浅析建筑工程安全监理

摘要:作为建筑工程监理工作的重要组成部分,安全监理有助于工程建设的科学化、程序化、规范化,避免建设过程的随意性、盲目性、冒险性,全面预防建筑工程安全生产事故的发生。本文在分析建筑工程安全监理存在的困难和意义的基础之上,探讨了提高安全监理水平的具体措施,对相关工作人员有一定的借鉴作用。

关键词:建筑工程;安全监理;规范化

中图分类号:tu761文献标识码:a 文章编号:

abstract: as a project supervision of the important part of the security supervision of engineering construction to scientific, procedures, and standardization, avoid the construction process of arbitrary, blindness, adventure, and the comprehensive prevention construction engineering safety production accidents. based on the analysis of the construction engineering safety supervision the difficulties and the basis of meaning, discusses how to improve safety supervision level of specific measures to the related personnel is of certain reference.

key words: building engineering; safety supervision; standardization

随着我国经济社会快速发展,国家对于基础设施建设的投资力度逐渐增加,建筑工程中新设备、新材料、新技术不断应用,建筑

第二期厂房新建工程安全监理实施细则 推荐工程施工建筑技术交底组织设计监理方案模板安全实施细则

目 录 一、工程项目概况–––––––––––––––––––––2 二、安全目标值––––––––––––––––––––––2 三、安全监理依据–––––––––––––––––––––3 四、安全监理内容–––––––––––––––––––––3 五、安全监理工作流程–––––––––––––––––––4 六、监理工作控制要点细则–––––––––––––––––5 七、文明标化工地––––––––––––––––––––11 八、安全组织网络图–––––––––––––––––––17

一、本工程概况: 工程名称:第二期厂房F3、F4新建工程 工程地址:位于南汇区秀浦路 工程规模:总建筑面积约148158.78平方米 建设单位: 设计单位: 勘察单位: 监理单位: 总包单位:  本工程位于南汇区康桥工业园区,总用地面积为58091.98平方米。 二:安全目标

通过有效地控制施工中人为的冒险性,盲目性,和随意性的行为造成不安全因素的发展,把可能发生的事故消灭在萌芽状态,预防是消除患的最佳  途经,最终以安全第一、预防为主,实现重大伤亡事故为零。争创标化工地、优质工程。 三:安全监理编写依据 1.安全监理委托合同; 2.安全监理手册; 3.《中华人民共和国建筑法》; 4.《上海市安全生产条例》; 施工企业安全生产评价标准JGJ/T77-2003 5.JGJ59—99建筑施工安全检查标准; 6.JGJ46—88《施工现场临时用电安全技术规范》; 7.JGJ80—91《建筑施工高处作业安全技术规范》; 8.JGJ33—86《建筑机械使用作业安全技术规程》; 9.国家的安全生产方针,各级政府安全生产法规,行业安全生产规范性文件与技术规范和标准等。 四.安全监理内容 1.审核承包单位安全资质 2.监督安全生产协议书的签订与实施 3.审核承包商编制安全技术措施并监督实施 4.监督承包按规定标准搭设安全设施

建筑工程安全监理规划(完整版)

安全文明施工监理规划 工程名称: ------------------------- 编制单位: _________________________ 编制人: ___________________________ 审批人:___________________________ 日期:____________________________

一、工程概况; 二、编制依据 三、安全监理工作范围 四、安全监理工作内容 五、安全监理工作目标 六、监理组织形式、人员配备 七、监理人员岗位职责、 八、监理工作程序; 九、安全文明施工监理控制方法及措施 十、监理工作制度

、工程概况 工程名称:XXX 建设地址:XXX 工程规模XXX 抗震等级:二级; 抗震设防烈度:8度;设计使用年限:50年;屋面防水等级:H级,建筑耐火等级:二级;建设单位:XXX 地质勘查单位:XXX 设计单位:XXX 施工单位:XXX 监理单位:XXX 计划开竣工日期:XXX 二、编制依据 1 ?建设工程安全生产、劳动保护、环保、消防等法律法规和建设 工程安全生产标准和规范 2?建设工程监理合同及其他建设工程合同 3?监理大纲三、安全监理工作范围 1?委托监理合同范围以内 2.施工合同范围以内。 3.勘察设计文件范围以内。 4.相关法律、法规及建筑施工安全生产管理条例规定的。 四、安全监理工作主要内容 (一)施工准备阶段的安全监理工作内容 1?协助建设单位与施工单位签订建设工程安全生产协议书。

2.审查施工单位的建筑业企业资质和安全生产许可证,专业分包和劳务分包单位的建筑业企业资质和安全生产许可证。 3.审查特种作业人员操作资格证。 4.审查施工单位现场安全管理体系的符合性。 5.审查施工承包单位编制的施工组织设计的安全技术措施、专项施工方案,核查高危作业安全施工作业方案及应急救援预案。 6.重大危险源的安全管理。 (1)开工前审查施工单位对危险源的识别、评价及对重大危险源的确定、总监理工程师应在危险源性较大分部分项工程报审表上签认。 (2)审查危险性较大的分部分项工程专项施工方案,专项施工方案应附具安全验算结果。 (3)项目监理机构应针对危险性较大的分部分项工程编制安全监理细则, 7.建筑施工现场的安全监理。 监理工程师按照《河北省建筑施工现场扬尘防治18措施》的规 定,对施工现场进行监理,并符合以下要求: (1)监理工程师审核施工单位编制的养成防治施工方案、应急预案合格后报总监理工程师批准。 (2)施工现场必须挂有扬尘防治的责任主体的标牌,以及扬尘防治的责任制和现场负责人标牌。建立洒水和清扫台账。 (3)鼓励施工施工单位在施工现场安装空气监测仪和设置雾炮机。 (4)监理工程师检查施工现场围挡、大门是否封闭。施工道路的硬化、车

