搜档网
当前位置:搜档网 › 室内分布系统介绍和设计方案探讨

室内分布系统介绍和设计方案探讨

室内分布系统介绍和设计方案探讨
室内分布系统介绍和设计方案探讨

室内分布系统介绍和设计方案探讨摘要基于室内分布系统的发展现状、应用前景、组网分析,探讨室内分布系统的规划设计,针对不同的应用场景采用不同的组网设计方式,快速灵活的实现室内无线信号的良好覆盖。

关键词室内分布系统;组成器件;组网设计原则和方法

中图分类号tu2 文献标识码a 文章编号 1674-6708(2011)54-0073-02

discussion on indoor rf distribution application and designing bases on the current situation and different modes yang shao-wen

shandong p&t planning and designing institute

co.,ltd,qingdao, shandong 266071,china

abstract it analyzes the current situation,application,network of indoor rf distribution, including different component. discussion on the designing methods of indoor rf distribution, the path loss about the rf signal transmissionin free space and passive component , so the indoor rf signal can be quickly implemented.

keywords indoor rf distribution;passive component;application; designing;

1概述

移动室内分布系统设计原则

移动室内分布系统 设计原则和建设指导意见 (内部培训版) 目录 目录 (1) 一、适用范围及背景 (1) 二、室内分布系统建设总体原则 (1) 三、室分覆盖建设规划思路 (1)

四、信源建设指导原则 (2) 五、室内分布系统网络指标要求 (4) 六、室内分布系统设计原则 (5) 七、室内覆盖注意事项 (8) 八、室内外协调规划应用 (8) 九、深度覆盖解决方案: (9) 十、小区覆盖整理附表及案例: (13)

一、适用范围及背景 随着社会经济的高速发展,豪华宾馆、大型商业中心、高档公寓、地铁、地下车库等大量涌现,使手机在室内的使用频率日益增加;由此室内分布系统在未来发展的重要性逐渐体现,规范的设计方案及建设思路尤为重要。本方案适合中国移动室分系统规划及设计、建设人员站点勘查及方案设计使用。 二、室内分布系统建设总体原则 1、室内分布建设应面向于解决客户投诉、弱覆区域、话务吸收、竞争对手对比、经济效益显 著等重点目标市场,满足业务发展的需求。 2、室内分布系统建设应考虑GSM90O DCS18O0TD-SCDMAWLA多网合一的需求。 3、室内分布系统建设是优化网络最重要和最主要的解决方案。室内分布系统应从网络覆盖、网 络容量、网络质量三方面提升网络,是运营商获取竞争优势的关键因素,从根本上体现了无线通信网络的服务水平。 4、建设室内分布系统的物业点应能保证优质的室内覆盖,控制好室内信号,避 免对室外构成强干扰;同时做好室内外小区平滑切换关系? 5、室内分布系统建设应保证扩容的便利性,做到在不改变分布系统架构的情况下,通过增加载 波及小区分裂等方式快速扩容,满足业务需求。 6分布系统建设应考虑多系统间的干扰,注意各营运商系统间天线的隔离度问题。 7、室内分布系统应按照“多天线、小功率”的原则进行建设,电磁辐射必须满足国家和通信行 业相关标准。 三、室分覆盖建设规划思路 室分覆盖建设规划的主要目的是满足市场需求、提升用户感知。但是有限的 资源投资和基站价值制约了室内分布系统的建设,充分利用现有资源,采用室外 宏站和室内覆盖整体规划,加深网络覆盖的深度。拟室内覆盖建设站点选取优先级和覆盖方式如下表。

室内装饰设计说明范本

装饰工程设计施工说明 一、设计依据 1.本工程的建设主管单位对本工程装饰装修方案设计的设计要求; 2.本工程建筑设计施工图,包括建筑、结构、水、电、暖能等专业 的施工图; 3.与本装饰装修工程相关的建筑设计规范; 5.装饰装修工程设计应执行的主要规范、标准: (1)《建筑内部装修设计防火规范》(GB50222-95) (2)《建筑设计防火规范》(GBJ16-87) (3)《民用建筑隔声设计规范》(GBJ118-88) (4)《建筑照明设计标准》(GB50034-2004) (5)《民用建筑工程室内环境污染控制规范》(GB50325-2001) (6)《公共建筑节能设计标准》(GB50189-2005) (7)《建筑装饰装修工程质量验收规范》(GB50210-2001) (8)《建筑内部装修防火施工及验收规范》(GB50354-2005) (9)相关行业与地方的相关规定。 二、工程概述及设计内容 1、项目名称:办公室改造 2、建筑面积: 320㎡ 3、设计范围:地面工程、墙体工程、顶面工程、配电系统 三、装饰施工说明 本设计图标尺寸以毫米(MM)为单位,标高以(M)为单位。

