Discussion about the application of the anchor bar on the

slope construction

Fu Ming Fu , Zhang Tian

Abstract:There are some advantages in strengthening slope with the anchor bar, such as low project cost, convenient for construction and so on. It not only meets the requirement of the reliability of the construction, but also is economic and reasonable for the construction.

Key words: anchor bar; slope; strengthening

1.Introduction

Anchor technique uses strata geotechnical’s shear strength around bolt to deliver structures pulling force or keep strata of the excavation own stability. Due to the use of the anchor rod, Anchor strata produce compressive zone and have reinforcement effect to strata, can enhance the strength of strata, improve mechanical properties of strata, make structure and stratum together formed a kind of work together complex. Anchor system can effectively sustain tension and shear, improve shear strength of the potential sliding surface, so it can effectively prevent slope to produce sliding damage.

Fig 1 after excavation of the slope

2.Project profile

The length of a slope is about 60m, the most slope height is about 23m,the angle up to 50°~ 75°, a five-layer frame structure buildings is far from about 1.5 to 4m at its base edge, its foundation is artificial bored pile and its bearing stratum is in weathered phyllite. Due to the strong weathering of rocks, it was chunky, loosely structured, multi-muddy filling. It has residual slope deposits of silty clay overlying and local folder with a pulpy, low strength. Slope had

collapsed at various locations, it is vary dangerous to the building, so we need to reinforce the slope, and we use stone concrete retaining wall and bolt to support it.

3.Bolt retaining and protecting design

3.1Bolt design

(1)all formation of anchor use whole length bond-type, the binder materials are ordinary cement mortar, the mortar strength grade is M30, the anchor length L is 10 meters, the slope height h is 9 meters. Anchoring section length is 5m.

(2)According to the construction condition and the needs of the process, the layout form of anchor use quincunx, and in order to make the anchoring force in the role of surface rock surface with uniform, the two adjacent line bolts should be staggered arrangement.

(3)The anchor’s number according to /3.24 per meter to calculation, the anchor length is L, a tolal of 252. The diameter of drilling holes is φ90,the number of drill according to (L-0.1)m per hole to calculation, M30 grout number according to average 0.052m3per hole to calculation.

(4)The two adjacent rows vertical spacing of anchor take 2.55m, horizontal spacing take 2.55m. The dip angle of anchor: with the angle of horizontal line is 20°, and drilling down with this Angle.

(5)Anchor use the steel bar, which is HRB400 level, 28mm diameter.

3.2Anchor calculation

(1)The calculation of lateral geotechnical pressure[1][2]

When the supporting structure to leave in rock and earth mass direction migration until to the limit equilibrium state, the geotechnical pressure which is role in supporting structure called active geotechnical pressure. Its calculation method is as follows:

For the slope which has no flare structure surface, generally speaking, failure is controled by rock mass strength, the calculation formula is same to the active soil pressure, but cohesive force C take zero, internal friction angle ?use e?(rock mass equivalent internal friction angle) instead of, according to the standard to selection; rupture angle is 45°+?/2(?is rock mass internal friction angle, is estimationed by haircut at the standard of rock mass internal friction angle, reduction factor according to the standard to selection).

According to the engineering survey, active rock pressure can calculation as follows:

(2)the calculation of anchor tension design value a Q ak N N γ= (1)

(2) In the formula: a N is anchor tension design value; ak N is anchor tension standard value; Q γis partial load factor, take 1.3; tk H is the horizontal tension standard value of anchor; αis the dip angle of anchor.

Through the calculation, ak N =112.3kN a N =145.99kN

(3)the calculation of anchor steel section area

(3) In the formula: S A is the steel section area of anchor; ογ is slope engineering importance coefficient(the slope engineering importance coefficient of this project is level 1, take 1.1); 2ξis the tensile working conditions coefficient of anchor bar ( permanent anchor take 0.69, temporary anchor take 0.92); y f is the tensile strength design value of anchor bar(standard value k y f =400a MP , design value y f =360a MP ).