模板工程安全监理实施细则

XXXXXXX工程(项目名称) 模板工程安全监理实施细则 编制: 审批: 广西华蓝工程咨询管理有限公司 XXXX年XX月

目录(根据项目具体情况自行修改相关容和页码) 一、工程概况 (2) 二、编制依据 (2) 三、安全监理工作程序 (3) 四、安全监理工作控制要点及目标值 (4) 五、安全监理工作的方法 (5) 六、安全监理工作的措施 (7) 七、模板工程监测及安全检查 (7) 八、事故应急准备和响应处理监理 (9)

一、工程概况 工程名称: 工程地点: 建设单位: 勘察单位: 设计单位: 施工单位: 监理单位: 工程造价: 要求质量标准: 工期: 本项目模板工程专业特点: 重点阐述模板工程的特点、难点以及需要解决的问题等。 二、编制依据 1、国家及地方现行有关工程建设的政策、法律法规及其他要求如《建设工程安全生产管理条例》、《危险性较大的分部分项工程安全管理办法》(建质[2009]87号)、《建设工程高大模板支撑系统施工安全监督管理导则》(建质[2009]254号)等; 2、业主提供的经审查合格的设计图纸等技术资料; 3、经审批的监理规划; 4、经审批的模板工程安全专项施工方案; 5、国家现行有关建筑工程施工技术标准和规: 《混凝土结构工程施工质量验收规》 GB50204-2002(2011年版) 《建筑地基基础工程施工质量验收规》 GB50202-2002 《混凝土结构工程施工规》 GB50666-2011 《施工现场临时用电安全技术规》 JGJ46-2005 《建筑施工安全检查标准》 JGJ59-2011 《建筑机械使用安全技术规程》 JGJ33-2012 《建筑施工高处作业安全技术规》 JGJ80-91 《建筑施工扣件式钢管脚手架安全技术规》 JGJ130-2011 《建筑施工模板安全技术规》 JGJ162-2008

建筑工程施工监理合同范本(完整版)

合同编号:YT-FS-1775-86 建筑工程施工监理合同范 本(完整版) Clarify Each Clause Under The Cooperation Framework, And Formulate It According To The Agreement Reached By The Parties Through Consensus, Which Is Legally Binding On The Parties. 互惠互利共同繁荣 Mutual Benefit And Common Prosperity

建筑工程施工监理合同范本(完整 版) 备注:该合同书文本主要阐明合作框架下每个条款,并根据当事人一致协商达成协议,同时也明确各方的权利和义务,对当事人具有法律约束力而制定。文档可根据实际情况进行修改和使用。 【篇一】 发包方:______ 监理方:______ 依据《中华人民共和国合同法》,____(以下简称发包方)与____(以下简称监理方),就本项工程建设有关事项,经双方协商一致,订立本合同。 第一条下列名词和用语,除上下文另有规定外,具有本条所赋予的涵义 1.“工程项目”是指发包方委托监理方实施建设监理的工程建设项目。 2.“发包方”是指承担直接投资责任的、委托监理业务的法人以及其合法继承人。

3.“监理方”是指承担监理业务和监理责任的法人以及其合法继承人。 4.“监理机构”是监理方派驻本工程项目现场直接承担监理业务实施的组织,由总监理工程师、监理工程师和监理员以及其他人员组成。 5.“建设工程监理”是监理工程师根据本合同约定履行其职责,包括正常的监理工作和额外的监理工作。 6.“总监理工程师”是由监理方提名并经发包方同意后,委派到监理方履行本合同的现场负责人。 7.“承包方”是指与发包方签订工程建设合同的施工人。 8.“天”是指任何一个午夜至下一个午夜之前的时间段。 9.“月”是根据公历从一个月份中的任何一天开始到下一个月相应日期的前一天的时段。 10.“本合同”指经双方签署并生效的本监理合同。 11.“工程建设合同”是指发包方与承包方所签署

园林绿化工程安全监理实施详尽细则

园林绿化工程安全监理实施详尽细则

咸嘉生态文化城镇带 (南外环、太乙大道及规划七路)绿化工程 施工安全 监 理 细 则 编制 批准 编制时间: 咸嘉生态文化城镇带(南外环、太乙大道及规划七路) 绿化工程项目监理部

目录 一、工程项目概况 (3) 二、安全监理实施细则的编制依据 (4) 三、监理范围 (4) 四、监理工作流程 (4) 〈一〉监理工作依据 (5) 〈二〉施工监理工作程序 (5) 五、监理工作控制要点及目标值 (8) 〈一〉本工程监理预控措施 (8) 〈二〉本工程施工安全监理控制要点及目标值 (9) 六、监理工作方法及措施 (10) 〈一〉主要工程安全检查要点 (10) 〈二〉监理工作内容 (11) 〈三〉安全施工监理手段 (14) 〈四〉安全施工监理措施 (15)