第一部分地面工程 1.木地板地面:找平+地板结合层+木地板+面层清洁处理 2.防滑地砖地面:找平+1:3水泥砂浆+防滑地砖+面层清理 3.卫生间原地面作防水处理。 第二部分墙面及抹灰 1.办公室墙:局部铲除原墙面破损、开裂等影响施工部位,并挂网, 石膏找平,腻子找平,打底,刷立邦环保乳胶漆二遍。 第三部分新建墙体 1.石膏板墙:95系列轻钢龙骨9MM石膏板到走廊顶。并在自攻钉上涂抹防锈漆,批刮腻子,刷立邦环保乳胶漆二遍。 2.卫生间砖墙:轻体砖墙,加砌块墙涉及无装修做法时,一律打底,刷面,刷立邦防水乳胶漆二遍。 第四部分天棚工程 1、石膏板天棚:轻钢龙骨12MM石膏板。留出检修口与喷淋头口。 并在自攻钉上涂抹防锈漆,批刮腻子,刷立邦环保乳胶漆。 第五部分其它木装修 1.木门做法:原有木门拆下并加工出离地高度,为铺木地板做准 备。 第六部分防火要求 本工程为一类建筑,按一级耐火等级进行设计,在遵照原建筑设计的各项防火措施的前提下并遵照GB50222-95规范[建筑内部装修消防]的精神进行实施所用主要材料耐火等级要求如下。

室内分布系统施工及验收规范

中国铁塔股份有限公司 室内分布系统施工及验收规范 (试行) 2015-1-12发布2015-1-12实施中国铁塔股份有限公司发布

目录 目录 (1) 前言 (3) 1 总则 (4) 2 验收原则及范围 (4) 2.1验收原则和依据 (4) 2.2验收内容和范围 (5) 3 系统组成 (5) 3.1室内覆盖系统组成 (5) 3.2多系统合路 (6) 4 工程验收前检查 (6) 4.1环境检查 (6) 4.2设备及器材检查 (6) 5 施工要求 (7) 5.1电缆走道(或槽道)安装 (7) 5.2线缆布放 (7) 5.3泄漏电缆布放 (9) 5.4光纤布放 (9) 5.5电源检查 (10) 5.6防雷接地 (11) 5.7有源器件安装 (12) 5.8无源器件安装 (13) 5.10GPS天馈线安装 (14) 5.11标签 (15) 6 工程初验 (16) 6.1初验要求 (16) 6.2信号源设备检查测试 (17) 6.3室内分布系统检查测试 (17) 6.4各系统性能指标测试 (18) 6.5初验资料移交 (25) 7 工程终验 (25) 7.1竣工技术文件 (25) 7.2验收要求 (26) 8 附件 (26) 8.1安装电缆走道(或槽道)检验表 (27) 8.2线缆布放检验表 (28)

8.3有源器件安装检验表 (32) 8.4无源器件安装检验表 (33) 8.5天线安装检验表 (34) 8.6GPS天馈系统安装检验表 (36) 8.7标签检验项目表 (37)

前言 本规范的编制目的是通过标准化验收要求,满足室内分布系统网络建设和工程验收的需要,规范验收流程和验收内容,特制订本规范。 本规范明确了通信室内分布系统网络建设和工程验收的内容: ?验收的原则及依据 ?验收的内容及范围 ?室内分布系统的组成及各分部工程的建设和验收 本规范由中国铁塔股份有限公司建设维护部提出并归口。 本规范起草单位: 中国铁塔股份有限公司建设维护部、研发中心、北京分公司 广东达安项目管理股份有限公司 广东省电信规划设计院有限公司