According to the calculation, S A ≥0.5883210m -?,choose level 3 steel of 1φ28mm,

S A =0.6153210m -?.

(4)The calculation of anchorage body and rock mass anchoring length

anchoring length should not only meet the requirements which the bond force of formation on mortar and the bond stress of mortar on steel, but also meet the requirements that the Structure design codes the Minimum anchoring length.

(4) In the formula: a l is the anchoring length; D is the diameter of anchorage body; rb f is the bond strength eigenvalue of layer and anchorage body, through the experiment or local experience sure, or according to the standard to selection ( this engineering ’s rock mass uniaxial compressive 2222111209tan (45)2090.217175.77/2222

e a a

E H K kN m ?γ?==???-=???=cos tk

ak H N α=2a S y

N

A f ογξ≥1ak a rb

N l Df ξπ≥

strength is 7.46a MP , belong to soft rock, rock mass structural plane development, rb f take 300a KP );1ξis the bond working conditions coefficient of anchorage body and layer (permanent anchor take 1.00).

According to the calculation, a l ≥4.3m, take a l =5.0m.

(5)The anchoring length between anchor steel and anchor mortar

a l ≥ (5) In the formula: a l is the anchoring length between steel and mortar; d is the diameter of anchor bar; n is the number of steel;

b f is the bond strength design value between steel and anchor mortar, through the experiment sure, or according to the standard take 2.40; 3ξ is the working conditions coefficient of steel and mortar bond strength(permanent anchor take 0.60). According to the calculation, a l ≥2.1m ,take a l =5.0m.

3.3 The construction technology and key points of anchor

The anchor ’s construction technology is as follows: build-up scaffold ——excavate and clear up the slope surface ——measures to fix position ——drill hole ——washing hole ——bolt put in a certain place ——grout ——colligation the end of the anchor ——flushing the slope surface ——pouring frame space ——Spray seed

(1)This slope belong to rocky slope, after excavate the slope 10 cm to the underside of the frame space, set bolt and pouring frame space, then spray grass or seeds after borrowed soil 20 cm in the frame space.

(2)the slope should be payed attention to clean up, when construction. The anchor should be placed after wash hole, then put pressure (0.4MPa) and grout. After the mortar fully solidification, colligation steel, cast-in-place reinforced concrete frame space, bend the end of the anchor and bind point by point with the skeleton steel.

(3)Before drilling, the hole should be measured to fix position and then do mark. Pitch deviation is less than 150mm, hole depth error is less than 50mm. Try not remold the surrounding rock, when drill. Before Put the anchor, it should be attentioned that blow wash clean the water of the hole and rock powder and so on, and rust removal the body of rod. When grouting, builders 3a b

N n df ογξπ

should attention the grouting pressure and mortar ratio.

Fig 2 anchor field construction drawing

4.Conclusion

It is economical to reinforcement slope with bolt, and use the normal equipment, It is not only achieve safe and also economy and rational.

(1) Today bolt technology is widely used in the project. It is an effective reinforcement measures to constraints sliding soil with the combining of bolt and concrete slope protection.

(2) We must be sure to do geological exploration work of the slope to find out the nature of the rock and hydrogeological situation before reinforcing slope by grouting bolt.

(3) Due to the factors of engineering geological conditions, grouting pressure and construction technology, we should be given adequate attention to the quality of construction.

Reference

[1]Technical code for building slope engineering (JGJ 120-99). The People's Republic national

standards. Beijing: China Architecture & Building PRESS.

