Building construction quality management

Abstract:adhere to the quality first, improve the management level, improve the quality of construction is the key, only to meet the required quality standards and user requirements under the premise of quality, time limit for a project, cost, to meet the requirements, to provide more high-quality, safe, economical and applicable building products. Based on this, the building construction quality management of.

Key words: housing construction building construction quality management

1 strengthen training, selection of construction personnel is laying the quality control personnel foundation

Engineering quality were all participants in the project construction technology management, operating personnel coordination work results, so construction workers is to form the main factor of project quality. To control the engineering quality first is the training and selection of construction personnel, improving their comprehensive quality. We should improve their quality awareness, according to comprehensive quality regardless of idea construction personnel must establish five concepts: the concept of quality first, pre-control priority idea, talk with data concept and social benefit and enterprise benefit and comprehensive benefit idea. The second is the construction of the technical quality of personnel, management, construction personnel should have higher quality planning and management capacity, production personnel should have superb technical ability, be strict in one's demands of the style of work, strict implementation of quality standards and procedures of the legal concept, service personnel should do good technology and service life, can be with excellent service indirectly to ensure engineering quality.

2 give full play to QC quality control function

According to "the anti-seizure combination, prevention first " principle is carried out actively " tell, help, anti, card" scientific examination method, and the construction

personnel together, common to the owners of construction process, responsible, quality control personnel, users, the construction personnel to establish new relations of cooperation, quality inspection staff and the construction site operations personnel is consistent, it is to provide users with high quality, satisfaction of building products. But the construction production is busy, to snatch the project schedule is loosen quality management tendency occurs. This led to check the quality of the project is checked with contradictions between. To give full play to the initiative of the staff to check the quality of the project, it is necessary to establish the authority of the quality inspection personnel, it is very necessary and important.

3 following a case analysis gradually quality management, engineering survey:

The territory of Hechi a building for the underground layer, on the ground twenty-two, twenty-five buildings, covers an area of 2550.4 square meters, building a total height of 79.950 meters, construction area of 4008 square meters underground, on the ground 36855 square meters, balcony area is 1570.1 square meters; the main design reasonable service life is 50 years; building fire grade two, seismic fortification intensity is 7 degrees, frame aseismic grade two; the ground floor to the ground floor three layer 2-A axis 2-6 axis and

2-17 axis short limb shear wall seismic rating for a class, the rest of shear wall seismic grade two. The project uses the base form of prestressed high-strength concrete pipe pile, structure type for the cast-in-place reinforced concrete frame shear wall structure.

4 construction management

On the construction quality management, mainly involves three aspects, one is about the design, survey and document review management. On design, reconnaissance unit quality behavior and results of the activities of the supervision, the emphasis is placed on the design, survey and document review supervisory control. If the violation of the relevant laws, regulations and mandatory standards for the design and survey documents, can be through direct economic penalties and legal sanctions, enabling direct responsibility assumed by the error caused by negligence or intentional quality responsibility. Two of the activities of the bidding management, focuses on the construction bidding supervision, market supervision and quality supervision the effective integration, through the quality supervision to promote the market competition and standardization of the benign operation, effectively through market operation, to ensure the validity of quality supervision. Three is

the text of the contract supervision, is the focus of construction contract supervision, quality management standardization and legalization to fulfil the terms of the contract, the legal effect of contract binding the construction quality and results. By analyzing the three aspects of examination and supervision, to achieve the government's construction quality

of the implementation process control and supervision. Before the construction, in the final analysis is the emphasis of quality management for owners of quality behavior management, because the owner of all these activities of the organizers, decision makers, which is the standard construction owner quality behavior and results of the activities of the important measures.

5 construction management

5.1 Lraw materials quality control

Material quality engineering construction quality is the key, use of raw materials does not meet the requirements of engineering, engineering quality can not meet the requirements. Therefore, in the construction quality control of stop before construction on material quality control, to ensure the quality of materials, in order to improve construction quality. For the control of materials, first of all to the common material supply necessary audit, select qualified suppliers for the supply of materials. Secondly, to approach the necessary inspection of raw materials, including: quality inspection report of the inspection, the inspection of appearance, physical and chemical inspection inspection. Through a series of tests to ensure the quality of the raw materials entering.

5.2 procedures and time limit control

To implement the handover inspection system, on the procedures of unqualified shall enter into next working procedure construction. At the same time construction quality affected by seasons, the reasonable arrangement of construction schedule is to ensure the engineering quality are important measures, and blindly rush period will inevitably lead to serious consequences. Quality control step is to establish quality control, selected key and key technology to undertake the key is checked, the two is to strengthen the operation of the management, project quality is good or bad, depends to some extent on the construction of personnel operation level.

5.3 increase on-site inspections

Quality management in the construction site should strive to grasp first-hand information, and strive to achieve the timely control, for the occurrence of the problem

must accomplish early discovery, early correction of bad old practices die hard, avoid, avoid large loss. For example, in the masonry tie bar examination, if taken after the completion of a masonry opening examination, is not easy to check, and to identify the problems are also difficult to remedy, but in the on-site inspection in a timely manner to solve, can avoid bigger loss, but also easy to get the cooperation.