综合室内分布系统设计

WCDMA综合室内分布系统设计 1、前言 3G的魅力在于高速数据与多媒体业务,而视频电话、视频流、游戏等高速数据业务一般都发生在舒适的室内环境中,这些业务功能都需要较大的系统容量和良好的网络质量。3 G时代60%-70%的数据业务将发生在室内,如欧美国家和中国香港地区的统计显示室内移动电话话务量约占总话务量的1/3;日本NTT DoCoMo的调查发现3G用户的室内使用量占到了70%,而室外使用量只有30%。解决室内覆盖的主要方法是建设室内覆盖分布系统,室内分布系统的基本原理是将室外信号通过有线方式引入到室内,再通过小型天线将信号发送出去,从而提高室内覆盖水平。3G时代建设室内分布系统目的不仅仅是为了解决建筑物内部的信号盲区、弱区,解决建筑物内部信号杂乱造成的通话质量差,分担室内话务量改善网络拥塞,也是企业战略发展的需要。WCDMA是3G三大主流技术之一,WCDMA室内分布系统的建设将是未来的一个热点,本文将重点探讨室内分布系统的设计问题。 射频综合室内分布系统主要包括信号源、天馈信号分布系统。由于CDMA制式是自干扰系统,所以室内外系统规划、设计与2G系统有很大不同。对于WCDMA系统,室外宏蜂窝主要是下行容量受限即功率受限。而室内分布系统则是上行容量受限,其主要原因有两点。一是WCDMA室外宏基站基本为一发二收,可以有效提高上行接收灵敏度,而室内分布系统无接收分集导致上行受限;二是室内过多的天线也导致干扰增大,影响了系统容量。 下面针对室内分布系统建设中的几个主要问题进行具体分析。 2、链路预算 在进行链路预算时,首先是链路模型的选择,室内传播模型主要有以下5种:衰减因子模型、Motley经验公式、对数距离路径损耗模型、Ericsson多重断点模型及射线跟踪模型。

中国移动室内分布系统安装技术规范

1、主机安装 1.1、主机安装位置要求 1.1.1安装位置必须保证无强电、强磁和强腐蚀性设备的干扰; 1.1.2主机安装场所应干燥、灰尘小、且通风良好; 1.1.3主机安装位置便于馈线、电源线、地线的布线; 1.1.4主机尽量安装在室内。安装主机的室内不得放置易燃品;室内温度、湿度不能超过主机工作温度、湿度的范围; 1.1.5主机挂壁式安装时,主机底部距离地面为1米以上,在移动机房、交换机房等特殊机房内安装时,主机底部或顶部应与其它原有壁挂设备底部或顶端保持在同一水平线上; 1.1.6主机落地式安装时,龙门架底座或主机座应与墙壁距离0.8米,在移动机房、交换机房等特殊专用设备机房内安装时,应与原有设备保持整体协调。 1.1.7设备在条件允许的情况下尽量安装在室内。对于室外安装的主机,必须做好防雨、防水处理,以防止雨水溅湿机箱体底部,同时做好主设备的防晒、防破坏的措施;必须保证主设备便于调试、维护和散热需要; 1.2、主机的架设安装 1.2.1主机安装步骤参照使用说明书和设计方案进行; 1.2.2立式或挂式机柜的安装位置、排列顺序均应符合设计要求。机柜或机箱的安装必须垂直、牢固稳定,加固应符合设计的抗震要求; 1.2.3立式机柜与同列机架应成一条直线,无明显参差不齐,整列机架允许偏差为10mm;机柜的安装垂直度应满足上、下偏差不大于机柜高度的千分之一; 1.2.4挂式机柜的承载体必须坚固(如:建筑承重墙、柱等),具备长期稳定性;安装完毕后不得有影响美观的明显几何偏差。 1.2.5主机、分机的跳接馈线、电源线、地线均置于100X60mm的线槽内走线。1.2.6主机接地排安装于主机下方,距地面150mm-200mm紧靠垂直线槽水平固定; 1.2.7所有线头标签均距线槽10mm贴于馈线、地线、电源线上,标签字体朝上;1.2.8主机保护地、室内馈线接地,分别用16mm2地线引至主机下端接地排上,再用35mm2地线从接地排引至地网; 2、天线安装 2.1天线安装的位置,俯、仰角必须符合设计方案。 2.2天线的安装应美观、牢固,与周围墙体和天花板协调,并且不能损毁周围墙体、天花板和其它设施; 2.3安装时应带手套,禁止安装后天线上存在污迹; 2.4室内天线布放时尽量注意金属结构和墙体结构对信号的影响,选择合适的位置;2.5吸顶天线安装过程中应将天线保持与地面垂直; 2.6天线安装完毕后,应对每一处天线所处的位置做详细的标识; 3、附件(功分器、耦合器等)安装 3.1附件是指功分器、耦合器及配电箱、电表、电源插座、电源保护开关、接地排等。 3.2功分器等小无源射频器件尽量妥善安置在线槽或弱电井中,无线槽和弱电井时,要

