。

?Supplier shall have product checking fixtures for sub-datum and openings where assembly plant or sequencer/sub assembler will install something that impacts a final vehicle specification (e.g. trim plates,

extension panel, grilles, glove box door, etc.).应当具备检测子基准的能力,一些开口特征需要与其他零件互配的。

?Supplier shall have the ability to check a completed assembly. Sub-contractors shall also have the ability to check component parts. Any cubing or build fixture shall have the ability to demonstrate fit to adjoining parts and attachments.检具需具备检测总成零件的能力,分供方也应具备检测分零件的能力。应具备模拟块检测对手件的能力。

?Appropriate functional testing and final inspection to ensure product performs as designed under actual vehicle conditions.适当的功能检测以及最终检测来确保产品符合设计和装车要求。

?Supplier shall ensure that fixtures are procured in a timely manner to meet major program benchmarks (i.e.

first shots, GP-11, PPQP (Preproduction Part Quality Process) PPO (Pre-Production Operations) Build Shop

供应商应用三坐标检测第一个软模样件或者第一个硬模样件。

?Part Specific SOR GM1927-3a:特定零件SOR

?Supplier must comply with all requirements of the Part-Specific SOR when applicable. Compliance to the Part-Specific SOR is required for PPAP full approval. Any permanent deviation to a Part-Specific SOR must

be authorized by the Supplier Quality Director.供应商需完全满足特定零件SOR的要求,这也是FULL PPAP

的要求。任何的偏差必须得到GM SQE总监的批准。

?For any Creativity Team / SMT that supplies a module with electrical or electronic content, in addition to the Part Specific SOR GM1927-3a dedicated t o the sourced part’s Commodity, the supplier must also comply

also to the GM1927-3a Electrical Systems Components (Radio-Display_Speakers-Amplifiers_Vehicle-Information-

Display_Electronic-Modules_Switches_Integrated-Center-Stacks_HVAC-Front –Rear Controls).pdf. Supplier must sign

it and it’s Lessons Lea rned must be implemented in the product and the manufacturing process.一些开发小组,供应整个电子模块的,供应商除了要满足特定零件SOR外,还需签字并将整个经验总结应用到产品开发和制

造上。

?Quality Systems Basic Requirements: 质量体系基础要求:

?At the Technical Review during the General Motors Sourcing Process, the supplier must provide documentation that shows the supplier currently meets General Motors Quality System Basic (QSB) requirements; or, formally

commitments to have processes, procedures and controls in place that meet QSB requirements by the Program’s Supplier Gate Review #3 if awarded the business.

?在投标阶段,供应商必须提供TR技术分析,证明其符合通用汽车的QSB质量体系基础要求。或正式的承诺具体的过程,方法,控制手段去达成QSB要求,在质量阀#3开阀之前。

The required documentation shall include:要求的文件需包含:

?Supplier currently meets the QSB requirements:供应商目前符合QSB要求的状态:

- A copy of the most recent (Passed) QSB audit performed. 最近通过QSB审核的复印件

- Plan and attainment of (Passed) status of QSB version March 2009. QSB 2009版,计划与目标达成状态

- GM SQ will track those suppliers that have (Passed) QSB in GQTS (2009) / Creativity Team Bid list (Planned 2010)。GM SQE将在GQTS上追朔这些供应商是否通过了QSB审核/供应商投标清单。

? A new supplier or a supplier that doesn’t meet QSB requirements:新供应商或供应商没有符合QSB标准:

? A formal action plan, including timing, signed by the supplier’s senior leadership to implement the QSB elements into th e supplier’s processes, procedures and controls by APQP Gate 3.一个正式的行动计划,包含

时间计划,由供应商总经理签字,以确保其有能力符合QSB要求,在APQP质量阀3之前。

6. Quality Control Requirements:质量控制要求:

?Layered Audits:分层审核A documented layered audit plan shall exist with a minimum frequency of once per shift or as agreed per the GM SQE. Non-conformities shall be addressed immediately and corrective action

shall be documented. Audit plan shall include multiple levels of management. Site leadership shall conduct and verify compliance to the documented plan. (Refer to QSB Strategies)分层审核,每班一次。不符合项需出具行动

计划,审核计划需包含多个管理层。

?Containment: 政策All non-conforming and suspect material must be controlled. Method must be clearly defined. Visual controls should be implemented. All non-conforming material must be segregated and identified.

GP12 shall be implemented during launch. Upon request of GM, additional levels of proactive containment may

be required. When a problem is reported it is expected that all suppliers implement effective and immediate

containment and comply fully with GP-5 requirements otherwise controlled shipping may result. (Refer to QSB

Strategies)不符合项以及可疑物料必须得到控制,控制方法,探测方法清晰定义,不符合材料必须隔离并标识,

GP12必须实施,如果GM有要求,前瞻性的措施也应当实施。当一个问题报告了,就说明该问题已得到有效控制,符合GP5的要求,再发生缺陷,将导致受控发运。

Quality Performance Metrics:质量指数Each Supplier’s Senior Management shall commit to maintain and continuously improve quality. GQTS (Global Quality Tracking System) monitors performance data for PPM, PRRs, Controlled Shipping Level I and II, Major Assembly Plant Disruptions, ISO/TS16949 and ISO14001

Certifications. Suppliers shall monitor their quality performance, on-line, through GQTS. (Refer to QSB

Strategies)每个供应商质量负责人必须致力于保证并持续改进产品质量,在GQTS上在线监视PPM值,PRR,受控发运等级,关键总成零件突发事件,ISO/TS16949,ISO14001 证书等。

?Production Quality: 产品质量All suppliers are required to have effective manufacturing practices and procedures to ensure a continuous flow of defect free parts into GM production facilities. (Refer to QSB

Strategies)所有供应商需确保具备一个经实践证明的,安全可靠的生产物流线路,来确保没有缺陷样品发送到GM 造车工厂。

?Current Product Improvement Process (CPIP):在产零件改进程序Suppliers shall actively participate in the timely resolution of problems identified by GM’s CPIP. Suppliers shall provide appropriate corrective

action documentation and project status updates as requested.(Refer to QSB Strategies)供应商应积极参加GM 的CPIP活动,并提供适当的行动计划,更新,以满足要求。

7. Capacity Planning and Manufacturing System Requirements:产能规划以及制造系统要求

?Supplier shall have the ability to design and install adequate capacity to meet the daily contract requirements in one production day while operating under normal operating conditions and under total customer load.供应商必须设计并安装足够的产能去满足每天的合同产量以及最大的顾客需求量。

?Supplier must comply with all requirements of GP9 Run at Rate process including completion of the GM1927-35 run at rate workbook.供应商必须满足GP9审核的要求,并完成GM1927-35工作表。

?Suppliers are required to demonstrate their ability to meet GM contractual requirements through both system capacity analysis (Shared Capacity Sheets, Manufacturing System Capacity Estimate) and actual R@R

production to verify accuracy of the analysis.供应商必须有能力证明其完全满足GM的合同要求量,通过产能分析及制造系统分析以及重复再现性生产去验证该产能的准确性。

?Supplier shall confirm in writing that all subcontractors supplying parts or services meet all quality and contractual requirements for the manufacturing of the GM contracted components to the GM Tier 1 or VAA/Sequencing.GM的一级供应商需书面确认其分供方的的产品质量,产能等满足GM的生产要求。

8. GM-Specific PPAP Requirements:GM PPAP要求

?Compliance with International Material Data System (IMDS) is required for approved PPAP status.IMDS需得到批准

?“GM3660 Commodity Validation Sign-Off” is required for approved PPAP status when supplier is responsible for validation. GM3660需得到批准

?Compliance with GMW15862 “Bar Code Content, Format, and Label Requirements for Part Identification, Verification, and Traceability” is required when applicable. CG2503 “Bar Code Label Validation Content and

Format Form” is required for approved PPAP status for all new PN’s when a 2-dimensional bar code is specified on the part drawing (effective September 1st, 2011).条形码以及二维码符合要求

?GM1411 PPAP Worksheet is required when submitting for less than approved PPAP status (non-saleable or saleable status).GM1411 PPAP 工作表提交,如果不能完全满足PPAP状态

?Refer to “GM Specific Instructions for PPAP 4th Edition” for more information (included in TS16949 Customer Specifics document located at AIAG website). GM PPAP 第4版的要求

?These requirements are in addition to the standard AIAG PPAP requirements. 这些要求是AIAG PPAP之外的特殊要求