The entity quality inspection methods should adopt scientific monitoring instruments and equipment, to provide accurate, reliable and convincing data, strengthen the government engineering quality supervision and inspection of scientific and authoritative. Through the supervision, to ensure the implementation of mandatory standards, ensure the construction of law, regulations and standard carry out, from macroscopical overall grasp the construction project quality and structure safety. In addition, in strengthening program management at the same time, we must strengthen the technical control. Technology control method using standard evaluation method is better. Evaluation of standard methods are mainly as follows: one is the on site quality assurance condition examination and evaluation, two is the completion of the project the detection results of the examination and evaluation, three is on site quality assurance data examination and evaluation, four of engineering entity size deviation of the measured, five is for the completion of engineering the macro visual inspection evaluation.

5.4 after the completion of the management

After the completion of the quality management of construction projects is put into use check management. First of all to ensure that do not meet the quality standards of the project can not be put into use, avoid inferior project to the state and public users cause direct harm and influence. The second is the decoration, repair and maintenance of quality supervision in construction project whole life quality management category : one is to eliminate or reduce due to renovation, maintenance process caused by irregularities on the construction engineering foundation, body structure and environmental quality, damage, cause quality accident. Two is prevented due to repair, maintenance quality is not up to the requirements to the state and public users production and living environment caused by direct damage. At this stage of the supervision should be emphasized good two close: it is strictly for its completion and acceptance review, supervision, to ensure that the registration of the reliability, authority and effectiveness. Two is to enhance the decoration, maintenance of quality management in the process, so that construction project whole life

quality objectives are effective implementation, for users to create a safe, comfortable, healthy production, living environment, so that the construction quality and realizing the sustainable development. Advocating and implementing project quality insurance, the project quality management into economic management category, to solve engineering after the delivery of quality problem tenants to find the responsible party for any menace from the "rear".

This phase is the project by construction to use or production of mark; is on engineering quality inspection the necessary link; is the guarantee contract task is finished in the round, improve project quality level of final checks. The unit after the completion of the project, must undertake the final inspection and test. Unit engineering technical person in charge should be prepared for the demands of information collected materials, equipment, component quality certificate of materials, a variety of material test data, record of concealed work, construction records records. By the technical director of project organization project technology, quality, production and other relevant professional and technical personnel to the scene inspection and evaluation. To identify the construction quality defects should be corrected, and should be corrected once again after the verification to demonstrate conformity. To ensure engineering quality accord with mandatory standard design documents and the requirements of the contract, the employer, the Ministry of supervision of the project completion report. Attended by the construction unit of the organization of the main parties involved in the completion of initial inspection, acceptance procedure.

ending

Project, quality, the quality of housing construction related to people's daily life and the safety of life and property. In recent years, the housing quality problems have already become the focus of public attention, annual 3.15 consumer rights day, China Consumers Association published by consumer complaints the largest of the ten major categories of commodities, the housing quality problems at the front. Therefore, construction management in many aspects, quality management is the key and core. Only do a good job in building engineering construction quality planning and housing construction quality control, to create more quality engineering.

Reference.

[1 ] Building Engineering ( Construction Management ) [ J]. Journal of Taizhou Polytechnic College.

[2 ] Wang Yan. Paying attention to construction management" two pieces of skins" phenomenon [J ]. Management of construction enterprises.

[3 ] Lin Yihong, Li Yuanying. To improve construction quality several ponders [J ]. Shanxi building, 2005, 31 ( 1): 127-128.

[4 ] Bu Narui, Wang Liwen, Li Wanqin. Discussion on construction management [ J]. Journal of Hebei Institute of Architecture and Civil Engineering, 2002, ( 02).

Hu Zhenghua

[ 5]. The era of knowledge economy the construction management [J ]. Parathion design and powder engineering, 2005, ( 06).

[ 6].Zheng Jingqiu.Infuluencing the contrcution qulity of Engineering five fsctors[J ]. Shanxi building.2005,31( 1):135-136.

浅谈房屋建筑施工中的质量管理

摘要:坚持质量第一、提高管理水平,是提高建筑工程质量关键之所在,只有在符合规定的质量标准和用户要求的前提下,满足质量、工期、成本等要求,才能为社会提供更多的优质、安全、经济适用的建筑产品。本文基于此,对房屋建筑施工中的质量管理进行了相关探讨。

关键词:房屋建筑建筑施工质量管理

1 强化培训、优选施工人员是奠定质量控制的人才基础

工程质量是所有参加工程项目施工的技术管理干部、操作人员协调工作的结果,所以施工人员是形成工程质量的主要因素。要控制工程质量首先是培训和优选施工人员,提高他们的综合素质。首先应提高他们的质量意识,按照全面质量不管的观念施工人员必须树立五大观念:质量第一的观念、预控为主的观念、用数据说话的观念以及社会效益与企业效益并重的综合效益观念。其次是施工人员的技术素质,管理干部、施工人员都应具有较高的进行质量规划和目标管理的能力,生产人员则应具有精湛的技术能力,一丝不苟的工作作风,严格执行质量标准和操作规程的法制观念,服务人员则应做好技术和生活服务,能以出色的服务间接地保证工程质量。