[2] Ying-Ren Zheng, Zu-Yu Chen etc. Engineering Treatment of Slope & Landslide [M]. Beijing:

China Communications Press,2007

[3] LuoZhenHai. Talk shallowly the application of the anchor at the slope reinforcement[J]. Fujian

Construction Science & Technology,2010,06:15-16

浅谈锚杆技术在边坡工程中的应用

1.引言

锚杆技术是利用锚杆周围地层岩土的抗剪强度来传递结构物的拉力或保持地层开挖面的自身稳定。由于锚杆的使用,使锚固地层产生压应力区并对地层起到加筋作用,来增强地层的强度,改善地层的力学性能,使结构与地层一起形成一种共同工作的复合体。锚杆体系其能有效地承受拉力和剪力,能提高潜在滑移面上的抗剪强度,有效地阻止坡体产生滑动破坏。

2.工程概况

某边坡长约60m,最大坡高约23m,坡度达50°~75°,为岩质边坡。距坡底边缘约1.5~4m处有1栋5层框架结构建筑物, 人工挖孔灌注桩基础,建筑物以中风化千枚岩为持力层。因岩石风化强烈,呈碎块状,结构松散,多为泥质充填。上覆残坡积粉质粘土,局部夹有泥状,强度较低。边坡坡体多处位置曾发生崩塌,对建筑物存在威胁,所以需对边坡进行加固,采用的是块石混凝土挡墙+锚杆进行支护。

3.锚杆支护设计

通过计算可得a E =175.77 kN/m 。

(2)锚杆轴向拉力设计值的计算 a Q ak N N γ= (3-2)

其中:S A 为锚杆钢筋截面面积;ογ为边坡工程重要性系数(本工程边坡工程安

全等级为一级,取1.1);2ξ为锚筋抗拉工作条件系数(永久性锚杆取0.69,临

时性锚杆取0.92);y f 为锚筋抗拉强度设计值(标准值k y f =400a MP ,设计值

y f =360a MP )。

根据计算可得S A ≥0.588 3210m -?,选用1φ28mm 的三级钢,

S A =0.6153210m -?。 (4)锚杆锚固体与岩土体锚固长度的计算

锚杆锚固段长度除应同时满足地层对砂浆的粘结力和砂浆对钢筋的握裹力要求外,还应满足构造设计规定的最少锚杆锚固长度的要求。

式中:

a l 为锚筋与砂浆间的锚固长度;d 为锚筋直径;n 为钢筋根数;

b f 为

钢筋与锚固砂浆间的粘结强度设计值,由试验确定,也可按表取为 2.40;3ξ为

钢筋与砂浆粘结强度工作条件系数(永久性锚杆取0.60)。

由公式计算可知a l ≥2.1m ,实际取a l =5.0m 。

3.3 锚杆施工工艺与要点

锚杆施工的工艺流程为:搭设脚手架——坡面开挖整修——测量定位——钻孔——清孔——锚杆安放——注浆——锚杆端部绑扎——冲洗坡面——浇框格——喷草籽

(1)本边坡为石质边坡,坡面开挖10cm 至框格底面后设锚杆、浇框格,再在框格内客土20cm 后喷播草、灌籽。

(2)施工时应注重边坡清理,锚杆孔清孔后方可放置锚杆并加压(0.4MPa)注浆,在孔内砂浆充分凝固后扎筋,现浇钢筋砼框格,锚杆端部弯折并与纵横骨架筋间逐点绑扎。

(3)钻孔前需测量定位,做好标记,孔距偏差小于150mm ,孔深误差小于50mm 。钻孔时尽量不扰动周围岩层,安放锚杆前注意将孔内积水和岩粉等吹洗干净且杆体应除锈。注浆时注意注浆压力及砂浆配比。

图3.7锚杆现场施工图

4.结论

边坡工程采用锚杆进行边坡加固,工程造价较低,对施工器械要求不高,在达到安全可靠的同时兼顾了工程施工的经济性和合理性。

(1)当今锚杆技术在工程中被广泛应用。将锚杆和混凝土护坡相结合,约束滑动土体。是一种有效的加固措施。

(2)在利用灌浆锚杆加固边坡前,一定要做好边坡的地质勘探工作。摸清各岩层的性质和水文地质情况。

(3)由于工程地质条件、灌浆压力、施工技术等因素影响,加固施工质量应给与足够的重视。

参考文献

[1]建筑边坡工程技术规范(JGJ 120-99).中华人民共和国国家标准.北京:中国建筑工业出版社.