咸嘉生态文化城镇带 (南外环、太乙大道及规划七路)绿化工程 安全监理实施细则 安全生产始终贯穿于整个建设工程的全过程,安全监理工作的主要任务是贯彻落实国家的安全生产方针、政策、法律、法规,督促施工单位按照国家有关安全生产的现行法律、法规和标准进行生产施工,消除施工中的冒险性、盲目性、随意性及违反各种操作规程的现象。 市政工程的安全监理工作不仅要监督检查各部位安全文明生产的安全防护措施的贯彻落实情况,还应该监督检查施工中各项安全措施的落实,以达到预防安全事故、控制和减少各类伤亡事故的发生,确保安全生产。 为了更好的贯彻落实《建筑法》、《安全生产法》、《建设工程安全生产管理条例》等法律法规,更充分的发挥监理单位所起的监督、帮助、促进、协调、服务的作用,落实安全监理责任,结合本工程实际情况,特制定本工程安全监理实施细则,以指导安全监理工作有效开展。 一、工程概况 工程名称:咸嘉生态文化城镇带(南外环、太乙大道及规划七路)绿化工程工程地点:南外环、太乙大道及规划七路沿线两侧 建设单位:咸宁市政府投资项目建设管理局 监理单位: 设计单位:湖北淦川园林景观设计有限公司 施工单位:湖北碧云园林绿化有限责任公司 工程规模: 总规模:181872.6㎡。 规划七路,红线范围:128339.1㎡。道路总长为2500m。绿化面积为57657.7㎡。草沟面积为6634.2㎡.湿沟为3860m。 太乙大道,道路总长为2880m。景观面积为68144.7㎡。绿化面积为64841.7㎡。海绵体面积为9677.7㎡。

建设工程安全监理统一用表

建设工程安全监理统一用表 目录 1、项目监理机构安全管理体系记录表 2、安全监理规划、细则、方案、措施编制与实施登记表 3、施工安全涉及强制性规定落实情况记录表 4、安全监理专项活动登记表 5、项目监理机构安全检查记录汇总表 6、施工安全技术方案、措施落实情况监理检查记录表 7、建筑施工现场安全管理监理检查记录表 8、施工安全管理资料监理检查记录表 9、安全隐患整改跟踪记录汇总表 10、安全隐患整改通知单 11、安全隐患整改通知单回复 12、安全隐患暂时停工通知书 13、安全整改复工报审表 14、施工安全隐患监理快报表 15、施工安全监理月报表 16、施工安全监理总结评价表 17、施工单位安全管理体系审查登记表 18、分包单位安全资格报审表 19、专项施工安全方案与措施审查登记 20、专项安全施工方案(技术措施)报审表 21、特种作业人员安全资质审查登记 22、施工安全教育培训、技术交底审查记录 23、施工企业各级安全生产检查与验收登记表 24、施工机械设备设施安全审查登记表 25、施工机械设备设施安全报审表 26、施工安全事故监理分析报告表 项目监理机构安全管理体系记录表

1、本表一式三份,监理单位、建设单位、施工安全监督机构各一份,工程开工前填报; 2、项目监理机构应如实、全面填写本表的内容,以从安全监理组织管理体系上保证履行安全监理责任。 3、随表应附相关人员资格、资历等证明资料及工作岗位分工与责任制度。 安全监理规划、细则、方案、措施编制与实施登记表 安监A--02

1、本表一式一份,项目监理机构保存,以备监理单位、建设单位、安全监督机构检查,并考核项目监理机构履行安全监理责任情况; 2、项目监理机构应如实、全面填写本表的内容,从安全监理技术措施上保证履行安全监理责任。 3、随表应附相应安全监理规划、方案、措施等文件保存在项目监理机构(也可报建设单位、施工安全监督机构)。 施工安全涉及强制性规定落实情况记录表

模板工程安全监理实施细则

模板工程安全监理细则 一、本工程模板支撑系统施工概况及要求: 模板工程概况:(模板工程高度、面积、楼层混凝土厚度及梁柱尺寸等)。 1、根据[建质(2004)第213号]、[沪建建管(2004)第113号]对危险性较大 的高大模板工程,高度达8M的模板及其支撑系统,跨度达18M施工荷载大于10KN/M或集中荷载大于15KN/M的模板支撑系统工程须经专家论证。 2、模板支撑高度达4M的模板工程属危险性较大工程,应对施工单位报审的模板支撑系统专项安全施工方案进行审核,监理项目部编制相应的模板工程安全监理实施细则; 3、对于模板支撑高度不足4M应根据建筑施工扣件式钢管脚手架安全技术规范 中模板工程要求进行检查; 根据以上要求结合本工程特点,施工单位必须编制相应专项安全方案及应急 救援预案,监理项目部编制安全监理实施细则,并进行过程中的安全监理。 二、模板工程安全监理依据 JGJ130-2001《建筑施工扣件式钢管脚手架安全技术规范》; DG/TJ08-016-2004《钢管扣件水平模板的支撑系统安全技术规范》 JGJ80-01《建筑施工高处作业安全技术规范》 建质(2003)第082号《建筑工程预防高处坠落事故的若干规定》 沪建建管(2004)第113号《关于加强危险性较大的分部分项工程安全管理意见》 沪建安质总(2005)第078号《关于加强钢管扣件水平模板支撑系统施工安全质量管理的通知》 沪建安质总(2005)《关于加强高大水平模板支撑系统管理、迎接全国工程质量监