WCDMA移动通信室内分布系统毕业设计

WCDMA移动通信室分布系统毕业设计 目录 摘要.............................................................. I 第1章绪论 (1) 1.1本文研究的背景 (1) 第2章室分布概述 (3) 2.1室分布原理 (3) 2.1.1室分布的概念 (3) 2.1.2室分布的方式 (4) 2.1.3 WCDMA与GSM室分布的区别 (5) 2.2室分布的问题 (6) 2.2.1分布方面的问题 (6) 2.2.2量方面的问题 (6) 2.2.3容量方面的问题 (6) 2.3室分布引入 (7) 第3章室分布系统设计 (8) 3.1室分布的任务 (8) 3.2站点勘测 (8) 3.2.1测试工具配置 (9) 3.2.2站点勘测基本要求 (9)

3.2.3地理环境的勘测 (9) 3.2.4无线环境的勘测 (9) 3.2.5施工环境(条件)的勘测 (11) 3.2.6勘测资料整理 (12) 3.3室分布系统的信号源的选取 (12) 3.4室分布系统组网 (15) 3.4.1室分布系统的预留问题 (16) 3.4.2多系统共用信号分布系统组网 (16) 第4章 WCDMA无线网络优化流程和方法 (18) 4.1WCDMA系统的网络优化概述 (18) 4.2网络优化的发展 (18) 4.3网络优化的分类 (19) 4.3.1工程优化 (19) 4.3.2运维优化 (20) 4.4网络优化的通常流程 (21) 4.5网络优化的方法 (22) 4.5.1网络优化方法 (22) 4.5.2网络优化容 (23) 总结 (26) 致谢 (27) 参考文献 (28)

室内设计方案

室内设计方案 导读:本文是关于室内设计方案,希望能帮助到您! 室内设计方案 方法一:体验生活。把体验生活放在第一位,意味着对生活的理解和热爱,以及平日里对生活的细致观察和思考应是每一位设计师成功的第一基本要素。一个好的室内设计能充分体现出设计师对生活的每一份用心与其所具有的人生阅历。无法想象一位从不下厨,不懂油盐酱醋、锅碗瓢盆放在何处,不知道煮妇们如何操作的设计师能设计出一个合理实用的厨房来。设计书拿到手,第一步应是尽力搜集有关的信息,充分了解使用者对设计的所有要求,充分了解每一个空间的用途以及它们的关联,方可进行下一步。可训练自己闭上眼睛,从进大门开始,象放电影一样,缓缓掠过每一间房子。经过长期的生活观察与体验,那些家具和饰品会自然出现在你脑中空间应有的位置。任何艺术都讲究取源于生活,还原于生活,为什么室内设计就可以例外呢。 方法二:角色互换,指的是站在顾客的角度,处处为顾客着想。这不是一句挂在嘴边的漂亮话,也不是印在纸上的一句广告词,而是实实在在从顾客的角度来进行设计。也就是说,如果我是使用者,我会如何来设计我自己的房子。合理安排好每一分钱,将钱用在刀刃上。认真分析需要考虑的因素,如经济能力、生活方式、个人喜好、家庭成员等等,按其重要性综合考虑。一个没有责任心和职业道德的设计师自然无法赢得顾客的信任与尊重,