[2]郑颖人、陈祖煜等. 边坡与滑坡工程治理 [M].北京:人民交通出版社,2007

[3]罗贞海. 浅谈锚杆在边坡加固中的应用[J]. 福建建设科技,2010,06:15-16

中英文文献翻译

毕业设计(论文)外文参考文献及译文 英文题目Component-based Safety Computer of Railway Signal Interlocking System 中文题目模块化安全铁路信号计算机联锁系统 学院自动化与电气工程学院 专业自动控制 姓名葛彦宁 学号 200808746 指导教师贺清 2012年5月30日

Component-based Safety Computer of Railway Signal Interlocking System 1 Introduction Signal Interlocking System is the critical equipment which can guarantee traffic safety and enhance operational efficiency in railway transportation. For a long time, the core control computer adopts in interlocking system is the special customized high-grade safety computer, for example, the SIMIS of Siemens, the EI32 of Nippon Signal, and so on. Along with the rapid development of electronic technology, the customized safety computer is facing severe challenges, for instance, the high development costs, poor usability, weak expansibility and slow technology update. To overcome the flaws of the high-grade special customized computer, the U.S. Department of Defense has put forward the concept:we should adopt commercial standards to replace military norms and standards for meeting consumers’demand [1]. In the meantime, there are several explorations and practices about adopting open system architecture in avionics. The United Stated and Europe have do much research about utilizing cost-effective fault-tolerant computer to replace the dedicated computer in aerospace and other safety-critical fields. In recent years, it is gradually becoming a new trend that the utilization of standardized components in aerospace, industry, transportation and other safety-critical fields. 2 Railways signal interlocking system 2.1 Functions of signal interlocking system The basic function of signal interlocking system is to protect train safety by controlling signal equipments, such as switch points, signals and track units in a station, and it handles routes via a certain interlocking regulation. Since the birth of the railway transportation, signal interlocking system has gone through manual signal, mechanical signal, relay-based interlocking, and the modern computer-based Interlocking System. 2.2 Architecture of signal interlocking system Generally, the Interlocking System has a hierarchical structure. According to the function of equipments, the system can be divided to the function of equipments; the system

英文文献翻译

中等分辨率制备分离的 快速色谱技术 W. Clark Still,* Michael K a h n , and Abhijit Mitra Departm(7nt o/ Chemistry, Columbia Uniuersity,1Veu York, Neu; York 10027 ReceiLied January 26, 1978 我们希望找到一种简单的吸附色谱技术用于有机化合物的常规净化。这种技术是适于传统的有机物大规模制备分离,该技术需使用长柱色谱法。尽管这种技术得到的效果非常好,但是其需要消耗大量的时间,并且由于频带拖尾经常出现低复原率。当分离的样本剂量大于1或者2g时,这些问题显得更加突出。近年来,几种制备系统已经进行了改进,能将分离时间减少到1-3h,并允许各成分的分辨率ΔR f≥(使用薄层色谱分析进行分析)。在这些方法中,在我们的实验室中,媒介压力色谱法1和短柱色谱法2是最成功的。最近,我们发现一种可以将分离速度大幅度提升的技术,可用于反应产物的常规提纯,我们将这种技术称为急骤色谱法。虽然这种技术的分辨率只是中等(ΔR f≥),而且构建这个系统花费非常低,并且能在10-15min内分离重量在的样本。4 急骤色谱法是以空气压力驱动的混合介质压力以及短柱色谱法为基础,专门针对快速分离,介质压力以及短柱色谱已经进行了优化。优化实验是在一组标准条件5下进行的,优化实验使用苯甲醇作为样本,放在一个20mm*5in.的硅胶柱60内,使用Tracor 970紫外检测器监测圆柱的输出。分辨率通过持续时间(r)和峰宽(w,w/2)的比率进行测定的(Figure 1),结果如图2-4所示,图2-4分别放映分辨率随着硅胶颗粒大小、洗脱液流速和样本大小的变化。