Advance Problem Solving Requirements: 高级问题解决要求

Suppliers are required to demonstrate their capability to solve complex problems using advanced problem solving techniques such as the “Red X” system at GM. (Refer to QSB Strategies) 供应商需证明其具备解决复杂问题的能力,使用高级问题解决技巧例如“RED X”系统(参考QSB策略)

10. Production Support Requirements:生产支持要求

?On-Site support during pre-production and launch: 试生产以及前期造车在线支持Upon request of SQ or GM Plant, Supplier will provide on-site support during all pre-production build phases and

production launch activities. 按照SQE或者GM工厂的要求,前期造车许安排在线服务人员。

?Supplier contacts for all shifts: 每个班次供应商联系人Supplier shall designate a specific supplier representative that will support each of the GM Plant’s shifts. At a minimum the supplier designate should have

the responsibility to:供应商许指定在线服务人员,对应GM工程的每个班次,许承担以下职责:

?Implement immediate countermeasure to contain discrepant parts and to confirm that defective parts are not shipped to GM Plant.遏制缺陷零件发运到生产线上

?Approve GM Plant’s/SQE’s requests for rework and sort.按照SQE或GM工厂的要求返修以及筛选零件

?Coordinate and provide resources to rework and sort parts.协调并提供资源返工及筛选零件

?Provide sub-assemblies / components for required repair, related to quality issues.根据相关质量问题,提供返修零件

?Provide clear information regarding any defective parts in-route to GM Plant (how to identify defect, disposition guidelines).提供缺陷零件清晰信息给GM工厂(例如如何定义缺陷零件,处置方案)?Coordinate special delivery of certified OK parts.协调并快递合格零件

?Quality data:质量数据Supplier must provide quality-related data (e.g. historic inspection, first time quality, and reject data) to GM upon request. This data may be required to determine trends and to root cause quality

problems at the GM Manufacturing or Assembly Plant. (Refer to QSB Strategies)供应商需提供质量数据(例如以往检测数据,首次质量问题,报废率)给GM,该数据用以确认问题的方向以及问题产生根源。(参考QSB策略)

11. Tier 1 Responsibilities (including suppliers of complex systems/sub-assemblies):

一级供应商职责

?The tier one supplier is responsible for implementing or enforcing compliance to AIAG & GM requirements for all components of the assembly including directed buy parts unless otherwise specified by a written agreement from GM Purchasing.一级供应商需承担贯彻并实施AIAG&GM要求的责任,包括所有分零件以及总成零件以及DB件,免除条款需有GM采购的书面同意。

?GM may choose to assign an SQE to work along with the tier one on selected sub-supplier components.GM会指派一名SQE与一级供应商一起协同工作。

12. Value Added Assembler Responsibilities: VAA分装商职责

?The Value Added Assembler is responsible to control and record breakpoint changes resulting from EWO’s, PPAP level and quality level changes of all incoming material. The Value Added Assembler is responsible to

assure that the correct PPAP and design level part is used for the given manufacturing build event (MCB, MVNS, MVS, SSF, SORP, etc).分装商承担由EWO引起的所有来料断点以及管控职责,并保证正确的PPAP零件提供给GM 造车。

?The Value Added Assembler is not responsible for the PPAP of the individual components, but is responsible for control of those within their facility. 分装商不承担单个独立零件的PPAP认可,但对装配设备负责。

Powertrain Suppliers:动力总成供应商

Powertrain suppliers must adhere to the Supplier Quality Statement of Requirements Powertrain Addendum.

14. Systems and Procedures Access系统以及程序通道

?Suppliers shall have internet access to effectively communicate with General Motors. GM Supplier Quality procedures and systems can be accessed through the GM SupplyPower web page (https://www.sodocs.net/doc/728476352.html,) and also GQTS (Global Quality Tracking System) web page link below.

(https://https://www.sodocs.net/doc/728476352.html,/apps/gqtsr6prod/GQTSWeb/metrics/loadMetrics.do)供应商应该具备GQTS帐号并保持与GM的有效沟通。

?Suppliers shall have access to the Global Analytical Report Tools (GART) warranty reporting system as appropriate.供应商应适当的链接GART售后报告系统,了解售后状态。

?Information regarding Automotive Industry Action Group (AIAG) documents can be found at the following websites. 美国汽车工业行动小组AIAG文件可在以下网站下载

General AIAG https://www.sodocs.net/doc/728476352.html,

Europe Adare w https://www.sodocs.net/doc/728476352.html,/qs/

Brazil IQA https://www.sodocs.net/doc/728476352.html,.br

15. Required Quality Information at Global APQP Technical Review (Task #2) TR资料里对质量

信息的要求。

Please gather the following information in a binder or envelope marked “Quality” and submit it with your bid package. If you have any questions relative to the required information, please contact your GM Supplier Quality Engineer for clarification. All information must relate to the

manufacturing site that the product will be manufactured and must reference the RFQ number and part numbers.All listed information is required in your Quote Package. Be prepared to answer questions during the Technical Review Meeting.请搜集以下信息,作为一个捆绑文件,并注明“质量”二子,打包放在TR投标资料里,如果有任何问题不明确的,可以联系GM的SQE澄清。

Note: Referenced GM 1927 documents indicate required formats as specified

Powertrain Addendum

1. Process Capability & Control Requirements:

Xp=Cp & Xpk=Cpk: for stable processes with normal distribution of measured values

Xp=Pp & Xpk=Ppk: for stable processes with non-normal distribution of measured values Standard Product Characteristic– Those characteristics where reasonably anticipated variation is unlikely to significantly affect function or performance of the product. Some standard product characteristics may be

designated as Documentation Required (DR).

Documentation Required (DR) - Those standard characteristics which are important to function and where

reasonably anticipated variation outside of the specification is likely to have moderately negative consequences.

2. Cleanliness Requirements:

Cleanliness requirements for all parts will be defined in the Product Engineering Statement of Requirement and on the part print drawing.Part and process cleanliness shall be considered during the development of the PFMEA.

Appropriate actions shall be taken during the APQP process as driven by the PFMEA RPNs. The supplier shall use GMW 16037 Test Method to Quantify Cleanliness of Powertrain Components.

Body, Interior, Exterior, Chassis and Electrical Addendum

1. Requirements:

Mean Shift of the Specifications

For all features Identified on a Component/Assembly GD&T, the combination of process capability (based on CP 1.67) and mean shift with CPK defined below must demonstrate parts to be within tolerance. If a mean shift exists that prevents a supplier from meeting part tolerances with CPK requirements below, tooling must be corrected to enable compliance to specification.

2. Capability:

For Key Product Characteristics (KPCs) and Product Quality Characteristics (PQCs).

reference GMW 15049 and AIAG PPAP Manual. clauses 2.2.9

If during Product / Process development you believe there will be difficulty meeting the above capability, you MUST immediately notify your Supplier Quality Engineer (SQE) and develop a plan to assure compliance and/or obtain formal written approval to deviate from the capability requirements.

3. Part Monitoring:

The Component control plan must contain part monitoring requirements as defined in the SOR appendix C1 as well as any additional requirements defined by the supplier and approved by supplier quality.

SGM全球项目中对新建、扩建厂房供应商的一般要求

SGM General Requirements to Greenfield / Brownfield Supplier of Global Program Addendum 对于新建(扩建)厂房的供应商,必须在SQE发出QUAD报告前的归定时间期限内提供以下信息:

For China Green and Brownfield suppliers, the information below should be provided within the required dates to enable the completion of the sourcing recommendation.

1. 提交书面的建厂(扩建)、质量体系认证、通过SGM PSA评审(PPAP前)的计划,包括但不限于下面的内容:

- 是否在国内找合资/合作伙伴,如果是,合资/合作方的公司名称?;

- 工厂选址和公司注册成立的最后期限 (仅适用于新建厂供应商);

- 购买/获得土地和厂房完工的最后期限;

- 人员招聘和培训

- 非SGM配套供应商需提供国内及申报海外业务的兄弟公司的近期质量表现记录

Provide written plans for construction or procuring a manufacturing facility, quality system certification and

commitment date to pass the Shanghai GM Potential Supplier Assessment (SGM requires for PPAP). The plans should include:

-Will there be a partnership with a Chinese entity? If yes, please identify the entity.

-What is the due date to decide the plant location and company registration (Greenfield only)?

-What is the due date for buying the land for the manufacturing plant? What will be the plant's construction capacity?

-What is the schedule for hiring personnel along with the schedule for training personnel?

