搜档网
当前位置:搜档网 › LEED for Non Construction Check List

LEED for Non Construction Check List

Project Name:Project Address:

Prereq 1Credit 1Credit 2Credit 3Credit 4.1Credit 4.2Credit 4.3Credit 4.4Credit 5.1Credit 5.2Credit 6.1Credit 6.2Credit 7.1Credit 7.2Credit 8

Alternative Transportation , Low-Emitting & Fuel Efficient Vehicles 111111Required

11111111

Construction Activity Pollution Prevention Site Selection

Development Density & Community Connectivity

Brownfield Redevelopment

Alternative Transportation , Public Transportation

Alternative Transportation , Bicycle Storage & Changing Rooms Alternative Transportation , Parking Capacity Site Development , Protect or Restore Habitat Site Development , Maximize Open Space Stormwater Design , Quantity Control Stormwater Design , Quality Control Heat Island Effect , Non-Roof Heat Island Effect , Roof Light Pollution Reduction

Credit 1.1Credit 1.2Credit 2Credit 3.1Credit 3.2

1

1111Water Efficient Landscaping , Reduce by 50%

Water Efficient Landscaping , No Potable Use or No Irrigation Innovative Wastewater Technologies Water Use Reduction , 20% Reduction Water Use Reduction , 30% Reduction

Prereq 1Credit 1

Credit 2

Credit 3Credit 4Credit 5Credit 6

Green Power

1

1111 to 3

1 to 10

Required Fundamental Commissioning of the Building Energy Systems Optimize Energy Performance On-Site Renewable Energy Enhanced Commissioning

Enhanced Refrigerant Management Measurement & Verification Prereq 1Required Minimum Energy Performance Prereq 1

Required

Fundamental Refrigerant Management

*Note for EAc1:

All LEED for New Construction projects registered after June 26, 2007 are required to achieve at least two (2) points.

10.5% New Buildings / 3.5% Existing Building Renovations 14% New Buildings / 7% Existing Building Renovations 17.5% New Buildings / 10.5% Existing Building Renovations 21% New Buildings / 14% Existing Building Renovations 24.5% New Buildings / 17.5% Existing Building Renovations 28% New Buildings / 21% Existing Building Renovations 31.5% New Buildings / 24.5% Existing Building Renovations 35% New Buildings / 28% Existing Building Renovations 38.5% New Buildings / 31.5% Existing Building Renovations

42% New Buildings / 35% Existing Building Renovations 123456789102.5% Renewable Energy 7.5% Renewable Energy 12.5% Renewable Energy

321Credit 2.1Credit 2.2Credit 2.3

Credit 1.1Credit 1.2Credit 1.3Credit 1.4Credit 1.5Credit 1.6Credit 1.7Credit 1.8Credit 1.9

Credit 1.10

Prereq 1 Credit 1.1 Credit 1.2 Credit 1.3 Credit 2.1 Credit 2.2 Credit 3.1 Credit 3.2 Credit 4.1 Credit 4.2 Credit 5.1 Credit 5.2 Credit 6 Credit 7Materials Reuse, 5%1

1

1

1

1

1

Required

1

1

1

1

1

1

1 Storage & Collection of Recyclables

Building Reuse, Maintain 75% of Existing Walls, Floors & Roof

Building Reuse, Maintain 95% of Existing Walls, Floors & Roof

Building Reuse, Maintain 50% of Interior Non-Structural Elements

Construction Waste Management, Divert 50% from Disposal

Construction Waste Management, Divert 75% from Disposal

Materials Reuse, 10%

Recycled Content, 10% (post-consumer + 1/2 pre-consumer)

Recycled Content, 20% (post-consumer + 1/2 pre-consumer)

Regional Materials, 10% Extracted, Processed & Manufactured

Regional Materials, 20% Extracted, Processed & Manufactured

Rapidly Renewable Materials

Certified Wood

Prereq 1

Credit 1 Credit 2 Credit 3.1 Credit 3.2 Credit 4.1 Credit 4.2 Credit 4.3 Credit 4.4 Credit 5 Credit 6.1 Credit 6.2 Credit 7.1 Credit 7.2 Credit 8.1Low-Emitting Materials, Paints & Coatings1

1

1

1

1

1

Required

1

1

1

1

1

1

1

1 Minimum IAQ Performance

Outdoor Air Delivery Monitoring

Increased Ventilation

Construction IAQ Management Plan, During Construction

Construction IAQ Management Plan, Before Occupancy

Low-Emitting Materials, Adhesives & Sealants

Low-Emitting Materials, Carpet Systems

Low-Emitting Materials, Composite Wood & Agrifiber Products

Indoor Chemical & Pollutant Source Control

Controllability of Systems, Lighting

Controllability of Systems, Thermal Comfort

Thermal Comfort, Design

Thermal Comfort, Verification

Daylight & Views, Daylight 75% of Spaces

Prereq 2Required Environmental Tobacco Smoke (ETS) Control

Credit 8.21 Daylight & Views, Views for 90% of Spaces

Credit 1.1Credit 1.2Credit 1.3Credit 1.4Credit 2

1

1111LEED? Accredited Professional

Innovation in Design:Innovation in Design:Innovation in Design:Innovation in Design:

相关主题