也不可能做出真正好的室内设计来,这应作为每一位设计师成功的第二基本要素。 方法三:追求平衡。中国自古以来有着传统的平衡艺术,例如中国国画及书法中常用到的在非平衡构图中追求平衡的美,这一美的原则古今中外无一例外。只是落实到了室内设计中,许多设计师容易忘却这一原则。平衡设计中包含了形体平衡和色彩平衡。在设计时,从不同角度观察是否有失平衡,初学者可用手比划个方框,透过它来审视每一个角度。平衡点往往是那精彩的点睛之笔,有人称之为视觉焦点,不可没有,但决不可过多。平衡的原则直接左右着整体布局,决定着每一件家具和饰品的安排。 方法四:寻求对比。对比法主要有以下四类:虚实对比- 虚的空间与实的墙体或者家具之对比;色彩对比–互补色之对比;质感对比–玻璃与砖块、金属与木材、麻布与皮革之对比;形体对比–方形与圆形、直线与曲线之对比。在应用时,注意不同材质的接触、过渡要把握得恰到好处;尽量不要在同一平面上硬碰硬;不要让不同金属材质直接接触;要避免同等尺度的对比。在统一的前提下,善于制造和利用对比,是评判一位优秀设计师水平的标准之一。 方法五:留白,中国国画及书法中最常见到的艺术手法之一,但现在中国室内设计中已较难见到了。熟练掌握留白技艺是评判一位优秀室内设计师的标准之一,具体应用时说来简单做来难。在设计时,在满足功能的前提下,尽量不要做得太满,要留有余地和空白,该省略的地方就要大胆地省略,该简化的地方就要勇

室分勘察设计规范

室分勘察设计规范 一、室分勘察要求 设计人员应与施工单位共同上站开展勘察工作,根据现场环境确定可行得设计方案。施工单位应提出意见供设计人员参考。主要包括业主禁止施工得范围、业主禁止得施工方式、从施工得角度来瞧哪些区域就是无法实现或很难实现得等对设计方案得建议与特殊要求,从而在设计方案层面上选择更加合理得方案,避免重复修改延误工期。勘察得要点如下: 1、建筑环境勘测 1)覆盖站点得地理位置,经纬度等信息; 2)建筑楼宇高度、层数、建筑总面积; 3)需要覆盖区域面积描述; 4)对建筑物进行功能结构分割与描述; 5)要求提供建筑设计平面图。 2、建筑物内部结构勘测 1)了解建筑物主体结构材质及内部环境与装修情况、用途等,初 步确定天线覆盖半径与天线安装位置;根据用途不同合理调整天线密度。 2)天花板上部结构,能否穿线缆,确定馈线布放路由;天花板检

修口就是否满足施工需求,需开检修口区域按照现场记取实际数量。 3)对于过墙馈线需打孔得现场勘查清楚记取实际数量;特殊情况 需提前在可研报告内说明。 4)弱电井位置与数量、走线位置得空余空间; 5)电梯间位置与数量,电梯间缆线进出口位置; 6)电梯间共井情况、停靠区间、通达楼层高度及用途; 7)机房位置与主设备安装位置确定; 8)主设备引电情况得调查; 3、电磁环境勘测 1)建筑物现有覆盖情况;相邻小区载频号、电平值; 2)乒乓效应区域; 3)盲区范围; 4)根据现有无线环境判断就是否存在各运营商系统之间得干扰 等。 4、无线环境测试路由要求 1)沿楼宇外边缘; 2)沿楼层中部走廊; 3)楼梯、电梯口; 4)根据大楼结构判断可能得弱信号区