-Non-SGM suppliers shall provide the quality performance of its quoted location including its global quality

performance for the quoting commodity.

2. 海外母公司/总部对国内工厂的详细支持计划(包括人员和时间)。对于仅有设计职能的供应商,需提供支持国内项目的

工程及总成级产品认可计划。

What is the Headquarters' support plan for the local plant (Whom, position, when and length of support)?A Supplier, who has design responsibility, shall provide the plans of engineering support and production validation at the

assembly level.

3. 识别国内区别与海外公司在原材料/工装/设备等方面存在的制造工艺差异,提供针对自产或委外加工产品或过程的相应控

制措施,以确保所生产的产品符合全球质量标准。

Provide a manufacturing process gap analysis in material, tooling and equipment of China operations that will not be congruent with the global manufacturing footprint. Define the countermeasures to either in-house or outsourcing part/process and assure the unique operations can provide product to the global quality standard.

4. 如果供应商没有按时提交上述计划和承诺,SGM SQE将拒绝推荐该供应商,并且在发出QUAD报告后,不再接受事后补

交。

If the supplier fails to provide the plans and commitments on time, SGM cannot provide a recommendation. If the plans are provided following the recommendation required date, SGM SQE may not reconsider.

5. 新建(扩建)厂房的供应商须确保中国工厂的所有关键工艺与其他区域的供应商工厂完全一致。针对出

于产量或成本考虑的非关键工艺的变差,供应商应进行识别、风险评估和制定相应控制措施,并通知

SGM SQE。

Greenfield (Brownfield) supplier shall ensure that all critical process in China plant is same as that in other regions.

Concerning variation in non-critical process taking into account output or cost, supplier shall assess risk upon the variation and take corresponding control measures, as well as inform SGM SQE.

Supplier Representative Signatures Required :

All of the requirements in the Supplier Quality SOR have been reviewed and the compliance to them is fully accepted by supplier, exception made to what is reported in the attachment of Team Feasibility Commitment as feasible (Changes recommended) or not feasible (Design revision required to produce product within the specified requirements).

Commodity / Product Type GM Program / Program Year

Supplier Chief Engineer Supplier Chief Engineer / Date

(Signature) (Please print name)

Supplier Program Manager Supplier Program Manager / Date

(Signature) (Please print name)

建筑工程施工现场的质量控制要求

建筑工程施工现场的质量控制要求 建筑工程施工现场的质量控制要求提要:建筑工程应按下列规定进行施工质量控制:1)建筑工程采用的主要材料、半成品、成品、建筑构配件、器具和设备应进行现场验收 来自 建筑工程施工现场的质量控制要求 一、基本规定 1、施工现场质量管理应有相应的施工技术标准,全的质量管理体系、施工质量检验制度和综合施工质量水平评定考核制度。施工现场质理管理可按本标准附录A的要求进行检查记录。 2、建筑工程应按下列规定进行施工质量控制: (1)建筑工程采用的主要材料、半成品、成品、建筑构配件、器具和设备应进行现场验收,凡涉及安全、功能的有关产品,应按各专业工程质量验收规范规定进行复验,并应经监理工程师检查认可。 (2)各工序应按施工技术标准进行质量控制,每道工序完成后,应进行检查。 (3)相关专业工种之间,应进行交接检验,并形成记录。未经监理工程师检查认可,不得进行下道工序施工。 3、建筑工程施工质量应按下列要求进行验收: (1)建筑工程施工质量应符合本标准和相关专业验收

规范的规定。 (2)建筑工程施工应符合工程勘察、设计文件的要求。 (3)参加工程施工质量验收的各方人员应具备规定的资格。 (4)工程质量的验收均应在施工单位自行检查评定的基础上进行。 (5)隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收,并应形成验收文件。 (6)涉及结构安全的试块、试件以及有关材料,应按规定进行见证取样检测。 (7)检验批的质量应按主控项目和一般项目验收。 (8)对涉及结构安全和使用功能的重要分部工程应进行抽样检测。 (9)承担见证取样检测及有关结构安全检测的单位应具有相应资质。 (10)工程的观感质量应由验收人员通过现场检查,并应共同确认。 4、检验批的质量检验,应根据检验项目的特点在下列抽样方案中进行选择: (1)计量、计数或计量-计数等抽样方案。 (2)一次、二次或多次抽样方案。 (3)根据生产连续性和生产控制稳定性情况,尚可采

铁塔的分类安装及控制

项目4-9 通信铁塔工程监理的质量控制 一、铁塔及通信铁塔分类 (一)铁塔分类: 按材质分为:角钢组装塔、钢管组装塔、锥管塔 按作用类型分为: 1、通讯塔 通讯塔一般又称为通讯铁塔、通信铁塔,多建于地面、楼顶、山顶,塔架采用角钢材料,辅以钢板材料和钢管材料组成,塔架各构件之间采用螺栓连接,全部塔架构件在加工完毕后经过热镀锌防腐处理。角钢铁塔由塔靴、塔身、避雷塔、避雷针、平台、爬梯、天线支架、馈线架及避雷引下线等部件组成 2、装饰塔 装饰塔集装饰、通信、避雷、景观等多功能为一体,多建于高层建筑及楼顶上,也可作为标志性建筑建于广场、游乐园、风景区等。装饰塔又称为工艺装塔,塔架材料一般以钢结构为主,外层表面多采用钛金材料和不锈钢材料,其外形多种多样,配以灯光装饰效果更突出。 3、微波塔 微波塔又称为微波铁塔、微波通信铁塔,多建于地面、楼顶、山顶。微波塔承风能力强,塔架多采用角钢材料辅以钢板材料,也可全部采用钢管材料组成,塔架各构件之间采用螺栓连接,全部塔架构件在加工完毕后经过热镀锌防腐处理。角钢铁塔由塔靴、塔身、避雷塔、避雷针、平台、爬梯、天线支架、馈线架及避雷引下线等部件组成。 4、避雷塔 避雷塔有三脚圆钢避雷塔、四脚角钢避雷塔、钢管避雷塔、独立避雷针等多种形式,其材料有圆钢材料、角钢材料、钢管材料,完全按国家相关标准制造,完全能够达到国家防雷要求,避雷塔加工完毕后全部进行热镀锌处理,三十年不生锈。避雷塔的高度一般在10米—40米,有特殊要求的设计高度可达120米。本产品广泛用于易燃易爆生产单位和储存单位。 5、拉线塔 拉线塔又称为桅杆结构,其特点是用钢量少,造价低,但占地较大,多用于

中海地产工程规范-塑钢门窗工程

塑钢门窗工程规范 一、材料 1.塑钢门窗框 1.1塑钢型材应提供型材质量保证书,至少保证10年内无老化、 不退色,并附材料检验报告。 1.2塑钢门、窗抗风压指标不得低于2000Pa;空气渗透性、雨水 渗透性、隔声量三项物理性能指标达到国家规范要求的Ⅵ级标 准。 1.3门窗中竖框、中横框或拼樘料等主要受力杆件中的增强型钢, 应在产品说明中注明规格、尺寸。加强型钢厚度应≥1.2mm, 表面必须进行防腐、防锈处理,镀锌厚度应≥12μm。 1.4塑钢门、窗框进场检查: 1.4.1框体外观检查:门窗框焊脚不得开焊、型材断裂等损坏现象、 框型不得翘曲变形。表面应平整、光滑、色泽一致,无划痕、 碰伤。 1.4.2框体钢衬检查:应采用磁铁对钢衬装配的完整性进行辅助检 查,如发现存在问题时,则必须对框体进行拆除检查,以确保 塑钢窗体质量。 1.5塑钢门、窗框外露表面应贴好塑料保护膜,中竖框、中横框应 四边贴膜,边框应三边贴膜,安装面严禁贴膜;保护膜应完整、

平顺、无气泡。 1.6进场的门窗框应按照栋号及窗型进行编号,并在每樘上进行标 识,以免误装返工。 2.玻璃 2.1玻璃进场时,应检查品种、颜色及厚度,确保符合设计要求, 且表面无划痕、边角无碰伤。 2.2除满足以上要求外,中空玻璃腔内还不得有结露、及妨碍透视 的污迹、夹杂物、密封胶飞溅等现象。中空玻璃的边缘封胶必 须严密,以免导致腔内进水等质量问题。 2.3单层玻璃最小厚度不小于6mm,且对于七层以上的部位,若 面积大于1.5㎡的,其厚度不得小于8mm,若在1.5~2㎡的,厚度不得小于10mm,2㎡以上其厚度不得小于12mm;七层 以上或安装高度20m以上外窗必须采用安全玻璃。 2.4玻璃进场,玻璃两面应贴保护膜,防止砂浆污染和焊渣损坏玻 璃面。 3.密封胶 3.1防水密封胶应采用中性硅酮耐候密封胶,密封胶颜色必须经设 计师确认后方可使用。 3.2密封胶条应采用三元乙丙胶条。 4.五金及安装配件 4.1铰链材质要求采用304不锈钢系列,厚度3mm,如采用摩擦 铰链,应采用方槽,槽宽度一般要达到22mm;方槽不锈钢厚