文献翻译英文原文

https://www.sodocs.net/doc/2e9353949.html,/finance/company/consumer.html Consumer finance company The consumer finance division of the SG group of France has become highly active within India. They plan to offer finance for vehicles and two-wheelers to consumers, aiming to provide close to Rs. 400 billion in India in the next few years of its operations. The SG group is also dealing in stock broking, asset management, investment banking, private banking, information technology and business processing. SG group has ventured into the rapidly growing consumer credit market in India, and have plans to construct a headquarters at Kolkata. The AIG Group has been approved by the RBI to set up a non-banking finance company (NBFC). AIG seeks to introduce its consumer finance and asset management businesses in India. AIG Capital India plans to emphasize credit cards, mortgage financing, consumer durable financing and personal loans. Leading Indian and international concerns like the HSBC, Deutsche Bank, Goldman Sachs, Barclays and HDFC Bank are also waiting to be approved by the Reserve Bank of India to initiate similar operations. AIG is presently involved in insurance and financial services in more than one hundred countries. The affiliates of the AIG Group also provide retirement and asset management services all over the world. Many international companies have been looking at NBFC business because of the growing consumer finance market. Unlike foreign banks, there are no strictures on branch openings for the NBFCs. GE Consumer Finance is a section of General Electric. It is responsible for looking after the retail finance operations. GE Consumer Finance also governs the GE Capital Asia. Outside the United States, GE Consumer Finance performs its operations under the GE Money brand. GE Consumer Finance currently offers financial services in more than fifty countries. The company deals in credit cards, personal finance, mortgages and automobile solutions. It has a client base of more than 118 million customers throughout the world

人力资源管理外文文献翻译

文献信息: 文献标题:Challenges and opportunities affecting the future of human resource management(影响人力资源管理未来的挑战和机遇) 国外作者:Dianna L. Stone,Diana L. Deadrick 文献出处:《Human Resource Management Review》, 2015, 25(2):139-145 字数统计:英文3725单词,21193字符;中文6933汉字 外文文献: Challenges and opportunities affecting the future of human resource management Abstract Today, the field of Human Resource Management (HR) is experiencing numerous pressures for change. Shifts in the economy, globalization, domestic diversity, and technology have created new demands for organizations, and propelled the field in some completely new directions. However, we believe that these challenges also create numerous opportunities for HR and organizations as a whole. Thus, the primary purposes of this article are to examine some of the challenges and opportunities that should influence the future of HR. We also consider implications for future research and practice in the field. Keywords: Future of human resource management, Globalization, Knowledge economy Diversity, Technology 1.Change from a manufacturing to a service or knowledge economy One of the major challenges influencing the future of HR processes is the change from a manufacturing to a service or knowledgebased economy. This new economy is characterized by a decline in manufacturing and a growth in service or knowledge as the core of the economic base. A service economy can be defined as a system based on buying and selling of services or providing something for others (Oxford