室内无线网络覆盖的设计【毕业论文,绝对精品】

安徽邮电职业技术学院毕业设计(论文)题目:室内无线网络覆盖的设计姓名:学号:专业:指导教师:2011 年3 月18 日目录摘要...........................................................- 3 -Abstract........................................................- 4 -第一章:室内无线网络覆盖的意义与基本原理........................- 5 - 1.1 室内无线覆盖的重要意义..................................- 5 - 1.2 室内分布的组网分类......................................- 6 - 1.3 室内分布系统根据传输媒介................................- 7 -第二章:室内无线网络覆盖的设计方案..............................- 9 - 2.1 室内无线网络覆盖系统要达到的目的........................- 9 - 2.2 室内无线网络覆盖的设计思路..............................- 9 -第三章:室内无线网络覆盖系统的故障分类以及处理办法.............- 12 - 3.1 室内无线网络覆盖故障分类与分析流程.....................- 12 - 3.2 设备故障分析及实例.....................................- 12 - 3.3 天馈故障分析及实例.....................................- 13 - 3.4 故障处理工具...........................................- 14 -第四章:室内无线网络覆盖的创新与前景...........................- 16 - 4.1 3G 室内覆盖重要性提升...................................- 16 - 4.2 2G、3G 室内无线网络覆盖着眼点有不同.....................- 16 - 4.3 3G 网络室内室外要协同...................................- 17 - 摘要 室内无线网络覆盖,特别是高层楼宇,复杂建筑群的室内无线网络覆盖一直是网络优化的难点。大型建筑物对电磁波有着很强的屏蔽作用,在其低层和地下室、电梯等环境下,信号很弱以至于没有信号,成为移动通信的盲区和阴影区。而在较高楼层,由于容易收到来自周围不同基站的信号,造成信号混杂,切换频繁,严重影响通话质量。另外对于有些建筑物,虽然能够正常通话,但是由于用户密度大,基站支持用户数目有限,通话阻塞率很高。而专家估计,大约70的移动通信业务量是发生在室内的,由此可见室内无线网络覆盖的重要性!本文主要介绍了室内无线网络覆盖原理,为研究室内无线网络覆盖提供了坚实的理论基础;同时提出了有效的解决室内无线网络覆盖的方案,对实际问题的解决有巨大的帮助。关键词:室内无线网络覆盖、通话质量、原理、设计Abstract Indoor wireless network coverage especially in high-rise buildingscomplex buildings for indoor wireless coverage network optimization hasbeen difficult. Large buildings have a strong electromagnetic waveshielding effect in its lower and basements elevators and othercircumstances the signal is weak so that no signal a mobilecommunication blind spots and shadow areas. In the upper floors aslikely to receive signals from different base stations around resulting inmixed signals switching frequency seriously affecting call quality. Inaddition to some buildings while the normal call but because the userdensity the base station to support a limited number of users the callblocking rate is high. And by some estimates about 70 of the mobilecommunication business volume is in the room we can see theimportance of indoor wireless coverage This paper describes theprinciples of indoor wireless coverage for the study of indoor wirelesscoverage provides a solid theoretical basis also put forward an effectivesolution for indoor wireless coverage solutions the solution of practicalproblems are a tremendous help.KEY WORDS:indoor wireless network coverage call quality principledesign 第一章:室内无线网络覆盖的意义与基本原理1.1 室内无线覆盖的重要意义现代都市中建筑物越来越高、越来越多、越来越密集,移动通信的无线电信号在其间受到阻挡而衰减,另外现代建筑多以钢筋混凝土

室内方案设计说明

室内方案设计说明 随着生活质量不断提高,人们对赖以生存的环境开始重新考虑,并由此提出了更高层次的要求。持别是生活水平和文化素质的提高和住宅条件的改善,下面是小编为大家整理的资料,欢迎阅读哦。 室内方案设计说明本户型属于中等户型,对象为收入水平一般偏高的工薪阶层。忙忙碌碌的一天之后,回到自己温馨的小家总是寻找一个安静的角落享受家庭生活的温馨,空间不大,但是还是能让人找到家的感觉。 城市的五颜六色的生活迷惑了我们的眼睛,让我们在偌大的城市迷失了方向,只有那么一个安静的角落属于我们,那就是我们的家。房间的室内以简约为主,但处处透露出家的温馨。 本方案是围绕现代简约为主题,适合于30岁左右的四口之家居住,再加上现代时尚的设计元素在里面。相互结合,相交融。以简洁明快的设计风格为主调,简洁和实用是现代简约风格的基本特点。 简约风格已经大行其道几年了,仍然保持很猛的势头,这是因为人们装修时总希望在经济、实用、舒适的同时,体现一定的文化品味。而简约风格不仅注重居室的实用性,而且还体现出了现代社会生活的精致与个性,符合现代人的生活品位。

全面考虑,在总体布局上方面尽量满足业主生活的需求,主要装修材料以白橡木,陶瓷为主,以白橡木的优美含蓄,陶瓷的朴素大方来装饰墙面的景点。更体现现代简约的之感。创造一个温馨,健康的家庭环境。 此案为二厅三卧二卫,客厅与餐厅南北互通,向南处有客厅和两个卧室,通风采光好,户型方正,结构合理,空间高,是一套不可多得的经典户型。 在功能方面,客厅是主任品味的象征,体现了主人品格,地位,也是交友娱乐的场合,电视背景墙采用石膏板做的四个几何造型,既简单又大方,再加上色彩为金黄色的金属材料,配上顶部照下来的灯光,整个电视背景墙把客厅提升起来。 与电视背景相对的一面特意设计了展示柜,展示柜采用乳白色,使浅橘色为主的客厅显得活泼生动,更通过突出饰品自身的魅力展示主人的富足和品位;沙发背景墙只做了简单的处理,用细木工板贴上黑色的亚克力板,做了一个悬挂的台面,上面可以放装饰画等,一些装饰品非常实用。电视背景墙的层次以及精致的沙发、欧式的茶几、个性化的台灯,足以把简约时尚和人性化舒适感融合起来。 餐厅是家居生活的心脏,不仅要美观,更重要的实用性,整体性。设计没有改变原空间结构,而以长长的落地珠帘将这种风格进行渲染,并在餐厅顶部设计圆形的彩绘玻璃吊