组塔专项现场施工方法

组塔专项施工方案 2016年03月01日 巴中笔山-镇龙35kV新建线路工程 (一标段N1-N31) 4.2作业方法和要求 1钢管抱杆规格、结构.........................................5页2钢管抱杆的吊装方式.........................................5页3钢管抱杆组塔要求...........................................5页4钢管抱杆的组装.............................................6页5钢管抱杆的竖立.............................................6页6钢管抱杆的固定.............................................8页7钢管抱杆的提升.............................................8页

8塔材的吊装.................................................9页9钢管抱杆拆除..............................................12页10塔材组装要求.............................................13页11作业活动的分工和职责.....................................15页5质量标准及验收....................................15页 6危险点分析及控制措施...............................16页 7安全文明与环保要求.................................17页 2.2本公司制定的程序文件 ?《送电线路施工过程控制程序》(编号:MP16) ?《高处作业控制程序》(编号:MP21) 3作业准备 3.1作业所需的机具、工具、仪器、仪表的规格及要求 铁塔吊装组立所需的主要工器具由公司机具站发放;对于自购的工器具,必

铁塔工程质量控制

通信铁塔工程质量控制 为了在施工监理中做到质量,投资,工期的有效控制,在通信铁塔工程施 工阶段是定一下质量控制点:进场材料,铁塔基础,铁塔安装。 一,质量控制点及控制要求 (一)进场材料的质量控制点 材料质量是工程质量的基础,材料质量不符合要求,工程质量也就不可能复合标准。所以,加强材料的质量控制,是提高工程质量的重要保证。 材料进场时,承包地安慰应填写进场材料报验单,并附钢材和其它材料的质量证明书和实验报告报送监理单位。 监理单位收到报验单后,应会同建设单位,承包单位一起对进场材料进行清点,检查构建种类,数量,质量是否符合要求。方法可采取目测,量测等。主要检查构建是否有变形(包括运输中的变形及焊接变形),构建的尺寸规格是否符合设计图纸的要求,并用镀层测厚仪抽测构建的镀锌厚度。如有变形,必须要求承包单位在安装前进行矫正,并且要求当环境温度低于-16℃时,不得对构建进行冷矫正。对于每个界面主材拼接只允许一根,斜材最多只充许二根,焊接时必须熔透,且应做探伤检查(两根斜材不在同一面)。 如对材质有异议时,应按国家有关标准作抽样检验,结果符合国家标准的规定和设计文件的要求时方可采用。采用进口钢材和代用材料时,必须提供材料的机械性能和化学成分,并进行抽样检验,没设计同意后方可采用,也可进行出厂前检收。 (二)铁塔基础验收的质量控制点 铁塔基础施工阶段的建立由土建监理工程师实行,质量控制点同钢筋混凝土工程,在此不再描述。 在铁塔安装以前,铁塔基础应有建设单位,监理单位会同土建承包单位,设计单位和铁塔安装承办单位进行联合验收。验收时,土建承包单位应交验下列技术文件: △设计文件(包括设计变更通知和材料代用证明文件) △材料质量证明书或材料复验报告 △隐藏工程记录 △混凝土抗压强度实验报告 △基础混凝土工程施工记录 △土建基础复测记录 △地阻测试记录(一般的地租应<5Ω) 联合检查验收的结果应符合设计要求和国家有关这两验收规范.并根据基础验收治疗符合各项数据. (三)铁塔安装的质量控制点 铁塔安装前,监理人员应审定批准承包单位的施工组织设计或施工方案.铁塔安装可采用单间吊装,矿大拼装(单根杆件品塔城组合杆件进行吊装)和综合安装,有条件时,还可采用整体七班的方法安装.各种安装方法的质量控制点 1,采用广大品装时的质量控制点 对容易变形的构建,监理人员应要求承包单位做强度和稳定性验算,需要时,应采取加固措施. 2,采用综合安装时的质量控制点 监理人员应查验承包单位划分的独立单元是否合理;每一体系的全部构建安装完毕后,是否具有足够的空间刚度和可靠地稳定性

装饰装修工程施工工程质量要求及质量控制内容

装饰装修工程施工工程质量要求及质量控制内容 一、质量方针和质量目标 严格按照公司ISO9001 质量标准进行施工管理,确保“一次性验收合格”。 为了达到该质量总目标,在施工全过程中,以目标管理统揽全局,以经济承包为杠杆,以全面推广应用ISO9001 国标质量标准为手段,开展质量管理工作,将单位工程质量总目标分成各分部工程、分项工程的分目标,各质量分目标落实到具体人头上,并实行经济承包,实行关键工序、关键时候重奖重罚、使每个项目员工和目标直接相关,对目标负责,并给每个项目员工以压力、以动力、最大限度地调动和发挥每个员工的生产积极性和聪明才智,提高员工的质量意识。 为了确保该工程施工质量达到现行施工及验收规范的合格标准,并为争创省优工程打下良好基础,必须建立行之有效的质量保证体系,把质量保证活动系统化、标准化、制度化、使整个工程实现全面的质量和控制。按GB/T9000-ISO9000 系统标准,根据公司质量保证体系的要求,结合本工程的实施情况,建立由公司总工程师领导、项目技术负责人负责的质量管理机构,使整个质量保证体系协调运作,工程的质量始终处于受控状态。

实行目标管理,进行目标分解,按单位工程及分部分项工程落实到责任部门和人员,除公司质量监督部门和项目技术负责人外,现场另安排专职质监员跟班作业,按照公司质量保证体系文件规定,使项目各部门到各施工班组,层层落实质量职责,明确质量责任。 积极开发质量管理(QC)小组的活动,工人、技术人员、项目领导“三结合”,针对技术质量关键组织攻关,积极做好QC 成果的推广应用工作,最后实现单位工程合格并争创优质样板工程的目标。 二、质量要求 工程质量包括产品质量和工作质量两部分。 (1)产品质量: 产品质量包含以下六个方面: a. 适用性:要求装饰效果良好,使用方便; b. 可靠性:要求结构安全可靠,强度、稳定、抗震等性能符合有关技术标准的规定; c. 耐久性:在物理、化学作用下可安全使用到规定年限; d. 经济性:工程造价低、建造周期短、使用维修费低等; e. 美观:装饰造型先进合理、美观、新颖、大方,并与建筑环境协调; f. 安全性:主要指施工方便和使用安全;

铁塔安装施工方案

铁塔安装施工方案 1.编制说明 本施工组织设计作为指导施工的依据,对项目管理组织机构设置,劳动力计划安排,材料供应安排,机械设备配置,主要分部分项工程施工方法,工期保证措施,质量安全保证措施,保证安全生产、文明施工、减少扰民、降低环境污染和噪声的措施给予了充分考虑,突出质量创优、技术先进、经济合理、安全适用的原则。 1.1 编制依据 1.1.1 2011年度铁塔建设管理规定。 1.1.2 设计研究院设计的各专业施工图和地质勘察报告。 1.1.3 现场调查咨询获取的资料及施工条件。 1.1.4公司《质量手册》和《程序文件》。 2.安装人员组织结构 安装共人员3名其中 队长:1名 登高人员:1名 地面拼装人员:3名 安全质量人员:1名 3.机械配置 吊车(25吨-8吨):各1台 4.施工工艺流程 进行现场调查→施工管理组织机构分工→铁塔构建进场→安装铁