2 充分发挥质检人员质量检查控制作用

按照“防检结合,预防为主”的原则积极推行“讲、帮、防、卡”的科学检查方法,与施工人员一道,共同对业主,对下道施工工序负责,质检人员、用户、施工人员要建立新型的合作关系,质量检查人员和施工现场作业人员目标是一致的,都是为向用户提供高质量,满意的建筑产品。但施工生产较忙的时候,为抢工程进度就放松质量管理的倾向时有发生。这导致了工程质量检查与被检查之间产生矛盾。要充分发挥工程质量检查人员的积极性,就要树立质量检查人员的权威性,这是十分必要和重要的。

3 以一案例逐步剖析质量管理,工程概况

河池境内某大厦工程为地下一层、地上二十二、二十五层建筑,占地面积为2550.4平方米,建筑总高度为79.950米,建筑面积为地下4008平方米,地上36855平

方米,阳台面积为1570.1平方米;设计主体合理使用年限为50年;建筑耐火等级二级,抗震设防烈度为7度,框架抗震等级二级;地下一层至地上三层2-A轴交2-6轴及2-17轴上的短肢剪力墙抗震等级为一级,其余剪力墙抗震等级为二级。该工程采用基础形式为预应力高强混凝土管桩,结构类型为现浇钢筋砼框架-剪力墙结构。

4 施工前的管理

对施工前的质量管理,主要涉及三个方面,一是对有关设计、勘察文件审查的管理。对设计、勘察单位的质量行为和活动结果的监督,重点是放在对设计、勘察文件的审查监督把关上。一旦发现其违犯有关法律、法规和强制性标准的设计和勘察文件,可以通过直接的经济处罚和法律制裁,使直接责任主体承担由其失误疏忽或有意所造成的质量责任。二是对招投标活动的管理,重点是施工招投标的监督,实现市场监督与质量监督的有效结合,通过质量监督审查促进市场竞争的规范化和良性运转,通过市场有效运作,保证质量监督的有效性。三是对合同文本的监督,重点是施工合同的监督,把质量管理的规范化和法制化落实到合同条款中,以合同的法律效力约束各建设主体的质量行为和活动结果。通过对这三方面的内容的审查监督,实现政府对建设工程质量实施过程的预控监督。施工前质量管理的重点归根到底是对业主质量行为的管理,因为业主是所有这些活动的组织者、决策者,这也是规范建设业主质量行为和活动结果的重要措施。

5 施工中的管理

5.1 原材料质量控制

材料质量是工程施工质量的关键,工程使用原材料不符合规定,工程质量不可能符合要求。因此,在工程施工质量控制中不许再施工前对材料进行质量控制,保证材料质量,以此提高工程施工质量。对于材料的控制,首先要对材料供应常见进行必要的审核,选择具有资质的供应厂家进行材料的供应。其次,要对进场原料进行必要的检验,包括:质量检验报告单的检查、外观的检查、理化检验的检查等等。通过一系列的检验来保证进场原料的质量。

5.2 工序与工期控制

要落实交接检制度,上道工序不合格不得进入下一道工序施工。同时建筑工程质量受季节影响,合理安排施工进度是保证工程质量的重要措施,而盲目抢工期必然造成严重后果。实现质量控制步骤一是设立质量控制点,选定关键环节和重点工艺进行重点检查,二是强化对操作人员的管理,工程质量的好与坏,在一定程度上取决于施工人员的操作水平的高低。

5.3加大现场巡查力度

毕业论文英文参考文献与译文

Inventory management Inventory Control On the so-called "inventory control", many people will interpret it as a "storage management", which is actually a big distortion. The traditional narrow view, mainly for warehouse inventory control of materials for inventory, data processing, storage, distribution, etc., through the implementation of anti-corrosion, temperature and humidity control means, to make the custody of the physical inventory to maintain optimum purposes. This is just a form of inventory control, or can be defined as the physical inventory control. How, then, from a broad perspective to understand inventory control? Inventory control should be related to the company's financial and operational objectives, in particular operating cash flow by optimizing the entire demand and supply chain management processes (DSCM), a reasonable set of ERP control strategy, and supported by appropriate information processing tools, tools to achieved in ensuring the timely delivery of the premise, as far as possible to reduce inventory levels, reducing inventory and obsolescence, the risk of devaluation. In this sense, the physical inventory control to achieve financial goals is just a means to control the entire inventory or just a necessary part; from the perspective of organizational functions, physical inventory control, warehouse management is mainly the responsibility of The broad inventory control is the demand and supply chain management, and the whole company's responsibility. Why until now many people's understanding of inventory control, limited physical inventory control? The following two reasons can not be ignored: First, our enterprises do not attach importance to inventory control. Especially those who benefit relatively good business, as long as there is money on the few people to consider the problem of inventory turnover. Inventory control is simply interpreted as warehouse management, unless the time to spend money, it may have been to see the inventory problem, and see the results are often very simple procurement to buy more, or did not do warehouse departments . Second, ERP misleading. Invoicing software is simple audacity to call it ERP, companies on their so-called ERP can reduce the number of inventory, inventory control, seems to rely on their small software can get. Even as SAP, BAAN ERP world, the field of