督执法检查的通知》 沪建安质总(2005)第103号《关于印发预防高处坠落事故专项措施的通知》沪安质监(2006)第070号《关于开展预防高处坠落事故专项整治工作通知》沪建安质监(2004)第042号《关于开展建筑施工用钢管、扣件专项整治的通知》 三、模板工程强制性条文 1、钢管上严禁打孔; 2、立杆接长除顶层顶步外,其余各层各步接头必须采用对接扣件连接; 3、当脚手架基础下有设备基础、管沟时,在脚手架使用过程中不应开挖,否则必须采取加固措施; 4、严禁将外径48mn与51mm勺钢管混合使用; 5、剪刀撑、横向斜撑搭设应随立杆、纵向和横向水平杆等同步搭设; 6、拆除作业必须由上而下逐层进行,严禁上下同时作业; 7、旧扣件使用前应进行质量检查,有裂缝、变形的严禁使用,出现滑丝的螺栓必须更换; &模板及其支架应根据工程形式、荷载大小、地基土类别、施工设备和材料供应等条件进行设计、模板及其支架应具有足够的承载力、刚度和稳定性,能可靠地承受浇筑混凝土的重量、侧压力以及施工荷载; 9、模板及其支架拆除的顺序及安全措施应按施工技术方案执行; 四、安全监理工作内容 1、资料检查 审核施工单位模板支撑系统专项安全方案、图纸、计算书及相应的应急救援 预案;

建设工程施工监理规范(GB-)

建设工程监理规 GB50319-2000 第1章总则 第1.0.1条为了提高建设工程监理水平,规建设工程监理行为,编制本规。 第1.0.2条本规适用于新建、扩建、改建建设工程施工、设备采购和制造的监理工作。第1.0.3条实施建设工程监理前,监理单位必须与建设单位签订书面建设工程委托监理合同,合同中应包括监理单位对建设工程质量、造价、进度进行全面控制和管理的条款。建设单位与承包单位之间与建设工程合同有关的联系活动应通过监理单位进行。 第1.0.4条建设工程监理应实行总监理工程师负责制。 第1.0.5条监理单位应公正、独立、自主地开展监理工作,维护建设单位和承包单位的合法权益。 第1.0.6条建设工程监理除应符合本规外,还应符合现行的有关强制性标准、规的规定。 第2章术语 项目监理机构监理单位派驻工程项目负责履行委托监理合同的组织机构。 监理工程师取得监理工程师执业资格证书并经注册的监理人员。 总监理工程师由监理单位法定代表人书面授权,全面负责委托监理合同的履行、主持项目监理机构工作的监理工程师。 总监理工程师代表经监理单位法定代表人同意,由总监理工程师书面授权,代表总监理工程师行使其部分职责和权力的项目监理机构中的监理工程师。 专业监理工程师根据项目监理岗位职责分工和总监理工程师的指令,负责实施某一专业或某一面的监理工作,具有相应监理文件签发权的监理工程师。 监理员经过监理业务培训,具有同类工程相关专业知识,从事具体监理工作的监理人员。监理规划在总监理工程师的主持下编制、经监理单位技术负责人批准,用来指导项目监理机构全面开展监理工作的指导性文件。 监理实施细则根据监理规划,由专业监理工程师编写,并经总监理工程师批准,针对工程项目中某一专业或某一面监理工作的操作性文件。 工地例会由项目监理机构主持的,在工程实施过程中针对工程质量、造价、进啡、合同管理等事宜定期召开的,由有关单位参加的会议。 工程变更在工程项目实施过程中,按照合同约定的程序对部分或全部工程在材料、工艺、功能、构造、尺寸、技术指标、工程数量及施工法等面做出的改变。 工程计量根据设计文件及承包合同中关于工程量计算的规定,项目监理机构对承包单位申报的已完成工程的工程量进行的核验。 见证由监理人员现场监督某工序全过程完成情况的活动。

(建筑工程安全)施工安全监理实施细则(修改版).

(建筑工程安全)施工安全监理实施细则(修改版)

新建铁路西安至成都客运专线工程 XCJL---6标 安全三防措施 编制: 审核: 批准: 天津新亚太监理公司西成客专监理站

2013年5月25 目录 1 编制依据 (3) 2 工程概况 (3) 3 安全监理工作的原则 (4) 4.1安全监理组织机构图 (5) 4.2各级监理人员安全职责 (5) 4.2.1总监理工程师职责 (5) 4.2.2安全监理工程师职责 (6) 5 安全生产形势评估 (6) 6 安全控制目标 (7) 7 安全监理工作内容 (7) 7.1施工准备阶段安全监理工作主要内容: (7) 7.2施工过程中安全监理工作的主要内容 (8) 7.3竣工验收阶段安全监理工作的主要内容: (9) 8 专项安全监控要点 (9) 8.1施工机械及施工用电 (9) 8.1.1施工机械 (9) 8.1.2施工用电................................ ............. .11

8.2路基工程 (14) 8.2.1一般规定 (14) 8.2.2路堤 (14) 8.2.3路堑 (15) 8.3.1轨料、道碴的装卸和搬运 (17) 8.3.2机械铺轨 (18) 8.4.3桩基础 ................................. . (22) 8.4.4桥梁墩台 (25) 8.4.5混凝土梁灌筑与架设 .................... .. (26) 8.4.6涵洞、渡槽、倒虹吸管 (31) 8.4.7防水层施工 (31) 8.6跨公路 (32) 8.6.1跨越公路、河道和构筑物施工需要做到“六不准、六到位” (32) 8.7沿、跨铁路既有线施工安全 (34) 8.7.1基本规定 (34) 8.7.2营业线施工分类 (36) 8.7.3施工计划的编制、审报及审批 (38) 8.7.4营业线施工安全控制和防范要点 (40) 8.7.5营业线道口安全 (41) 8.7.6电气化区段施工安全 (42)