塔构、部件清点→施工计划→每段的拼装和吊装→平台安装→吊装→螺 丝的紧固→铁塔垂直度的校正→自检→验收。 4.1 现场调查 在铁塔、构件到场之前需对安装现场的地貌、水文地质、气象和周 边环境及障碍物作出勘察、并对给排水、供电等协调。 4.2 施工组织分工 按照公司的工程管理组织分工、把所有相关工程安装的事项按排落 实到人头,其中有关安全、质量、当地居民关系、政府相关法规法律、 规定由组长和安全员负责。 4.3 构件的清点 为了确保铁塔的安装顺利和质量,所有构件必须按照图纸、发货清 单清点数量、如发现构件与图纸不符的、应及时与监理和设计院联系。 如是制造厂家的质量问题及时更换以确保施工的质量。 4.4 施工计划 安装组长应根据现有的人员、机械器材、物料拟定施工计划、在环 境允许的情况下普及公司安全相关规定。 4.5 每段的拼装和吊装 每节段的构件安装大致可以分成塔身和平台二步进行,安装时塔身 先与地脚螺栓对接并拧紧,直至不动为止,再吊装平台。 4.6 螺丝的紧固 先检查预埋件地脚螺栓是否有松动,如有松动,用扳手拧紧直至螺帽不动。然后登高人员分别从铁塔的每一个角自上而下紧固螺帽,每个螺帽

中海地产工程规范-人工挖孔桩工程

人工挖孔桩工程规范 一、材料 1.钢筋笼 1.1钢筋笼制作应采取焊接连接。钢筋笼成型后,应在主筋内侧每 隔2.5m加设一道Ф25mm的加强箍,以防止吊放时扭曲变 形。 1.2长度过大(以调运设备的最大起吊高度确定)的钢筋笼,为便 于吊运,应分段制作。 1.3钢筋笼吊放前,应在钢筋笼四侧主筋上每隔3~4m设置一个 Ф20mm钢筋的耳环作定位垫块之用,确保保护层厚度达到 70mm。 2.混凝土 2.1护壁混凝土:护壁砼应严格按配合比下料搅拌, 坍落度控制在 50~80mm为宜,为提高早期强度可适当添加早强剂。 2.2桩身混凝土:桩身6m以上部分,砼坍落度宜控制在80~ 100mm;桩身较深部位(通常为6m以下),因人工振捣难 度加大,砼坍落度宜控制在100~150mm,以便于利用砼大 坍落度下落时冲击力使砼自身密实;桩身深度大于12m时, 为防止混凝土离析,宜采用导管灌筑,砼坍落度应满足和易性 的要求,以利于导管输送。

二、施工工艺 1.作业条件 1.1桩基施工前应调查地下管线的分布情况,并从规划控制点引测 出两个现场测量基准点和周边邻近建筑物上的测量标记,基准 点应设置在不受施工影响的地方,以利于桩基施工过程中进行 桩基定位控制及建筑物观测。 1.2利用引测基准点,按基础平面图在施工现场设置桩位轴线、定 位点及测定高程水准点。开工前,经复核后应妥善保护,施工 中应定期复测。 1.3场地及四周应设置排水沟、集水井,并制定泥浆和废渣的处理 方案及施工现场的出土路线,以确保施工路线畅通。 1.4全面开挖之前,应选择性地先挖两个试验桩孔,分析土质、水 文等有关情况,由项目主管工程师组织设计单位、监理单位及 施工单位以此为依据修编施工方案,并制定整体的施工顺序。 2.操作工艺 2.1桩孔开挖: 2.1.1当桩净距小于2倍桩径且小于2.5m时,应采取间隔开挖,以 减少水的渗透和防止土体滑移。 2.1.2开挖桩孔应从上到下逐节进行。每节开挖时,应先挖中间部分 的土方,然后扩及周边;扩底部分开挖时,应采取先挖桩身圆 柱体,再按扩底尺寸从上到下削土修成扩底形状。控制开挖桩 孔的截面尺寸应满足设计桩径加2倍护壁厚度的要求,孔径允

组塔施工作业指导书

华润新能源随县香湾风电项目110kV 升压站扩建及35kV集电线路工程 铁塔组立作业指导书 四川成蜀电力建设有限公司 华润新能源随县香湾风电项目110kV升压站扩建及 35kV集电线路工程施工项目部 二0一六年四月

批准:____________ ________年____月____日审核:____________ ________年____月____日编写:____________ ________年____月____日

目录 第一节总体说明 (1) 一、工程概况 (1) 二、铁塔安装统一规定 (3) 三、组塔规定及注意事项 (5) 第二节地锚、缓冲器及卡接绳环 (5) 一、地锚 (5) 二、缓冲器 (6) 三、临时钢丝绳扣 (6) 第三节内悬浮内拉线抱杆分解组塔 (7) 一、抱杆的布置 (7) 二、抱杆的竖立 (7) 三、内拉线的设置 (8) 四、抱杆的提升 (8) 五、抱杆的拆除 (9) 六、塔材的起吊 (10) 七:主要工器具 (10) 八、劳动力组织 (11) 第四节内悬浮外拉线抱杆分解组塔 (12) 第五节无拉线小抱杆分解组塔 (14) 第六节横担安装 (15) 第七节安全保证措施 (16) 第八节质量保证措施 (17)

第一节总体说明 一、工程概况 工程概况 本工程主要工作内容为华润新能源湖北随县香湾风电场集电线路工程及升压站扩建工程, 包含110kV天河口升压站扩建及风电场内35kV集电线路工程Ⅰ、Ⅱ、Ⅲ回集电线路双回路、单 回路的铁塔基础,铁塔组立,铁塔基础处理,导、地线架设,通讯光缆架设(及敷设),光缆接头, 铁塔接地,电缆敷设。 本工程场内35kV集电线路共设计3回线路,分别为Ⅰ、Ⅱ、Ⅲ回线路,可细分为9个单回线路,2个同塔双回线路。35kV集电线路单回路线路长度公里、双回路公里、直埋电缆线路公里(集电线路长度)、直埋电缆线路公里(箱变~线路终端)、直埋电缆线路公里(线路终端~升压站6kV柜进线端子)。 本工程导线采用JL/G1A-120/25、JL/G1A-185/30和JL/G1A-240/30钢芯铝绞线,地线采用OPGW-24B1-42(20AC)及OPGW-48B1-61(35AC)复合光缆。 本工程共使用铁塔157基,其中单回路直线塔21基,单回路转角塔73基,单回路终端塔 8基,双回路直线塔19基,双回路转角塔 29基,双回路终端塔3基,单回路T接塔3基,双 回路T接塔1基。

铁塔安装质量控制要求

精心打造 铁塔安装监理工作的控制要点 (一)、移动通信铁塔安装质量控制 材料是铁塔工程的基础,材料质量是直接关系到工程质量的重要部分。 材料进场时,承包单位必须填写进场报验单,并附钢材和其他材料质量证明单、试验报告报送监理单位。 监理单位收到报验单后,会同建设单位、承包单位一起对现场材料进行清点,检查铁塔构件的尺寸、种类、数量、规格和镀锌厚度等外观质量,是否符合设计要求、检查的方法以自检、自测和按照国家有关规定作抽样试验为主,结果必须符合国家标准。 1、移动通信铁塔的材料控制 (1)焊条必须采用E43,质量必须符合GB5118-85规定、焊剂质量必须符合GB1308-85规定; (2)如采用新材料,要有权威机构鉴定证明、使用说明及检验报告; (3)构件数量、重量、质量必须符合设计要求。 (4)对于构件、钢材要进行抽样送检。 钢材质量必须符合GB700-88、GB1591-94及YB168-70规定,钢材必须有质量证明书,并符合设计文件的要求,如监理单位对材质有疑义时,必须按国家有关标准作抽样检验,结果符合国家标准的规定和设计文件的要求时方可采用。 (5)构件尺寸、规格必须符合设计要求,如有变形,必须进行矫正,并且要求在环境温度低于-16℃时,不得对构件进行冷矫正。 (6)钢材表面的锈蚀、麻点或划痕的深度不得大于该钢材厚度负偏差值的一半,断口处如有分层或裂缝缺陷等,监理单位将会同有关单位研究处理。 (7)拉线塔用的钢丝绳、钢绞线(拉线)等材料、性能质量必须符合国家有关规定和设计文件要求。 (8)构件外型和几何尺寸允许偏差必须符合表1-1之规定: 表1-1 构件外型和几何尺寸允许偏差 (9)采用进口钢材和代用材料时,监理人员必须要求承包单位提供材料的机械性能及化学成份,并必须符合国家标准,同时还 要进行抽样检验,经Array设计单位审核同意 后方可采用。 (10)连接螺栓必须 采用六角头螺栓,其 螺栓、螺母、垫圈必 须符合 GB5780-86、 GB41-86及 GB95-85规定。 (11)连接材料(焊 条、焊丝、焊剂及各 种用于制作螺栓和 铆钉的材料等)和镀 敷材料(热浸锌、热 喷涂锌铝和无机富 锌涂料等)以及涂料 (底漆、面漆)均必 须附有符合国家标 准的质量证明书,并 符合设计文件要求;(12)严禁使用药皮脱层或焊芯生锈的焊条,受潮结块或已溶烧过的焊剂以及有锈蚀、裂纹、碰伤或混批的高强度螺栓;(13)对于每一层节间主材只允许接一根,斜材最多允许二根(且不在同一面),每根杆件拼接只有一处,焊接时必须熔透,且必须做无损探伤检查。 2、移动通信铁塔的构件防锈的镀层厚度控制 ①、构件防锈的镀层厚度要符合要求; ②、铁塔构件一般必须采取热镀锌工艺,其镀锌层质量必须符合下列要求: (1)外观:热镀锌构件表必须具有均匀、光滑,在连接处不允许有毛刺、满瘤和多余结块,并不得有过酸洗或露铁等缺陷。(2)镀锌附着量和锌层厚度:镀件厚度小于5mm时,锌附着量必须不低于460g/m2,即锌层厚度必须不低于65μm;镀件厚度不小于5mm时,锌附着量必须不低于610g/m2,即锌层厚度必须不低于86μm。 (3)均匀性:镀件的锌层必须均匀,用硫酸铜溶液浸蚀四次不露铁。