微蜂窝及室内分布系统工程施工安装规范

微蜂窝及室内分布系统工程施工安装规范 1为保证室内分布系统工程的施工质量,明确工程质量监查的技术规范,特制定本施工规范。 2本规范既是进行工程管理与工程施工的技术指导标准,又是工程质量监理部门对室内覆盖工程进行质量检查的依据。 3为保证系统能够可靠运行,必须严格按照本规范及相关作业指导书进行施工。 1主机安装: 1.1 安装位置要求: 1.1.1安装位置必须保证无强电、强磁和强腐蚀性设备的干扰; 1.1.2主机安装场所应干燥、灰尘小、且通风良好; 1.1.3所有用电设备不得安装在管井口下方,主设备上方安装有喷淋头的必须拆除。 1.1.4主设备上方有空调、供水等管路不能拆除时,需要做防水棚防止滴漏。 1.1.5主机安装位置便于馈线、电源线、地线的布线; 1.1.6机房内地线排必须安装合格母地线,母地线必须有良好可靠接地。地线排上所有地线要有标签。 1.1.7主机安装在室内。安装主机的室内不得放置易燃品;室内温度、 湿度不能超过主机工作温度、湿度的范围; 1.1.8主机挂壁式安装时,主机底部距离地面为1米,在移动机房、交 换机房等特殊机房内安装时,主机底部或顶部应与其它原有壁挂设备底部或顶端保持在一水平线上; 1.1.9主机落地式安装时,龙门架底座或主机座应与墙壁距离0.8米, 在移动机房、交换机房等特殊专用设备机房内安装时,应与原有设备保持整体协调。 1.1.10主机安装在有防静电地板的房间内,应该先制作与防静电地板 等高的增高架,先将增高架牢固固定在地板下面,再将主机安装在增高架

上面。不允许直接安装在防静电地板上面,也不允许机架落地安装。 1.1.11微蜂窝机房内主机需加装空调挡板时,由分布厂商负责安装; 如微蜂窝机房内需做隔断,由负责安装主设备的施工单位负责,根据石棉瓦、门窗、面积等做预算,报给建设单位和监理方。 1.1.12主设备安装及传输、光缆安装在分布工程施工期限间优先进行, 室分厂家负责协调业主和各相关方面,按计划施工。机房必须安装电表,电表由安装主设备的施工单位负责。且电表安装位置要便于查看,所有联通设备不允许表外接电。 1.1.13 主机安装时工作人员应配戴干净手套,以保证设备表面的清洁。 1.1.14为避免重复计费,机房电表、电源线、地线排、地线不列入室 分材料,应在主机安装材料中计费。 1.1.15机房施工垃圾必须每日清理,保持机房整洁。 2 天线部分的安装 2.1 天线架安装: 2.1.1各类型天线支架应结实牢固,支掌杆要垂直,横担要水平,安装 位置要符合设计方案; 2.2 天线安装: 2.2.1各类型天线安装详见天线安装使用说明书,天线选用依据设计方案; 2.2.2电梯内板状天线必须使用专用支架安装。发射方向必须垂直向下, 不得倾斜安装。 2.2.3电梯井道内轿厢与井壁间隙较小不能够安装板状天线时,需经监 理确认,报设计院变更设计,方可改装对数周期天线。 2.2.4电梯井道内馈线卡间距在1.5—2.0米之间,井道内所有器件安装 要牢固、可靠。 2.2.5所有天线必须牢固地安装在其支撑架上或建筑物天花板下,安装 位置符合设计方案; 2.2.6室内天线外露安装时,必须戴干净手套操作,保证天线美观且 不破坏整体 环境;天线暗装时,必须提前通知监理,以便到现场检查。