建筑工程安全监理

浅析建筑工程安全监理 摘要:作为建筑工程监理工作的重要组成部分,安全监理有助于工程建设的科学化、程序化、规范化,避免建设过程的随意性、盲目性、冒险性,全面预防建筑工程安全生产事故的发生。本文在分析建筑工程安全监理存在的困难和意义的基础之上,探讨了提高安全监理水平的具体措施,对相关工作人员有一定的借鉴作用。 关键词:建筑工程;安全监理;规范化 中图分类号:tu761文献标识码:a 文章编号: abstract: as a project supervision of the important part of the security supervision of engineering construction to scientific, procedures, and standardization, avoid the construction process of arbitrary, blindness, adventure, and the comprehensive prevention construction engineering safety production accidents. based on the analysis of the construction engineering safety supervision the difficulties and the basis of meaning, discusses how to improve safety supervision level of specific measures to the related personnel is of certain reference. key words: building engineering; safety supervision; standardization 随着我国经济社会快速发展,国家对于基础设施建设的投资力度逐渐增加,建筑工程中新设备、新材料、新技术不断应用,建筑

模板工程安全监理实施细则(最新版)

模板工程安全监理实施细则 (最新版) Safety management is an important part of enterprise production management. The object is the state management and control of all people, objects and environments in production. ( 安全管理 ) 单位:______________________ 姓名:______________________ 日期:______________________ 编号:AQ-SN-0777

模板工程安全监理实施细则(最新版) 一、本工程模板支撑系统施工概况及要求: 模板工程概况:(模板工程高度、面积、楼层混凝土厚度及梁柱尺寸等)。 1、根据[建质(2004)第213号]、[沪建建管(2004)第113号]对危险性较大的高大模板工程,高度达8M的模板及其支撑系统,跨度达18M,施工荷载大于10KN/M2或集中荷载大于15KN/M的模板支撑系统工程须经专家论证。 2、模板支撑高度达4M的模板工程属危险性较大工程,应对施工单位报审的模板支撑系统专项安全施工方案进行审核,监理项目部编制相应的模板工程安全监理实施细则; 3、对于模板支撑高度不足4M应根据建筑施工扣件式钢管脚手

架安全技术规范中模板工程要求进行检查; 根据以上要求结合本工程特点,施工单位必须编制相应专项安全方案及应急救援预案,监理项目部编制安全监理实施细则,并进行过程中的安全监理。 二、模板工程安全监理依据 JGJ130-2001《建筑施工扣件式钢管脚手架安全技术规范》; DG/TJ08-016-2004《钢管扣件水平模板的支撑系统安全技术规范》 JGJ80-01《建筑施工高处作业安全技术规范》 建质(2003)第082号《建筑工程预防高处坠落事故的若干规定》 沪建建管(2004)第113号《关于加强危险性较大的分部分项工程安全管理意见》 沪建安质总(2005)第078号《关于加强钢管扣件水平模板支撑系统施工安全质量管理的通知》 沪建安质总(2005)《关于加强高大水平模板支撑系统管理、迎