建筑工程施工过程质量控制要点

工程施工过程质量控制点 A 结构工程质量控制点 A.1土方开挖工程 1.【控制点】 (1)对定位放线的控制 (2)基底超挖。 (3)基底未保护。 (4)施工顺序不合理。 (5)开挖尺寸不足,边坡过陡。 (6)未设置排水沟、集水井,或采用井点降水。 (7)基坑高边坡未保护。 (8)深基坑未编制专项施工方案。 2.【预防措施】 (1)对定位放线的控制 场地平整应经常测量和校核其平面位置、水平标高和边坡坡度是否符合设计要求。平面控制桩和水准控制点应采取可靠措施 加以保护,定期复测和检查;土方不应堆在边坡边缘。 (2)基底超挖 根据结构基础图绘制基坑开挖基底标高图,经审核无误方可使用,需要和设计管理部确认地面构造做法,避免总包单位施工 时由于超挖导致的回填。土方开挖过程中,特别是临近基底时, 派专业测量人员控制开挖标高。 (3)基底未保护 基坑开挖后尽量减少对基土的扰动,如基础不能及时施工时,应预留 30cm 土层不挖,待基础施工时再开挖。 (4)施工顺序不合理。

开挖时应严格按审核通过的施工方案规定的顺序进行,先从低处开挖,分层分段,依次进行,形成一定坡度,以利排水。 (5)开挖尺寸不足,边坡过陡 基底的开挖宽度和坡度,除考虑结构尺寸外,应根据施工实际要求增加工作面宽度,同时放坡坡度需要根据边坡土层(岩层) 的不同来确定坡率。 (6)未设置排水沟、集水井,或采用井点降水 在软土地区基坑开挖深度超过3m,尤其是地下水丰富或者水头较高的地区,一般就要用井点降水。开挖深度浅时,亦可边开挖边用排 水沟和集水井进行集水明排。 (7)基坑高边坡未保护 结合边坡土层(岩层)、施工周期及施工季节(是否雨季)确定高边坡的保护方案。常用基坑坡面保护方法有:1.薄膜覆盖或砂浆 覆盖法。2.挂网或挂网抹面法3. 喷射混凝土或混凝土护面法4. 土 袋或砌石压坡法 (8)深基坑未编制专项施工方案 根据现场情况和地勘设计提供的资料,编制深基坑专项施工方案, 该方案需要报监理和甲方审批。甲方需要结合项目实际情况,重 点把控成本、进度和安全。 A.2地下防水 1.【控制点】 (1)材料选择。 (2)空鼓。 (3)渗漏。 (4)施工缝位置处理 2.【预防措施】 (1)材料选择

中海地产项目施工现场形象规范(试行)

附件1:中海地产项目施工现场形象规范(试行) 附件1 中海地产项目施工现场形象规范(试行)

【目的】: (3) 【适用范围】: (3) 【实施时间】: (3) 【规范内容】: (3) 1、施工现场大门 (3) 2、施工现场围墙 (4) 3、项目公告图牌 (4) 4、项目部名牌 (5) 5、办公室门牌 (5) 6、办公室内图牌 (5) 7、胸卡制作规范 (6) 8、现场办公室 (6) 9、现场会议室 (6) 10、现场门卫室 (7) 11、现场生活区 (7) 12、现场食堂 (7) 13、现场卫生间 (8)

14、洗车场地 (8) 15、现场临时施工道路和排水 (8) 16、服装与标志组合 (9) 17、机械设备 (10) 18、施工现场楼体形象广告分布 (10) 19、品牌旗 (10) 【目的】: 加强中海地产项目施工现场管理,体现中海地产“过程精品、楼楼精品”的开发理念,树立中海地产项目品牌形象,提升中海地产品牌的知名度、认知度。 【适用范围】: 中海地产开发及管理的所有项目。 【实施时间】: 自本规范印发之日起执行。 【规范内容】: 施工现场大门(详见附件) 材质:为金属管焊制栅拦式或为板式(薄钢板或不锈钢板)。 规格:大门为对开门或四开门,总宽度为6000-8000mm,高度为2000mm,每扇门的宽度宜为3000mm或2000mm。 颜色:为白色或不锈钢色。 文字:每扇门正中安装一块为1000×3000mm或1000×2000mm(高×

宽)的薄钢板或宝丽板,颜色为中海红色,上面用白色专体书写“中海地产”字样,如门为薄钢板制成,正腰则涂为红色,面积同上。 门柱:截面尺寸建议为800×800mm,高度为2200mm,其中200mm为柱帽高度,柱帽为阶梯形,门柱通体颜色与围墙协调一致,门柱帽上方可加灯,各地区公司根据项目需要自行决定。 施工现场围墙(详见附件) 形式:砖砌式或可重复使用的金属式,各地区公司可自行选择。 规格:高度为2000mm,颜色为白色。其中围墙上端200mm宽,下端300mm宽为红色。 砌筑式标准组合:标识为红色,字为黑色,标志尺寸为700×700mm,位臵居于白色墙体正中,即距上下红色边均为400mm。 金属式标准组合:采用钢板围墙等同于砌筑式围墙;采用金属栅栏围墙,可在栅栏居中位臵焊接1000mm高的薄铁板,颜色为白色,标志尺寸为700×700mm,标志为红色,字为黑色。 组合形式:自大门侧起间隔出现“中海地产”上下标准组合和售楼广告位。如在施工期间不需要设臵售楼广告位,则该位臵由“中海地产”上下标准组合替代。 项目公告图牌(详见附件) 包括:中海标志、工程概况、施工总平面图、组织架构图,各单位可根据实际情况增加防火须知、安全管理规定、文明施工管理规定等。 图牌应位于大门口处显要位臵。 图牌规格:图牌为长方形,建议采用横式,其长宽比例为3:2,可

建筑工程项目质量管理要求

建设工程项目质量计划管理 建设工程项目质量计划管理应贯穿项目管理的全过程,坚持“计划、实施、检查、处理(PDCA)循环工作方法、持续改进过程的质量控制。 项目管理应遵循的程序:1、明确项目质量目标2、编制项目质量计划3、实施项目质量计划4、监督检查项目质量计划的执行情况5、收集、分析、反馈质量信息并制定预防和改进措施。 项目质量计划的编制 建筑工程施工质量计划是指确定施工项目的质量目标和如何达到这些质量目标的组织管理、资源投入、专门的质量措施和必要的工作过程。 一、建筑工程施工项目质量计划编制依据 1、工程承包合同、设计图纸及相关的文件。 2、企业和项目经理部的质量管理体系文件及其要求。 3、国家和地方相关的法律、法规、技术标准、规范,有关施工操作规程。 4、施工组织设计、专项施工方案及项目计划。 二、建筑工程施工质量计划编制要求 1、质量计划应在项目策划过程中编制,经审批后作为对外质量保证和对内质量控制的依据。 2、项目质量计划是将质量保证标准、质量手册和程序文件的通用要求与项目联系起来的文件,应保持与现行质量文件要求的一致性。 3、项目质量计划可高于但不能低于通用质量体系文件的要求。 4、项目质量计划应明确所涉及的质量活动,并对其责任和权限进行分配;考虑相互间的协调性和可操作性。