概率论毕业论文外文翻译

Statistical hypothesis testing Adriana Albu,Loredana Ungureanu Politehnica University Timisoara,adrianaa@aut.utt.ro Politehnica University Timisoara,loredanau@aut.utt.ro Abstract In this article,we present a Bayesian statistical hypothesis testing inspection, testing theory and the process Mentioned hypothesis testing in the real world and the importance of, and successful test of the Notes. Key words Bayesian hypothesis testing; Bayesian inference;Test of significance Introduction A statistical hypothesis test is a method of making decisions using data, whether from a controlled experiment or an observational study (not controlled). In statistics, a result is called statistically significant if it is unlikely to have occurred by chance alone, according to a pre-determined threshold probability, the significance level. The phrase "test of significance" was coined by Ronald Fisher: "Critical tests of this kind may be called tests of significance, and when such tests are available we may discover whether a second sample is or is not significantly different from the first."[1] Hypothesis testing is sometimes called confirmatory data analysis, in contrast to exploratory data analysis. In frequency probability,these decisions are almost always made using null-hypothesis tests. These are tests that answer the question Assuming that the null hypothesis is true, what is the probability of observing a value for the test statistic that is at [] least as extreme as the value that was actually observed?) 2 More formally, they represent answers to the question, posed before undertaking an experiment,of what outcomes of the experiment would lead to rejection of the null hypothesis for a pre-specified probability of an incorrect rejection. One use of hypothesis testing is deciding whether experimental results contain enough information to cast doubt on conventional wisdom. Statistical hypothesis testing is a key technique of frequentist statistical inference. The Bayesian approach to hypothesis testing is to base rejection of the hypothesis on the posterior probability.[3][4]Other approaches to reaching a decision based on data are available via decision theory and optimal decisions. The critical region of a hypothesis test is the set of all outcomes which cause the null hypothesis to be rejected in favor of the alternative hypothesis. The critical region is usually denoted by the letter C. One-sample tests are appropriate when a sample is being compared to the population from a hypothesis. The population characteristics are known from theory or are calculated from the population.

旅游服务贸易外文翻译文献

旅游服务贸易外文翻译文献(文档含英文原文和中文翻译)

旅游服务贸易的国际竞争力:罗马尼亚的案例 引言 旅游业是唯一的可以为任何发展水平的国家提供贸易机会的服务活动。然而,它也是一个很大程度因为国家的能力和在全球经济中的表现而又有明确的利益分配不均行业,而这又需要提高自己的竞争力。 自20世纪90年代初,罗马尼亚旅游业经历了出口量,生长速率和结构的重大变化。这些不同的波动都影响了罗马尼亚在国际旅游市场上相对的竞争地位并引起了其旅游贸易平衡的变化。同时,新的和更多的错杂的欧式建筑,引起了罗马尼亚的区域旅游竞争力的显著变化。 在此背景下,本文试图提出一个框架,以竞争力和旅游贸易表现之间的关系为重点,来评估罗马尼亚的旅游服务贸易的国际竞争力。 一、国际竞争力视角:国际竞争力之与国际旅游业的相关性 国际竞争力的概念,尽管有争议,难以捉摸,但现在已经得到认可,并继续吸引世界各地的学者和决策者的关注。 到目前为止,为提高国际竞争力已采取措施,都被认为是在经济层面进行的(加瑞利,2003)通常是指一个国家生产的商品和服务,以满足国际市场的考验,并同时保持和增加公民的收入的能力(欧洲委员会,2007)。 由于竞争力最终取决于一国企业在国内和国际的市场成功,所以对竞争力的注意力都集中在企业层面的竞争力上(波特,1990),对于此的普遍理解是指“……该公司保持,并更好的是,扩大其全球市场份额,增加和扩大利润的能力” (克拉克和盖,1998, 经济合作与发展组织,1993)。 因此,虽然广泛流传但是国际竞争力作为与国家经济和其国际贸易相关