浅析我国建筑工程施工监理现状及完善对策 王刚

浅析我国建筑工程施工监理现状及完善对策王刚 发表时间:2019-04-02T14:25:32.333Z 来源:《基层建设》2019年第1期作者:王刚 [导读] 摘要:从我国建筑工程监理现状分析,无论从国家或者社会的要求来说,还是从监理公司本身利益着想,搞好施工阶段的安全监理工作刻不容缓。 邹平市好生街道办事处村镇建设管理站 256219 摘要:从我国建筑工程监理现状分析,无论从国家或者社会的要求来说,还是从监理公司本身利益着想,搞好施工阶段的安全监理工作刻不容缓。加强对我国建筑工程监理的现状。探讨了目前建筑工程监理存在的问题,并针对存在问题提出了相应的对策,以期推动我国建筑工程监理行业的发展。 关键词:建筑工程;监理;施工 随着我国经济社会的快速发展,城市化进程的加快,推动了我国城市基础设施及建筑业的迅速发展。然而,在建筑施工中安全及质量事故时有发生,如何加强建筑工程安全监理工作就显得十分重要。通过对我国建筑工程安全监理的现状分析,指出了存在的问题,论述了加强建筑工程安全监理的管理策略。 一、建筑工程施工监理的现状和问题分析 (一)施工监理有责无权。 近年来,施工监理的重要性逐渐赢得了建筑施工行业的共同的认可,我国制定了许多法律法规和行业政策来规范企业监理职责。但是在具体的施工过程中,这些法律法规和政策很难真正落到实处,监理职责很难得到落实和发挥。究其根源,一方面,法律法规虽然赋予了监理工作明确的职责,但是却缺少详细具体的工作流程;另一方面,监理部门与施工企业之间有着难以分割的利益关系,财政预算、人员工资等方面都难以完全脱钩,这就导致监理部门行使权力时不得不考虑与施工企业之间的利益关系,不得不受到来自于施工企业的约束和限制,那么监理的职责就很难完全发挥出来。尤其是近年来,监理企业之间的竞争日趋白热化,为了赢得市场,监理企业在许多情况下都得向违规操作妥协。但是这种妥协换来的并非是长期的生存发展,相反,一旦引发安全事故,监理单位首当其冲要承担责任。监理的责任重大,但是权利却受限于种种原因无法得到有效的保障。 (二)工程监理机制不够健全。 建筑工程施工监理在我国起步时间相对较晚,因此,我国对于监理领域的研究也相对薄弱些,理论和实践经验的匮乏导致监理机制不够健全。而随着建筑工程施工项目的不断增加和发展,传统的建筑工程监理机制已经无法应对建筑行业的需求。我们必须要对监理工作有全新的定位和认识,否则建筑工程监理的作用就难以彻底地发挥出来。比如,在建筑工程施工过程中,监理的重点是针对施工质量本身,对于原材料管理、成本管理监督等重大环节缺乏有力的管理和监督,这也是当前建筑工程监理机制的重大弊端。如果监理企业自身还没有认识到这种缺陷和不足,不积极改善自己的管理方式和方法,不制定符合我国国情的书面管理政策让监理人员有明确科学的标准可以依照,那么势必会影响到施工监理工作的开展。 (三)建设监理的收费标准低。 建设监理的收费标准一直处于较低水平,这也直接影响到了监理行业工作人员的薪资水平。低薪资高责任的严重不匹配,导致了监理行业许多优秀高度值的监理人才的流失,长此以往,整个监理队伍的整体水平必然会受到影响。再者,低薪资直接影响工作人员的积极性,许多监理不到位、监理服务态度差等都是由于较低的薪资水平导致的。此外,虽然第三方监理单位是我国明文规定必须聘请的机构,然而单位之间仍是存在激烈竞争、彼此打压的现象,降低了企业利润,阻碍了企业发展。 (四)监理信息管理落后。 现代社会早已步入了网络时代,网络信息技术几乎是无所不在的,建筑工程施工监理工作也不可避免地收到了网络信息技术的影响。但是,我国建筑施工监理的信息管理水平整体并不高,许多年纪较大的监理人员甚至完全不懂网络技术。在传递信息时仍采用手写、人工的方式,使得文件不统一,降低工作效率,建筑施工监理手段缺乏科学性、系统性。 二、提高建筑工程监理工作效率的主要途径探讨 (一)完善相关法律法规。 提高建筑工程监理行业的工作效率需要依赖政府层面和企业层面的共同努力。政府部门可以通过建立健全法律体系来实现对市场和运作行为的有效管理,促进监理行业的健康发展。作为监理人员,需要不断学习行业法律法规,提高自身的法律素养,努力使自身适应日趋完善的法律法规。企业方面,监理单位还应建立一套科学、有效、完善的处罚机制那些与政策规定不符的施工工程,监理单位应该对其施工行为进行严令禁止,并与实际情况相结合,做出正确、合理的处理,如果有必要,还可以与政府部门进行联合,追究施工单位的法律责任而那些不达标的建筑,监理单位应该勒令施工单位予以拆除并进行返工,从根本上震慑施工单位,促使其对施工进度和质量予以保证,避免日后安全事故的发生,提高整个建筑行业的公信力和形象。 (二)正确处理监理与业主的关系。 建筑工程监理单位作为业主的委托代理人,在合同规定的范围内行使自己的权利履行自己的义务,为工程质量负责。但是在具体的施工建设过程中,很多时候监理工作人员无法得到业主的支持,业主会更多地将监理看做是工程顾问,甚至有些时候还会直接干预监理工作。这是摆在监理单位面前一个无法回避的难题,要求我们的工作人员必须灵境对待。如果是业主的合理化的需求,我们要在能力范围内给与最大化的满足,建立起与业主相互信任的关系,避免不必要的冲突。 (三)提高监理信息管理水平。 首先,我们必须建立和健全领导负责制信息源。领导是一个队伍权威的存在,尤其在建筑施工监理过程中,领导发挥着举足轻重的作用,我们要坚决贯彻实行领导建筑施工质量终身负责制。整个工程阶段一旦出现问题,哪怕已经发生了职位的变动,但是相关的领导人依然要担起责任;另一方面,搭建施工质量管理横向监督平台一旦在监理过程中发现违法违规行为,监理单位应该切实做到依法、严肃处理,保证违法必究、执法必严的实现。通过信息交流平台的建立,实现对施工质量监督的信息化,促进对施工质量的监督与管理。 三、建筑施工监理过程中质量控制的改进措施 针对目前建筑施工监理过程中质量控制存在的问题,通过分析归纳业内成功案例的经验,我们应当从以下几方面给进建筑施工监理的

建筑工程安全文明施工监理细则

建筑工程安全文明施工监 理细则 The pony was revised in January 2021

×××

建筑工程安全文明施工监理细则 一.文明施工监理的有关标准、规范 1.JGJ59-99 《建筑施工安全检查标准》; 2.JGJ130-2001 《建筑施工扣件式钢管脚手架安全技术规范》; 3.JGJ128-2000 《建筑施工门式钢管脚手架安全技术规范》; 4.JGJ46-88 《施工现场临时用电安全技术规范》; 5.JGJ88-92 《龙门架及井架物料提升机安全技术规范》; 6.JGJ80-91 《建筑施工高处作业安全技术规范》; 7.广州地区建筑工程质量安全监督站2000年7月编排的《安全管理汇编》; 8.国家行业和地方的有关安全文明生产的法规、标准、规范等。 二.监理的安全文明施工责任 代表甲方对施工全过程的监理,负有安全文明施工的监理责任。 1.按照经济全同内容,落实安全技术措施费用; 2.根据安全责任制和管理目标,协调各施工队伍搞好安全生产管理工作,组织施工现 场全局性或专项的安全检查; 3.督促事故隐患的整改。 三.监理的主要工作内容 1.对施工单位进行各阶段安全文明施工监督交底; 2.检查施工单位“资质证书”、企业及现场安全生产体系、安全生产责任制;