5、质量计划应体现从工序、分项工程、分部工程到单位工程的过程控制,且应体现从资源投入到完成工程质量最终检验和试验的全过程管理与控制要求。 6、项目质量计划应由项目经理组织编写,需报企业相关管理部门批准后实施。 7、当现行产品技术状态发生显著变化时,应考虑改进和完善项目质量计划。 三、施工项目质量计划的主要内容 1、编制依据; 2、项目概况:工程总体概况,设计概况,新成果、新技术推广应用计划,工程特点、施工难点与相应措施。 3、质量目标:企业理念、项目的质量目标及目标分解,项目的其他目标,关键工序和特殊过程。 4、项目质量管理体系:项目质量管理体系策划,项目质量管理人员职责和权限,项目质量管理体系要素分配。 5、项目资源管理:项目人员配备及管理,项目的其他资源配备及管理。 6、产品实现:产品实现的策划,与顾客有关的过程,采购,生产和服务提供,监视和测量装置的控制。 7、测量、分析和改进:监视和测量,不合格品控制,数据分析、改进。 8、文件和记录的控制:文件控制,记录控制。 9、创优措施:保证质量措施、成品保护措施,保证工期措施。 10、项目质量计划的管理:编制、审核与审批,管理组织,发放范围,使用。饱食终日,无所用心,难矣哉。——《论语?阳货》

组塔施工方案

悦城至石井水泥厂 110kV送电线路工程 杆塔组立施工技术手册肇庆市恒电电力网络工程有限责任公司

批准: 初审: 编写: 日期:年月日肇庆市恒电电力网络工程有限责任公司

目录 一、工程概况 1 二、技术措施 1 原材料检查 1 施工前准备 2 铁塔分解组立 3 混凝土杆分解组立 4 三、质量保证措施8 四、安全措施10 五、组织体系11 附表一分解组立杆塔施工组织体系表12 附表二分解组塔地面布置图14 附表三分解组立混凝土杆布置图15 六、环境保护方案及文明施工16

一、工程概况: 本工程为110千伏悦城变电站至110千伏广州石井德庆水泥厂变电站送电线路工程。由110千伏悦城变电站110千伏出线构架至110千伏广州石井德庆水泥厂变电站的110千伏构架止,线路全长约3.696公里,单回路架设,全线架设两根架空避雷线。因出线走廊狭窄,该线路悦城站出线1号,2号塔与永丰线路双回路同塔架设。全线杆塔共12基,其中:耐张塔7基;直线塔2基;直线杆3基。 本工程导线采用LGJX-185/30型稀土钢芯铝绞线,避雷线采用XLXGJ-35型稀土合金镀层钢铰线。绝缘子采用FXBW4-110/70型合成绝缘子,耐张绝缘子采用每单联串8片LXHY4-100型耐污钢化玻璃绝缘子。 二、技术措施: (一)原材料检查: 1、铁塔加工制造的质量应符合现行国家标准《输电线路铁塔制造技术条件的规定。 2、预应力混凝土电杆的制造质量应符合现行国家标准《环行预应力混凝土电杆》的规定。 3、组装用的螺栓必须热浸镀锌,其加工质量应符合国家现行标准《输电铁塔用热浸镀锌紧固件》的规定。 4、混凝土电杆的铁横担加工质量应符合现行国家标准《输电线路铁塔制造技术条件》中的有关规定。抱箍及其他钢件加工的质量应符合现行有关标准的规定。 5、预应力钢筋混凝土和普通钢筋混凝土预制构件的加工尺寸允许偏差应符合表一的规定。并应保证构件之间,或构件与铁件、螺栓

建筑工程施工中的质量控制与安全管理详细版

文件编号:GD/FS-9864 (管理制度范本系列) 建筑工程施工中的质量控制与安全管理详细版 The Daily Operation Mode, It Includes All Implementation Items, And Acts To Regulate Individual Actions, Regulate Or Limit All Their Behaviors, And Finally Simplify The Management Process. 编辑:_________________ 单位:_________________ 日期:_________________

建筑工程施工中的质量控制与安全 管理详细版 提示语:本管理制度文件适合使用于日常的规则或运作模式中,包含所有的执行事项,并作用于规范个体行动,规范或限制其所有行为,最终实现简化管理过程,提高管理效率。,文档所展示内容即为所得,可在下载完成后直接进行编辑。 一、质量与安全在施工中的意义 (一)、引言 在我国的经济建设和社会发展中,建筑行业占据重要的地位和作用。在我国现阶段的工程项目建设中,房屋建设工程所占的比例较大,多位民用,商业,工业等形式建筑。其施工中的质量控制和安全管理不但关系到人民群众的生命和财产安全,而且对于区域的经济发展和社会稳定具有重要意义。 (二)、现阶段常见的质量与安全问题 近几年来,在我国的房屋建筑工程施工中频繁出现各类质量问题和安全事故。如房屋倒塌倾斜,天花

板渗漏,墙面起壳起砂裂缝等等,其主要原因是质量控制和安全管理不到位而其造成的社会危害性也是不容忽视的。房屋建筑工程施工中出现质量问题,必然会影响建筑的整体作用性能和安全性能,为今后的使用留下安全隐患。由此可见,房屋建筑施工中的质量控制和安全管理不到位并不是单纯的管理问题,而是国内建筑行业的整体现象,也客观损害了我国建筑行业的整体形象,对于行业的发展和进步是极其不利的。 二、建筑施工中存在的问题及其原因 (一)、建筑工程质量的特点 建筑工程质量的特点的是由建设生产特点决定的。工程及其生产的特点概括起来有以下几点: 1) 产品的固定性,生产流动性 2) 生产的多样性,生产的单位性

中海地产项目施工现场形象规范试行

【最新资料,Word版,可自由编辑!】 【目的】: (3) 【适用范围】: (3) 【实施时间】: (3) 【规范内容】: (3) 1、施工现场大门 (3) 2、施工现场围墙 (4) 3、项目公告图牌 (4) 4、项目部名牌 (5) 5、办公室门牌 (5) 6、办公室内图牌 (5) 7、胸卡制作规范 (6) 8、现场办公室 (6) 9、现场会议室 (6) 10、现场门卫室 (7) 11、现场生活区 (7) 12、现场食堂 (7) 13、现场卫生间 (8) 14、洗车场地 (8) 15、现场临时施工道路和排水 (8) 16、服装与标志组合 (9)

17、机械设备 (10) 18、施工现场楼体形象广告分布 (10) 19、品牌旗 (10) 【目的】: 加强中海地产项目施工现场管理,体现中海地产“过程精品、楼楼精品”的开发理念,树立中海地产项目品牌形象,提升中海地产品牌的知名度、认知度。 【适用范围】: 中海地产开发及管理的所有项目。 【实施时间】: 自本规范印发之日起执行。 【规范内容】: 施工现场大门(详见附件) ?材质:为金属管焊制栅拦式或为板式(薄钢板或不锈钢板)。 ?规格:大门为对开门或四开门,总宽度为6000-8000mm,高度为2000mm,每扇门的宽度宜为3000mm或2000mm。 ?颜色:为白色或不锈钢色。 ?文字:每扇门正中安装一块为1000×3000mm或1000×2000mm(高×宽)的薄钢板或宝丽板,颜色为中海红色,上面用白色专体书写“中海地产”字样,如门为薄钢板制成,正腰则涂为红色,面积同上。

?门柱:截面尺寸建议为800×800mm,高度为2200mm,其中200mm 为柱帽高度,柱帽为阶梯形,门柱通体颜色与围墙协调一致,门 柱帽上方可加灯,各地区公司根据项目需要自行决定。 施工现场围墙(详见附件) ?形式:砖砌式或可重复使用的金属式,各地区公司可自行选择。 ?规格:高度为2000mm,颜色为白色。其中围墙上端200mm宽,下端300mm宽为红色。 ?砌筑式标准组合:标识为红色,字为黑色,标志尺寸为700×700mm,位置居于白色墙体正中,即距上下红色边均为400mm。 ?金属式标准组合:采用钢板围墙等同于砌筑式围墙;采用金属栅栏围墙,可在栅栏居中位置焊接1000mm高的薄铁板,颜色为白 色,标志尺寸为700×700mm,标志为红色,字为黑色。 ?组合形式:自大门侧起间隔出现“中海地产”上下标准组合和售楼广告位。如在施工期间不需要设置售楼广告位,则该位置由 “中海地产”上下标准组合替代。 项目公告图牌(详见附件) ?包括:中海标志、工程概况、施工总平面图、组织架构图,各单位可根据实际情况增加防火须知、安全管理规定、文明施工管理 规定等。图牌应位于大门口处显要位置。 ?图牌规格:图牌为长方形,建议采用横式,其长宽比例为3:2,可选用钢管支撑,亦可镶嵌于墙上或悬挂于玻璃橱窗内。 ?图牌材料:平直的板材,颜色为白色。 ?图牌标准组合形象:分为单体和混合体组合两种,各单位自行选定。