的理论基础已经不太在学术文献进行分析。因此,一个国家国际竞争力的性质,效益和局限性仍然含糊不清(科尔德威尔,2000,克鲁格曼,1994, 1996)。 国际竞争力,是指一个国家在货物和服务贸易方面巩固和保持贸易优势相对于世界其他地区的贸易优势。 每当一个国家的经济福利通过贸易流量的增加,或通过从初始平衡状态的贸易条件的改变而增加,他的国际竞争力都会得到提高(科尔德威尔,2000)。 贸易理论表示,经济福利依赖于一个国家有比较优势的货物和服务的生产。这实际上意味着当生产符合一国的比较优势的情况时国际竞争力能得到保障。如果一国能在国际上表现良好并在出口市场竞争成功,这可能就是他们健全的国际竞争力的标志。 因此,在国际上,竞争力定义为一个经济体能够吸引其出口需求和投资供给需求的能力和在所有社会规范内提升公民生活水平的能力。这反过来又取决于宏观和微观经济政策,影响生产的经济生产率要素和经营成本的法规和制度。 一个可用的文献回顾和实证证据支持国际竞争力可以解释为在一定程度上,一个国家的出口能力这一观点(道乐和沃尔夫,1993, 格博格等. 2004)。还有就是,事实上,是出口表现和国际竞争力之间的循环关系。出口是国际竞争力的第一衡量指标。出口情况的改善会导致了一个国家的竞争力提升。这种效果是一个企业的技能,知识,创新和运用新技术并能够在一个成功的商业方式中利用技术机会等的结果。 另一方面,为了在竞争激烈的全球市场努力成功实现出口,一个国家被迫提高竞争力。更具竞争力的国家,它的经济更强大。因此,它更有能力在全球市场竞争,以吸引具有较高的知识,技能,水平人们去购买新技术等,

工程成本预算 毕业论文外文文献翻译

外文翻译 Construction projects, private and public alike, have a long history of cost escalation. Transportation projects, which typically have long lead times between planning and construction, are historically underestimated, as shown through a review of the cost growth experienced with the Holland Tunnel. Approximately 50% of the active large transportation projects in the United States have overrun their initial budgets. A large number of studies and research projects have identified individual factors that lead to increased project cost. Although the factors identified can influence privately funded projects the effects are particularly detrimental to publicly funded projects. The public funds available for a pool of projects are limited and there is a backlog of critical infrastructure needs. Therefore, if any project exceeds its budget other projects are dropped from the program or the scope is reduced to provide the funds necessary to cover the cost growth. Such actions exacerbate the deterioration of a state’s transportation infrastructure. This study is an anthology and categorization of individual cost increase factors that were identified through an in-depth literature review. This categorization of 18 primary factors which impact the cost of all types of construction projects was verified by interviews with over 20 state highway agencies. These factors represent documented causes behind cost escalation problems. Engineers who address these escalation factors when assessing future project cost and who seek to mitigate the influence of these factors can improve the accuracy of their cost estimates and program budgets Historically large construction projects have been plagued by cost and schedule overruns Flyvbjerg et al. 2002. In too many cases, the final project cost has been higher than the cost estimates prepared and released during initial planning, preliminary engineering, final design, or even at the start of construction “Mega projects need more study up front to avoid cost overruns.” The ramifica tions of differences between early project cost estimates and bid prices or the final cost of a project can be significant. Over the time span between project initiation concept development and the completion of construction many factors may influence the final project costs. This time span is normally several years in duration but for the highly

酒店服务质量管理外文文献翻译

文献出处:Borkar S, Koranne S. Study of Service Quality Management in Hotel Industry [J]. Pacific Business Review International, 2014, 6(9): 21-25. 原文 Study of Service Quality Management in Hotel Industry Borkar; Sameer Abstract It is an attempt to understand the role of quality improvement process in hospitality industry and effectiveness in making it sustainable business enterprise. It is a survey of the presently adopted quality management tools which are making the hotels operations better focused and reliable and meet the customer expectations. Descriptive research design is used to know the parameters of service quality management in hospitality industry. Exploratory research design is undertaken to dig out the service quality management practices and its effectiveness. Data analysis is done and presented; hypothesis is tested against the collected data. Since the industry continuously tries to improve upon their services to meet the levels of customer satisfaction; Study presents tools for continuous improvement process and how it benefits all the stake holders. It can be inferred from the study that the hotel implement continuous improvement process and quality management tools to remain competitive in the market. The study involves hotels of highly competitive market with limited number of respondents. This limits the study to hotel industry and has scope of including other hospitality service providers as well. Keywords:Customer Satisfaction, Perception, Performance Measurement, Continuous, Improvement Process. Introduction It has brought paradigm shifts in the operations of hospitality industry. The overall perspective of the industry is changed due to introduction of new techniques

毕业论文外文翻译模版

吉林化工学院理学院 毕业论文外文翻译English Title(Times New Roman ,三号) 学生学号:08810219 学生姓名:袁庚文 专业班级:信息与计算科学0802 指导教师:赵瑛 职称副教授 起止日期:2012.2.27~2012.3.14 吉林化工学院 Jilin Institute of Chemical Technology