3.检查施工单位及施工人员执行国家、行业和地方的安全生产法规和安全技术标准、 规范等的状况和有关安全行为; 4.对施工单位进行开工安全生产条件检查; 5.检查施工单位各分部(项)工程的安全技术方案(措施)的拟订及审批签字和落实 情况; 6.检查大中型施工机械、设施的安装、拆卸方案、安全措施的拟定及审批签字和落实 情况,检查其验收手续、准用证和年审记录; 7.检查施工单位的安全技术交底、职工安全教育、特殊工种上岗、现场安全检查记录 等,安全管理资料是否齐全有效; 8.督促施工单位进行经常性和定期性的安全文明施工检查,组织施工现场进行安全文 明施工大检查,配合地区安全监督机构进行安全文明施工的大检查,并督促施工单位整改,检查整改执行情况;实施安全、文明施工单位评分考核、竣工评定安全等级; 9.督促施工单位在施工全过程中做好安全文明施工资料的整理并移交归档。 四.安全文明施工监理 工程开工前将“关于安全文明施工对施工单位交底函”(见附件一)交付施工单位并按函件内容进行会议交底,督促施工单位迅速开展安全文明施工各项工作。 1.施工初期安全文明施工监理。 1)查验施工单位的“资质证书”,施工单位必须取得由建设行政主管部的签发的《施工许可证》、《余泥渣土排放证》等。 2)督促施工单位建立并落实安全生产责任制、安全管理目标、工地应有工程项目安全生产的第一责任人和直接责任人、防火责任人、专职工地安全员的任命书。

建筑施工安全监理的风险管理(正式)

编订:__________________ 单位:__________________ 时间:__________________ 建筑施工安全监理的风险 管理(正式) Standardize The Management Mechanism To Make The Personnel In The Organization Operate According To The Established Standards And Reach The Expected Level. Word格式 / 完整 / 可编辑

文件编号:KG-AO-7494-46 建筑施工安全监理的风险管理(正 式) 使用备注:本文档可用在日常工作场景,通过对管理机制、管理原则、管理方法以及管理机构进行设置固定的规范,从而使得组织内人员按照既定标准、规范的要求进行操作,使日常工作或活动达到预期的水平。下载后就可自由编辑。 【摘要】本文结合风险管理及针对施工现场存在问题,从工程建设项目施工现场安全风险体系出发,对工程建设项目中施工安全的监理控制进行了探讨。 【关键词】安全监理;风险控制;防范 前言 建筑业多年来一直是安全事故高发的行业。安全事故的频发给施工企业带来巨大的经济损失,还会严重影响企业的经济效益和信誉。另外,随着建设工程个性化的加强,高层、超高层、地下建设工程的涌现,工程结构、施工工艺的复杂化,新技术、新材料、新设备等的广泛应用,给建设工程施工安全技术与管理带来了新的挑战。显然,加强施工安全监理,有利于规范工程建设参与各方主体的安全生产行为,促使施

工单位保证施工安全。 1.实施安全风险管理对施工环境和施工活动的安全风险进行识别,确定和度量,制定、选择和实施风险处理的过程就是安全风险管理。其目的是消除或减少风险,避免或控制安全事故的发生。运用风险控制技术进行安全监理,实现事故预防,保证施工安全就是监理工程师的主要职责。 1.1 建立危险源清单危险源是导致事故发生的根源,是产生安全事故的原因,所以对危险源的控制是安全风险管理的核心。在建设工程施工前,监理工程师应根据工程特点和施工内、外部条件,以及类似工程安全风险统计资料信息,对施工作业和管理活动中的危险源按工程实施阶段、工程组成内容和风险因素分类进行识别和确认。对确认的危险源,按照安全事故发生的概率和损失严重程度进行评价分类,确定重大危险源,并制定安全风险控制措施,依此建立危险源清单。 1.2 监测、控制危险源监理工程师在施工过程中,

2021年高大模板工程安全监理细则

When the lives of employees or national property are endangered, production activities are stopped to rectify and eliminate dangerous factors. (安全管理) 单位:___________________ 姓名:___________________ 日期:___________________ 2021年高大模板工程安全监理细 则

2021年高大模板工程安全监理细则导语:生产有了安全保障,才能持续、稳定发展。生产活动中事故层出不穷,生产势必陷于混乱、甚至瘫痪状态。当生产与安全发生矛盾、危及职工生命或国家财产时,生产活动停下来整治、消除危险因素以后,生产形势会变得更好。"安全第一" 的提法,决非把安全摆到生产之上;忽视安全自然是一种错误。 一、工程概况 二、编制依据 1、JGJ130-2001建筑施工扣件式钢管脚手架安全技术规程 2、DG/TJ08-16-2011钢管扣件式模板垂直支撑系统安全技术规程 3、JGJ80-91建筑施工高处作业安全技术规程 4、JGJ59-2011建筑施工安全检查标准 5、JGJ46-2005施工现场临时用电安全技术规范 6、本工程施工图纸、设计交底及图纸答疑文件 三、搭设工艺 1、工艺流程 按上述立杆间距,在楼层上放线定位→立杆与水平杆用扣件连接成第一层支撑架体→对立杆的垂直度进行初步校正→搭设扫地杆并再次对立杆的垂直度进行校正→逐层搭设支撑架体和竖向剪刀撑。 2、搭设注意事项

共享大厅模板排架由立杆、水平杆、扫地杆、水平剪刀撑(水平加强层)、垂直剪刀撑、扣件、底支座组成。 A、材料 采用φ48×3.5钢管搭设,钢管和扣件材质分别符合GB/13793、GB/T3092、GB/5831规定;禁止使用有缺陷的钢管扣件。 B、垫板 在立杆底部垫放5cm厚20cm宽木板,其长度≮2跨。 C、立杆 接长:除上不采用搭接接长外,其余均采用对接接长。搭接长度≮1m。注意接头错开至少一步,或在同步内像个1~2根立杆设置。不得在同一步内相邻立杆设置或同一个平面上集中设置。立杆下部采用φ48×3.5长6m的钢管,顶部用钢管连接,在梁(宽度大于等于400)轴线下增设一排立杆。垂直度:≯8mm。 D、剪刀撑 接长:搭接接长,搭接长度≮1m。连接:剪刀撑应与立杆或水平杆用旋转扣件连接。在整个平面和里面内连续设置,不中断。 E、纵横向水平杆 接长:对接接长。设置:沿每排立杆的纵向和横向分别连续设置;