旅游管理专业论文外文文献翻译

外文资料译文及原文 译文(一) 消费者体验旅游和品牌的结合 米契尔罗伯特 定义消费者体验旅游 制造工厂参观,公司博物馆和公司访客中心表现为被不同名字已知的观光事业片段:制造业观光事业,工业的吸引、工业的观光事业和工业的遗产观光事业。在每一个描述性的长期的共同目标是在消费者学习品牌,其运作,生产过程,历史和历史意义的时候建立一个消费者和品牌之间的纽带。有人建议在这里CET代表一个统一的主题的旅游。这个术语捕捉消费者的消费能力发现更多关于他们所消费的品牌,而制造商可以在与该工厂的客人接触的30-120分钟时间里建立与这些消费者更密切的关系。 参与的品牌 品牌经理寻求解决在三个层次消费者的需求: (1)功能(对消费者提供解决问题的办法); (2)符号(提供心理欲望满意度); (3)经历(提供感官快乐,品种,认知,刺激) CET可以通过视觉地介绍品牌,运作,生产工艺,历史和历史意义加强消费者和品牌之间的纽带。这种纽带可以被看作是个人品牌参与和品牌忠诚度的提高。认知参与反映了消费者对产品的兴趣(或学习更多)。CET可以通过刺激消费者对于品牌和生产过程的想象提高消费者的认知水平。此外,积极口碑沟通刺激满足旅客可能会比其他形式的促销更可信。 缺乏现有的直接研究关注 迄今为止,CET已经在行销文学中受到一点注意。米契尔和米契尔(2001年)对此内容这种的旅游网站进行了评估。此外,这些相同的作者已经评估食物和饮料工业中的现象(米契尔和米契尔,2000年),非营利部门(米契尔和米契尔,2001年b),和整体经济(米契尔等, 2001)。米契尔和米契尔(2002)为学者提出了格式,用来评估在当地的服务领域这些设施的地方利益。该主题通常包括对整合营销的简要讨论,但已收到直接研究的关注很有限。

计算机网络-外文文献-外文翻译-英文文献-新技术的计算机网络

New technique of the computer network Abstract The 21 century is an ages of the information economy, being the computer network technique of representative techniques this ages, will be at very fast speed develop soon in continuously creatively, and will go deep into the people's work, life and study. Therefore, control this technique and then seem to be more to deliver the importance. Now I mainly introduce the new technique of a few networks in actuality live of application. keywords Internet Network System Digital Certificates Grid Storage 1. Foreword Internet turns 36, still a work in progress Thirty-six years after computer scientists at UCLA linked two bulky computers using a 15-foot gray cable, testing a new way for exchanging data over networks, what would ultimately become the Internet remains a work in progress. University researchers are experimenting with ways to increase its capacity and speed. Programmers are trying to imbue Web pages with intelligence. And work is underway to re-engineer the network to reduce Spam (junk mail) and security troubles. All the while threats loom: Critics warn that commercial, legal and political pressures could hinder the types of innovations that made the Internet what it is today. Stephen Crocker and Vinton Cerf were among the graduate students who joined UCLA professor Len Klein rock in an engineering lab on Sept. 2, 1969, as bits of meaningless test data flowed silently between the two computers. By January, three other "nodes" joined the fledgling network.

客户关系管理外文文献翻译(2017)

XXX学院 毕业设计(论文)外文资料翻译 学院:计算机与软件工程学院 专业:计算机科学技术(软件工程方向) 姓名: 学号: 外文出处:GoyKakus.THE RESEARCH OFCUSTOMER RELATIONSHIP MANAGEMENT STRATEGY [J]. International Journal of Management Research & Review, 2017, 1(9): 624-635. 附件: 1.外文资料翻译译文;2.外文原文。 注:请将该封面与附件装订成册。

附件1:外文资料翻译译文 客户关系管理战略研究 Goy Kakus 摘要 客户关系管理解决方案,通过为你提供客户业务数据来帮助你提供客户想要的服务或产品,提供更好的客户服务、交叉销售和更有效的销售,达成交易,保留现有客户并更好地理解你的客户是谁。本文探讨了客户关系管理模型在获得、保持与发展策略方面的优势。然而,我们对其定义和意义还存在一些困惑。本文通过考察关系营销和其他学科方面的相关文献,解释了客户关系管理的概念基础,从而对客户关系管理的知识作出了贡献。 关键词:客户关系管理模型, 客户关系管理的博弈改变者与关键策略 引言 CRM 是客户关系管理的简称。它的特征在于公司与客户的沟通,无论是销售还是服务相关的。客户关系管理这一术语经常用来解释企业客户关系,客户关系管理系统也以同样的方式被用来处理商业联系, 赢得客户,达成合同和赢得销售。 客户关系管理通常被考虑作为一个业务策略,从而使企业能够: *了解客户 *通过更好的客户体验留住客户 *吸引新客户 *赢得新客户和达成合同 *提高盈利 *减少客户管理成本 *通过服务台等工具软件,电子邮件组织者和不同类型的企业应用程序,企业业务经常寻求个性化的在线体验。 设计精良的客户关系管理包括以下特征: 1.客户关系管理是一种以顾客为中心并以客户投入为基础的服务响应,一对一的解决客户的必需品, 买家和卖家服务中心直接在线互动,帮助客户解决他