1 外文翻译的基本内容 应选择与本课题密切相关的外文文献(学术期刊网上的),译成中文,与原文装订在一起并独立成册。在毕业答辩前,同论文一起上交。译文字数不应少于3000个汉字。 2 书写规范 2.1 外文翻译的正文格式 正文版心设置为:上边距:3.5厘米,下边距:2.5厘米,左边距:3.5厘米,右边距:2厘米,页眉:2.5厘米,页脚:2厘米。 中文部分正文选用模板中的样式所定义的“正文”,每段落首行缩进2字;或者手动设置成每段落首行缩进2字,字体:宋体,字号:小四,行距:多倍行距1.3,间距:前段、后段均为0行。 这部分工作模板中已经自动设置为缺省值。 2.2标题格式 特别注意:各级标题的具体形式可参照外文原文确定。 1.第一级标题(如:第1章绪论)选用模板中的样式所定义的“标题1”,居左;或者手动设置成字体:黑体,居左,字号:三号,1.5倍行距,段后11磅,段前为11磅。 2.第二级标题(如:1.2 摘要与关键词)选用模板中的样式所定义的“标题2”,居左;或者手动设置成字体:黑体,居左,字号:四号,1.5倍行距,段后为0,段前0.5行。 3.第三级标题(如:1.2.1 摘要)选用模板中的样式所定义的“标题3”,居左;或者手动设置成字体:黑体,居左,字号:小四,1.5倍行距,段后为0,段前0.5行。 标题和后面文字之间空一格(半角)。 3 图表及公式等的格式说明 图表、公式、参考文献等的格式详见《吉林化工学院本科学生毕业设计说明书(论文)撰写规范及标准模版》中相关的说明。

毕业论文外文翻译模板

农村社会养老保险的现状、问题与对策研究社会保障对国家安定和经济发展具有重要作用,“城乡二元经济”现象日益凸现,农村社会保障问题客观上成为社会保障体系中极为重要的部分。建立和完善农村社会保障制度关系到农村乃至整个社会的经济发展,并且对我国和谐社会的构建至关重要。我国农村社会保障制度尚不完善,因此有必要加强对农村独立社会保障制度的构建,尤其对农村养老制度的改革,建立健全我国社会保障体系。从户籍制度上看,我国居民养老问题可分为城市居民养老和农村居民养老两部分。对于城市居民我国政府已有比较充足的政策与资金投人,使他们在物质和精神方面都能得到较好地照顾,基本实现了社会化养老。而农村居民的养老问题却日益突出,成为摆在我国政府面前的一个紧迫而又棘手的问题。 一、我国农村社会养老保险的现状 关于农村养老,许多地区还没有建立农村社会养老体系,已建立的地区也存在很多缺陷,运行中出现了很多问题,所以完善农村社会养老保险体系的必要性与紧迫性日益体现出来。 (一)人口老龄化加快 随着城市化步伐的加快和农村劳动力的输出,越来越多的农村青壮年人口进入城市,年龄结构出现“两头大,中间小”的局面。中国农村进入老龄社会的步伐日渐加快。第五次人口普查显示:中国65岁以上的人中农村为5938万,占老龄总人口的67.4%.在这种严峻的现实面前,农村社会养老保险的徘徊显得极其不协调。 (二)农村社会养老保险覆盖面太小 中国拥有世界上数量最多的老年人口,且大多在农村。据统计,未纳入社会保障的农村人口还很多,截止2000年底,全国7400多万农村居民参加了保险,占全部农村居民的11.18%,占成年农村居民的11.59%.另外,据国家统计局统计,我国进城务工者已从改革开放之初的不到200万人增加到2003年的1.14亿人。而基本方案中没有体现出对留在农村的农民和进城务工的农民给予区别对待。进城务工的农民既没被纳入到农村养老保险体系中,也没被纳入到城市养老保险体系中,处于法律保护的空白地带。所以很有必要考虑这个特殊群体的养老保险问题。

中国服务贸易的国际竞争力探析——文献综述

中国服务贸易的国际竞争力探析 ——文献综述 随着世界经济进入服务经济时代,以产品为基础的竞争向以服务为基础的竞争转变,服务业在维护一国经济和政治利益方面处于重要的战略地位。据WTO发布的数据显示,全球服务贸易总体发展的趋势在不断加强,1980年到2007年间,世界服务贸易出口额从3650亿美元扩大到33000亿美元,27年间增长了8倍,占世界贸易出口的比重从1/7增长到近1/3。在2010年,世界服务贸易达到了36595亿美元,占当年世界贸易总额的1/3。由此可见,服务贸易势必成为全球经济发展的重要组成部分。 服务贸易在全球贸易比重不断增加,世界各国都从国际服务贸易中受益颇丰,此时,对我国服务贸易的竞争力进行研究,分析我国服务贸易发展不足的原因,发掘我国服务贸易的潜在优势以及探究提升我国服务贸易竞争力的策略便具有非常重要的意义。 1.服务贸易及其国际竞争力的定义 《服务贸易总协定》(General Agreements on Trade in Service,GATS,1994年4月15日),其中对服务贸易做出了明确的定义:第一,跨境提供(cross-border supply),即从缔约方境内向任何其他缔约方境内提供服务,这种服务无需人员、物资和资金流动,而是通过现代通讯、邮电、计算机网络实现的视听、金融、信息等服务;第二,境外消费(consumption abroad),即缔约方境内任何向其他缔约方消费者提供服务,如接待外国游客、提供旅游服务,为国外病人提供医疗服务,接受外国留学生等;第三,商业存在(commercial