建设工程施工监理工作内容及要求[1]

建设工程监理工作内容及要求 1、监理合同 1.1中标通知书:招投标项目必须有中标通知书,其他项目应有直接发包备案书; 1.2监理合同:正确使用《建设工程委托监理合同》示范文本、无越级承接业务、无个人以本单位名义承接业务、无转让监理业务; 1.3监理取费:符合省文件、符合国家[2007]670号文,无恶意压低竞争、无阴阳合同、无回扣等。 2、组织机构 2.1总监理工程师:符合任职资格、有监理单位任命文件; 2.2总监代表:符合任职条件、有总监授权书; 2.3人员数量:满足监理工作需要,变动有合法手续; 2.4持证上岗:监理人员必须取得相应资格、佩带岗牌; 2.5专业配套与组织机构:组织机构合理、专业配套、职责分工明确。 3、监理规划与实施细则 3.1监理规划:编制、审批符合程序,内容应有监理安全责任的监理方案责任范围、工作程序和制度措施应有针对性、可操作性; 3.2实施细则:编制、审批符合程序,内容应有监理安全生产的监理方法、措施和危险源控制点的设置。 监理规划和实施细则应有建筑节能工程专篇。 4、设计文件 4.1设计图纸:有施工图审查意见书;

4.2设计交底与图纸会审:有设计交底和图纸会审纪要,且各方签字齐全; 4.3工程变更:设计变更程序符合规定。 5、开工报告 5.1开工条件:施工许可证已领取,施工组织设计已审批,施工测量控制点、首道工序的准备工作已完成,施工现场的场地、道路、水电、通讯和临时设施已满足开工要求,地下障碍物已清除或查明,施工图纸及设计文件已按计划提供齐全,施工人员已按计划到场; 5.2施工许可:有施工许可证;若无施工许可证,应处理得当; 5.3时效性:符合时间逻辑。 6、工地会议 6.1第一次工地例会:参建各方主要负责人参加会议,内容符合要求,有会议纪要; 6.2工地例会:按规定正常召开工地例会,由总监主持,有例会纪要; 6.3专题会议:根据需要及时组织专题会议,解决施工过程中的各种专项问题。 7、测量放线成果审查 7.1控制点复核:控制点要求监理人独立进行复核、引测依据正确; 7.2规划放线:应有规划部门放线书面签证单; 7.3测量复核:对报审的测量放线成果进行独立复核、有明确的书面审核意见。 8、工程材料、构配件、设备检验

建筑幕墙工程安全监理实施细则

. 余政储出(2013)53号地块 (幕墙工程) 安 全 监 理 细 则 编制: 审批: 浙江荣阳工程监理有限公司 杭行道项目监理部 2018 年7月5日

目录 一、专业工作特点 二、安全监理工作依据 三、安全监理工作的程序 四、安全监理工作的特点 五、安全监理工作的控制要点及目标值 六、安全监理工作的方法 七、安全监理工作的措施

一、专业工作特点 1、本项目办公T1楼、T2楼、T3楼、T4楼一二层商铺和商业楼幕墙工程,分为石材幕墙、玻璃幕墙、金属幕墙。干挂石材幕墙采用干挂式结构,热浸镀锌钢龙骨、不锈钢挂件 二、安全监理工作依据 (1)、《建筑施工安全检查标准》JGJ59-2011 (2)、《建筑施工安全检查标准》浙建建【1999】190号(3)、《建筑幕墙》GBT21086-2007 (4)、《金属与石材幕墙工程技术规范》(JGJ133 -2001)(5)、《建筑施工附着升降脚手架管理暂行规定》(建建【2000】230号) (6)、《建筑施工高处作业安全技术规范》(JGJ80) (7)、《建筑机械使用安全技术规程》(JGJ33-2001) (8)、《关于加强工程建设安全质量技术责任制的暂行规定》(浙建建【2003】35号) (9)、已批准的《监理规划》 (10)《幕墙安装工程施工方案》 (11)《建筑装饰装修工程质量验收规范》(GB50210-2001)三、安全监理的程序 (1).审查承包(分包)单位的有关安全生产的文件:

1) 《安全生产许可证》; 2) 安全生产管理机构的设置及安全专业人员的配备等; 3) 安全生产责任制及管理体系; 4) 安全生产规章制度; 5) 特种作业人员的上岗证及管理情况; 6) 起重机械的检测检验、验收、备案手续。 7)幕墙工程的安全生产操作规程 (2).审查承包单位幕墙安装工程专项施工方案: 1.审核幕墙安装工程施工方案的编写、审批: 1.1幕墙安装工程施工方案应由承包单位的专业工程技术人员编写; 1.2幕墙安装工程施工方案应由施工单位技术、质量、安全等有关部门进行联合会审; 1.3幕墙安装工程施工方案应由具有法人资格的施工单位技术负责人批准; 1.4幕墙安装工程施工方案应由分包单位报施工总承包单位审核、批准。 1.5幕墙安装工程施工方案应由施工总承包单位报监理单位审批认可; 1.6安全技术措施变更或修改时,应按原程序由原编制审批人员批准。 2、审核幕墙安装工程施工方案是否符合工程建设强制性标准。 幕墙工程的施工图、结构计算书、设计说明及其他设计文件中有关安