旅游品牌定位外文翻译文献

旅游品牌定位外文翻译文献(文档含英文原文和中文翻译)

原文: Destination brand positions of a competitive set of near-home destinations Abstract: Although the branding literature commenced during the 1940s, the first publications related to destination branding did not emerge until half a century later. A review of 74 destination branding publications by 102 authors from the first 10 years of destination branding literature (1998–2007) found at least nine potential research gaps warranting attention by researchers. In particular, there has been a lack of research examining the extent to which brand positioning campaigns have been successful in enhancing brand equity in the manner intended in the brand identity. The purpose of this paper is to report the results of an investigation of brand equity tracking for a competitive set of destinations in Queensland, Australia between 2003 and 2007. A hierarchy of consumer-based brand equity (CBBE) provided an effective means to monitor destination brand positions over time. A key implication of the results was the finding that there was no change in brand positions for any of the five destinations over the four year period. This leads to the proposition that destination position change within a competitive set will only

英文文献及中文翻译

毕业设计说明书 英文文献及中文翻译 学院:专 2011年6月 电子与计算机科学技术软件工程

https://www.sodocs.net/doc/2e9353949.html, Overview https://www.sodocs.net/doc/2e9353949.html, is a unified Web development model that includes the services necessary for you to build enterprise-class Web applications with a minimum of https://www.sodocs.net/doc/2e9353949.html, is part of https://www.sodocs.net/doc/2e9353949.html, Framework,and when coding https://www.sodocs.net/doc/2e9353949.html, applications you have access to classes in https://www.sodocs.net/doc/2e9353949.html, Framework.You can code your applications in any language compatible with the common language runtime(CLR), including Microsoft Visual Basic and C#.These languages enable you to develop https://www.sodocs.net/doc/2e9353949.html, applications that benefit from the common language runtime,type safety, inheritance,and so on. If you want to try https://www.sodocs.net/doc/2e9353949.html,,you can install Visual Web Developer Express using the Microsoft Web Platform Installer,which is a free tool that makes it simple to download,install,and service components of the Microsoft Web Platform.These components include Visual Web Developer Express,Internet Information Services (IIS),SQL Server Express,and https://www.sodocs.net/doc/2e9353949.html, Framework.All of these are tools that you use to create https://www.sodocs.net/doc/2e9353949.html, Web applications.You can also use the Microsoft Web Platform Installer to install open-source https://www.sodocs.net/doc/2e9353949.html, and PHP Web applications. Visual Web Developer Visual Web Developer is a full-featured development environment for creating https://www.sodocs.net/doc/2e9353949.html, Web applications.Visual Web Developer provides an ideal environment in which to build Web sites and then publish them to a hosting https://www.sodocs.net/doc/2e9353949.html,ing the development tools in Visual Web Developer,you can develop https://www.sodocs.net/doc/2e9353949.html, Web pages on your own computer.Visual Web Developer includes a local Web server that provides all the features you need to test and debug https://www.sodocs.net/doc/2e9353949.html, Web pages,without requiring Internet Information Services(IIS)to be installed. Visual Web Developer provides an ideal environment in which to build Web sites and then publish them to a hosting https://www.sodocs.net/doc/2e9353949.html,ing the development tools in Visual Web Developer,you can develop https://www.sodocs.net/doc/2e9353949.html, Web pages on your own computer.