Presence),即一缔约方在其他任何缔约方境内通过提供服务的商业存在而提供服务,如外国公司在中国开办银行、商店,设立会计、律师事务所等;第四,自然人流动(movement of natural persons),即一缔约方的自然人在其他任何缔约方境内提供服务,如一国的医生、教授、艺术家到另一国从事个体服务。 服务贸易国际竞争力是指一个国家或地区在经济全球化趋势下,以提高国民收入和生活水平为目的,服务业参与国际市场竞争,创造增加值并保持良好的国际收支平衡的能力。在此,不仅强调出口能力,更重要的是保持国际收支的平衡。 2.国外学者相关研究 2.1对于国际服务贸易竞争力理论方面的研究 迈克尔·波特(Michael E·Porter),1990年提出了国家竞争优势理论,将竞争力与产业结合起来进行研究。在《国家竞争优势》一书中,他提出了著名的“产业国际竞争力国家钻石模型”,用一个形似钻石的菱形图表示出国家竞争力的四大要素(生产要素;需求条件;相关与支持性产业企业战略、结构、同业竞争)和两个辅助因素(机会和政府)。后来,有人将这一理论引入国际服务贸易领域,发现该理论不仅能较为全面和系统地对服务贸易格局进行解释与总结,而且对一国服务贸易的未来发展有一定的前瞻性和预见性,因此能更好地适应国际服务贸易的发展要求。 对于国际贸易比较优势方面,联合国贸发会国际贸易高级专家Murry Gibbs和Michiko Hayashi作了一个较为全面的总结,认为自然资源要素禀赋固然是决定一国服务贸易比较优势的一个方面,但一国服务贸易的比较优势还要取决于该国的经济发展水平和发展类型,以

工程管理专业研究建设项目的工程造价大学毕业论文外文文献翻译及原文

毕业设计(论文) 外文文献翻译 文献、资料中文题目:研究建设项目的工程造价 文献、资料英文题目: 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

科技文献翻译 题目:研究建设项目的工程造价 研究建设项目的工程造价 摘要 在工程建设中,中国是拥有世界最大投资金额和具有最多建设项目的国家。它是一 项在建设项目管理上可以为广泛的工程管理人员进行有效的工程造价管理,并合理 确定和保证施工质量和工期的条件控制施工成本的重要课题。 在失去了中国建筑的投资和技术经济工程,分离的控制现状的基础上,通过建设成 本控制的基本理论为指导,探讨控制方法和施工成本的应用,阐述了存在的问题在 施工成本控制和对决心和施工成本的控制这些问题的影响,提出了建设成本控制应 体现在施工前期,整个施工过程中的成本控制,然后介绍了一些程序和应用价值工 程造价的方法在控制建设项目的所有阶段。 关键词:建设成本,成本控制,项目 1.研究的意义 在中国,现有的工程造价管理体系是20世纪50年代制定的,并在1980s.Traditional 施工成本管理方法改进是根据国家统一的配额,从原苏联引进的一种方法。它的特 点是建设成本的计划经济的管理方法,这决定了它无法适应当前市场经济的要求。 在中国传统建筑成本管理方法主要包括两个方面,即建设成本和施工成本控制方法 的测定方法。工程造价的确定传统的主要做法生搬硬套国家或地方统一的配额数量 来确定一个建设项目的成本。虽然这种方法已经历了20多年的改革,到现在为止,计划经济管理模式的影响仍然有已经存在在许多地区。我们传统的工程造价控制的

供应商质量管理文献翻译(外文翻译-中英对照)