建筑工程施工质量管理规定

建筑工程施工质量管理规定 “百年大计,质量第一”建筑工程质量的好坏,不仅直接影响到建筑物的安全使用,更关系到人民的生命及财产安全。建立健全各项规章制度,努力提高工程质量标准,力争为社会建造出优质的精品工程。 建筑工程质量重在过程中管理,必须以人为核心,以人为本,积极调动各方积极性与创造性,树立质量第一的观念,不断提高管理人员和作业人员的专业素质,尽量避免工作上的失误,从而提高工程质量,施工现场质量管理严格按照设计图纸施工规范要求层层落实,保证每道工序的施工质量符合验收标准,坚持做到每个分项、分部工程施工质量自检、互检、交接检,严格执行“三检”制度,不符合要求的,坚决不进行下一道工序施工,实行“质量一票否决”制。 结合大庆唐人中心商业综合体工程自身的情况定期的对分部、分项进行质量检查,定期的进行质量分析,积极分析总结出有针对性的纠正预防措施,并认真落实,使施工管理在不断解决问题的过程中提高专业水平。 为了保证工程质量,确保基础、主体工程质量达到优良等级,管理过程中实行旁站、巡视、平行检验的管理方式,保证工程质量目标顺利完成,切实做好质量防范、综合治理、经商讨制定本制度。 一、测量工程质量管理制度 1、本工程的测量必须由测量员进行对测量工程的施工管理。标高控制原始点由建设

单位提供,项目技术负责人引测报总监理工程师验证确认后,方可继续使用。 2、测量定位放线所用的经纬仪、水准仪、钢卷尺等等测量仪器及工艺控制质量检测设备在使用期内必须经过鉴定合格,在使用周期内的计量器具必须按计量标准进行计量检测控制。 3、测量基准点要得到严格保护,避免撞击、毁坏。在施工期间,要定期复核基准点是否发生位移。 4、建筑物及构筑物的总标高控制点的引测,必须采用原点闭合测量法来确定,以确保引测精度。 5、所有测量观察点的埋设必须可靠牢固,以免影响测量结果精度。 6、轴线控制点及总标高控制点,必须经监理书面认可方可使用。 7、所有测量结果,应及时汇总,并向有关部门提供验线依据,规划线的复核必须报市级以上规划部门验线确认。 8、测量误差应遵循“平均分配”的原则,轴线和楼层测量放线、标高抄测在确保其误差在允许范围内后进行平均分配,避免误差积累。 二、常用材料质量检验管理制度 1、钢筋的品种和质量、焊条、焊剂的牌号、性能以及接头中使用的钢板和型钢均必须符合设计要求和有关标准的规定。

中海地产工程规范-内墙涂料工程

内墙涂料工程规范 一、材料 1.内墙腻子 1.1内墙腻子宜选用具备强度较高、收缩性小、施工方便、易打磨、 满足环保要求的成品粉状腻子。 1.2腻子粉在运输、储存过程中应严格防雨、防潮。材料到场后, 应贮存在阴凉通风处。 1.3严禁向腻子粉中掺入水泥或其它粉料,以免出现无法硬化等质 量问题。 1.4腻子调和如需加胶,所使用的胶水应符合国家及当地现行环保 检测验收的要求。 2.内墙涂料 2.1底漆、面漆应选用相同品牌的配套产品,以免因匹配性差而影 响涂料质量。 2.2涂料贮存应阴凉通风,罐体密封严密。涂料不宜过早进场或使 用生产日期离进场时间较远的材料,如进场后贮存时间较长, 应定期倒放或横放,以免涂料结块、结皮。如涂料在储存期间 出现粘度降低且产生异味,说明涂料已经变质,应严禁使用。 3.施工工具 3.1腻子施工工具

腻子施工采用刮刀、2m铝合金直尺、水砂纸等工具。 3.2涂料施工工具 3.2.1施工工具应包括羊毛辊筒、小号(收边)羊毛辊筒、匀料板等 滚涂工具,以及小号羊毛刷和毛笔等刷涂工具。辊筒羊毛应柔 软细密,且具有一定的长度。 3.2.2涂料施工时应根据涂饰部件的不同,选择适用的工具:阴阳角、 天花石膏线条等小面积收边应采用小号(收边)羊毛辊筒,木 门框、踢脚线、开关面板等边缘收边应采用小号羊毛刷和毛笔 等刷涂工具。 二、施工工艺 1.作业条件 1.1腻子施工条件: 1.1.1户内部分: a.户内墙面、天花抹灰应全部完成。如天花采用清水混凝土,不 需抹灰时,应使用手提式打磨机将模板接缝处打磨平整,局部 凹坑部位应采用石膏腻子补平。 b.如天花采用石膏装饰线条时,应提前安装完毕。 1.1.2公共部分: a.墙、地砖铺贴工程应施工完毕。 b.过道及电梯厅天花安装完毕,需进行涂料装饰的天花石膏板及 木夹板造型应提前进行拼板补缝,并贴好防裂带,固定螺钉应 补刷防锈漆。

铁塔组立质量保证措施方案

柳树颧-南化双回π入丰南变220kV线路工程铁塔组立质量保证措施 施工单位(章) 2016年06月22日

目录 1 编制依据 (1) 2 工程概况 (1) 2.1工程参建各方 (1) 2.2工程规模 (1) 3 质量管理方针 (2) 4 质量目标 (2) 5 施工质量标准 (2) 6 质量主要措施 (2) 6.1严格管理 (3) 7 杆塔组立质量保证措施 (4) 7.1质量控制措施 (4) 7.2质量控制表 (6) 7.3检验标准 (6) 7.4.铁塔组立的质量要求 (6) 7.5.铁塔组立的质量检查方法 (7) 7.6质量通病防治措施 (9) 8 质量职责 (9) 9 施工质量考核 (10) 10 质量管理组织机构 (10)

1、编制依据 《110kV~750kV架空输电线路施工及验收规范》(GB 50233-2014) 《建筑工程施工质量评价标准》(GB/T50375-2006) 《国家电网公司基建质量管理规定》(国网(基建/2)112-2015) 施工组织设计 工程图纸 2、工程概况 2.1工程参建各方 建设单位:冀北唐山供电公司 设计单位:河北省电力勘测设计研究院 监理单位:北京华联电力工程监理公司 施工单位:湖南鸿源电力建设有限公司 质量标准:满足国家施工验收规范,优质工程标准,达标投产。 承包方式:本工程包工和部分包料,杆塔材料、导地线、绝缘子、金具、光缆及光缆金具由建设单位提供,其余材料由施工单位提供。 2.2工程规模 2.2.1本工程起于拟建丰南500kV变电站,止于柳树颧—南化线路东、西破口点,分为东、西两条破口线路,均采用同塔双回路架设,路径长度:19.907km,新建双回路铁塔60基。其中,东破口线路10.349km,线路由丰南站向南出线后,左转向东,跨过垃圾电厂的垃圾场后,再向东跨过至碱厂的110kV线路后,平行110kV线路约40米向南经柳树酄镇与西河之间,左转向南至韩家酄村西南接至线路破口点,共新建双回路铁塔33基,其中双回路直线塔22基,双回路耐张塔11基。西破口线路9.558km,其中线路由丰南站向南出线后,右转向西经杨家庄与高家庄之间,左转向南至么家庄村西北,左转经么家庄村西并平行于唐山西-柳树颧220kV线路向南,接至线路西破口点,共新建铁塔27基,其中双回路直线塔19基,双回路耐张塔8基。 2.2.2基础:全线铁塔基础采用灌注桩基础型式。 2.2.3铁塔:共有8种塔型,其中耐张塔5种,分别为2F4-SDJ、2F4-SJ1、2F4-SJ2、2F41-SJ3、2F4-SJ4;直线塔3种,分别为2F3-SZ1、2F3-SZ2、2F3-SZ3。 架线:工程全线采用2×JL/LB20A-630/45钢芯铝绞线,地线采用一根JLB40-150铝包钢

相关主题