变电站_外文翻译_外文文献_英文文献_变电站的综合概述

英文翻译 A comprehensive overview of substations Along with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it also increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people. The substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life. Electric power industry is one of the foundations of national industry and national economic development to industry, it is a coal, oil, natural gas, hydropower, nuclear power, wind power and other energy conversion into electrical energy of the secondary energy industry, it for the other departments of the national economy fast and stable development of the provision of adequate power, and its level of development is a reflection of the country's economic development an important indicator of the level. As the power in the industry and the importance of the national economy, electricity transmission and distribution of electric energy used in these areas is an indispensable component.。Therefore, power transmission and distribution is critical. Substation is to enable superior power plant power plants or power after adjustments to the lower load of books is an important part of power transmission. Operation of its functions, the capacity of a direct impact on the size of the lower load power, thereby affecting the industrial production and power consumption.Substation system if a link failure, the system will protect the part of action. May result in power outages and so on, to the production and living a great disadvantage. Therefore, the substation in the electric power system for the protection of electricity reliability,

仪表板外文文献翻译、中英文翻译、外文翻译

Dashboard From Wikipedia, the free encyclopedia This article is about a control panel placed in the front of the car. For other uses, see Dashboard (disambiguation). The dashboard of a Bentley Continental GTC car A dashboard (also called dash, instrument panel (IP), or fascia) is a control panel located directly ahead of a vehicle's driver, displaying instrumentation and controls for the vehicle's operation. Contents 1.Etymology 2.Dashboard features 3.Padding and safety 4.Fashion in instrumentation 5.See also 6.References Etymology Horse-drawn carriage dashboard Originally, the word dashboard applied to a barrier of wood or leather fixed at the front of a horse-drawn carriage or sleigh to protect the driver from mud or other debris "dashed up" (thrown up) by the horses' hooves.[1] Commonly these boards did not perform any additional function other than providing a convenient handhold for ascending into the driver's seat, or a small clip with which to secure the reins when not in use. When the first "horseless carriages" were constructed in the late 19th century, with engines mounted beneath the driver such as the Daimler Stahlradwagen, the simple dashboard was retained to protect occupants from debris thrown up by the cars' front wheels. However, as car design evolved to position the motor in front of the driver, the dashboard became a panel that protected vehicle occupants from the heat and oil of the engine. With gradually increasing mechanical complexity, this panel formed a convenient location for the placement of gauges and minor controls, and from this evolved the modern instrument panel,

工商管理专业外文文献翻译

Project Budget Monitor and Control Author:Yin Guo-li Nationality:American Derivation:Management Science and Engineering.Montreal: Mar 20, 2010 . With the marketing competitiveness growing, it is more and more critical in budget control of each project. This paper discusses that in the construction phase, how can a project manager be successful in budget control. There are many methods discussed in this paper, it reveals that to be successful, the project manager must concern all this methods. 1. INTRODUCTION The survey shows that most projects encounter cost over-runs (Williams Ackermann, Eden, 2002,pl92). According to Wright (1997)'s research, a good rule of thumb is to add a minimum of 50% to the first estimate of the budget (Gardiner and Stewart, 1998, p251). It indicates that project is very complex and full of challenge. Many unexpected issues will lead the project cost over-runs. Therefore, many technologies and methods are developed for successful monitoring and control to lead the project to success. In this article, we will discuss in the construction phase, how can a project manager to be successful budget control. 2. THE CONCEPT AND THE PURPOSE OF PROJECT CONTROL AND MONITOR Erel and Raz (2000) state that the project control cycle consists of measuring the status of the project, comparing to the plan, analysis of the deviations, and implementing any appropriate corrective actions. When a project reach the construction phase, monitor and control is critical to deliver the project success. Project monitoring exists to establish the need to take corrective action, whilst there is still time to take action. Through monitoring the activities, the project team can analyze the deviations and decide what to do and actually do it. The purpose of monitor and control is to support the implementation of corrective actions, ensure projects stay on target or get project back on target once it has gone off target。

相关主题