互利共赢的供应商质量控制 前言 近年来,随着对供应链的重视,供应商管理正逐渐成为企业和学术界的关注对象,IS09000族标准以及QS 9000标准都对供应商的管理提出了相应的要求,与供应商管理有关的研究成果正逐渐增多,一些软件巨头也推出了供应商关系管理的软件,但是在这些研究成果和应用软件中,涉及到的供应商质量控制的内容只是一些最基本的要求,而供应商质量控制恰恰是供应商管理的最基本、最重要的内容。另一方而,质量管理界对质量控制的研究取得了大量的成果,遗憾的是这些成果大多依然局限于企业的内部控制,仅仅研究从企业内部各环节如何改善产品的质量,而基于供应链的角度来研究质量控制的成果尚不多见。因此,系统地研究经济全球化形势下供应商质量控制的理论与方法,将有助于推动我国企业产品质量的快速提高和供应链竞争优势的形成与巩固。 1、质量与企业共存 质量一直是一个随着时代的变化而不断变化的概念,人们对质量的认识也往往因关注点不同而有所不同。如,早在1908年,通用汽车公司的工程师们在皇家汽车俱乐部会员们的面前拆解了3辆凯迪拉克轿车,并把这些零件混在一起,而后从中选择零件重新组装成车,然后驾车绝尘而去。这令在场的会员极为震惊,认为凯迪拉克车质量之高令人惊叹。显然在当时,汽车零件具有互换性是一种了不起的质量特性,这也是福特公司的N型车和T型车取得辉煌成功的重要原因.时至今日,即使农用三轮车的零部件也具有极高的互换性,零部件的标准化和互换性已经是理所当然的事情,不再是吸引顾客的重要质量特性.可见质量的内涵是不断变化的.那么究竟什么是质量呢? (1)市场竟争就是企业间对“顾客”的争夺,在日益激烈的“顾客"争夺战中,质量、价格、交付(交付日期、方式和手段)和服务是企业常用的四个法宝,其中质量是根本,离开质量其他三项将变得毫无意义,因此可以说质量己成为市场竞争的焦点.它反映了产品是否能够反映顾客需求、能否满足顾客需求,从面决定了产品的市场前途。有鉴于此,质量己成为一项全球性运动,世界上所有优秀企业无一不把质量作为企业战略的关键内容,从战略的角度来规划质量。 (2)对于企业经营者来说,认识到质量对企业的重要意义只是经营企业的第一步,重要的是如何利用科学的方法来保证产品和服务的质量,使顾客满意,来保证过程和工作的质量来获互利共炭的供应商质量控制得良好的业绩。 众所周知,企业管理是社会生产力发展到一定程度的历史产物,质量管理作为企业管理的组成部分,同样也是社会发展的客观要求,特别是顾客处于主导地位的今天,要使顾客满意,就必须有过硬的产品质量和服务质量,这就要求企业积极推行先进的质量管理理论与方法,不断进行质量管理创新. 2、企业与供应商质量控制 随着生产社会化的不断发展,企业的生产活动分工越来越细,专业化程度越来越强,促使生产技术水平越来越高,产品质量得到大幅度改善。通常,某一产品不可能由一个企业从最初的原材料开始加工直至形成顾客最终使用的产品,往往是通过多个企业分工协作来完成.另外,先进生产方式的广泛应用,如准时生产、敏捷制造、零库存等,使企业与供应商的关系愈加紧密,企业与供应商的关系也由单纯的买卖关系向互利共底的合作关系演变。 ISO 9000族标准自1987年诞生以来受到了世界各国的一致追捧,全球约50多万家企业通过ISO9001质量管理体系认证足以说明这套管理标准在引领国际管理潮流方面的巨大成功。在备受企业欢迎的新版标准ISO9000:2000中,互利的供应商关系被作为八项质量管理原则之一,充分体现了供应商关系管理在企业经营实践中的作用和价值。企业要贯彻这一原则,就必须

大学毕业论文---软件专业外文文献中英文翻译

软件专业毕业论文外文文献中英文翻译 Object landscapes and lifetimes Tech nically, OOP is just about abstract data typing, in herita nee, and polymorphism, but other issues can be at least as importa nt. The rema in der of this sect ion will cover these issues. One of the most importa nt factors is the way objects are created and destroyed. Where is the data for an object and how is the lifetime of the object con trolled? There are differe nt philosophies at work here. C++ takes the approach that con trol of efficie ncy is the most importa nt issue, so it gives the programmer a choice. For maximum run-time speed, the storage and lifetime can be determined while the program is being written, by placing the objects on the stack (these are sometimes called automatic or scoped variables) or in the static storage area. This places a priority on the speed of storage allocatio n and release, and con trol of these can be very valuable in some situati ons. However, you sacrifice flexibility because you must know the exact qua ntity, lifetime, and type of objects while you're writing the program. If you are trying to solve a more general problem such as computer-aided desig n, warehouse man ageme nt, or air-traffic con trol, this is too restrictive. The sec ond approach is to create objects dyn amically in a pool of memory called the heap. In this approach, you don't know un til run-time how many objects you n eed, what their lifetime is, or what their exact type is. Those are determined at the spur of the moment while the program is runnin g. If you n eed a new object, you simply make it on the heap at the point that you n eed it. Because the storage is man aged dyn amically, at run-time, the amount of time required to allocate storage on the heap is sig ni fica ntly Ion ger tha n the time to create storage on the stack. (Creat ing storage on the stack is ofte n a si ngle assembly in structio n to move the stack poin ter dow n, and ano ther to move it back up.) The dyn amic approach makes the gen erally logical assumpti on that objects tend to be complicated, so the extra overhead of finding storage and releas ing that storage will not have an importa nt impact on the creati on of an object .In additi on, the greater flexibility is esse ntial to solve the gen eral program ming problem. Java uses the sec ond approach, exclusive". Every time you want to create an object, you use the new keyword to build a dyn amic in sta nee of that object. There's ano ther issue, however, and that's the lifetime of an object. With Ian guages that allow objects to be created on the stack, the compiler determines how long the object lasts and can automatically destroy it. However, if you create it on the heap the compiler has no kno wledge of its lifetime. In a Ianguage like C++, you must determine programmatically when to destroy the

相关主题