Potential Failure Mode and Effects Analysis
(Process FMEA)FMEA Number:
Prepared By: Item: C345放大器Process Responsibility: 生产部FMEA Date (Orig.): Model Year/Vehicle(s):Current/Various Program Key Date FMEA Date (Rev.):
2、退货导致物料未及时
到位延误交期
Potential Failure Mode and Effects Analysis
(Process FMEA)
FMEA Number:Prepared By:
Item: C345放大器Process Responsibility: 生产部FMEA Date (Orig.): Model Year/Vehicle(s):Current/Various Program
Key Date
FMEA Date (Rev.):
(20.01)
要求: 按作业指导书要求依相关标准对物料的外观、相关尺寸与相关性能进行检验或测试,保证物料符合质量要求。