通信网络室内分布系统设计方案

住宅区A区 通信网络室内分布系统设计方案

住宅区a区位于济南市,该小区包含4栋住宅楼(1号楼、2号楼、3号楼、4号楼)和1栋公寓楼。其中1、2、3、4号楼地上30层,地下2层;公寓楼地上28层,地下2层;以上楼宇地上均为住宅、地下为储藏室和车库,内建有电梯17部(7、8、9、10号楼各有3部电梯,运行区间:B2F~30F;公寓楼共有5部电梯,3部运行区间:B1F~28F、2部运行区间:B2F~28F),建筑面积125000平方米。 经测试,住宅区a区1号~10号楼楼层信号良好,可以正常通话;电梯及B1F、B2F储藏室、车库和公寓楼信号很弱,基本属盲区状态,通信企业用户无法正常通话,为进一步优化网络,提高通信质量,满足用户需求,吸收楼宇内部的话务量,同时 应通信企业公司的要求,本方案对住宅区a区1号~10号楼B1F及B2F储藏室、车库和公寓楼全楼进行信号覆盖。 1.1电磁环境 住宅区a区由于其自身的结构导致电梯内信号较差,属盲区状态,通信企业用户无法正常通话,为改善其内部通信企业网络信号覆盖质量和强度,同时与周围形 成良好的网络环境,对该建筑内进行通信网络信号测试,分析内部的网络环境,确 定周围的基站分布,为建设室内分布系统提供完善依据。 住宅区a区1号~10号楼楼层信号良好,信号强度约在-65~77dBm之间,主导频Ec/Io一般在-3~-5dB之间,可以正常通话;B1F、B2F储藏室、车库和公寓楼 内信号约在-99~-107dBm之间,有些区域为信号盲区,需增强信号强度。 电梯内为信号弱区,通话质量很差。

1.2覆盖方式与覆盖范围 1.2.1通信网络信号覆盖 根据现场勘测实际情况,以及楼层功能情况推算的话务分布情况,确定覆盖范 围为住宅区a区1号~10号楼B1F、B2F储藏室、车库和公寓楼全楼,覆盖面 积约为53400平方米。 覆盖方式如下: 1)信源采用通信网络光纤宽频直放站一拖二1套(近端机1台,远端机20W 2台)和宽频干线放大器(10W)8台;一拖一1套(近端机1台,远端机20W 1台)和宽频干线放大器(10W)6台,直接从住宅区a区豪宅上的新建基站2扇区耦合信号。 2)根据建筑结构特点,平层采用室内全向吸顶天线进行覆盖。 3)电梯井道内安装室内定向壁挂天线覆盖电梯。 4)所有的天线布放位置,均是以通信网络800MHz信号的传播模型为参考,并据此分布方式推出通信网络的馈入功率。 1.2.2WLAN信号覆盖 根据现场勘测实际情况以及楼层功能情况分析,住宅区a区主要为住宅、储藏 室和车库,故无需WLAN的覆盖。

室内分布系统与WLAN工程施工质量规范标准

《室分布系统及WLAN工程施工质量规》 一、概述: 为加强和勤通信技术工程实施过程中的现场管理,强化各合作单位的安全、文明施工管理意识,杜绝各类违章、违规施工的现象,结合工程建设的现场实际情况,编制了本规,用以指导现场的施工,全面推行精细化的施工管理,在安全生产、文明施工的前提下,确保工程质量。 二、适用围: 本规适用于和勤通信室分布系统工程、WLAN工程的现场施工质量、安全文明要求。 三、质量规要求: (一)分布系统工程施工质量规 1、设备安装要求: ?安装位置、设备型号必须符合工程设计要求。 ?要求所有的设备单元安装正确、牢固,无损坏、掉漆的现象,无设备单元的空位应装有盖板。 ?施工完成后,所有器件要做好清洁,保持干净。 2、电缆连接要求: ?外部电缆包括:射频线、传输线、信号线、电源线、地线、外部告警线等。 所有电缆走线应保持顺畅,不能有交叉和空中飞线的现象。 ?连到设备的电源线不能和其他电缆捆扎在一起。 ?有源设备应有良好接地,并应用16平方毫米的接地线与建筑物的主地线连接。

?所有与设备相连的电缆连接要求整齐、美观,连线的两端的接头接触良好,不得有松动现象,馈线连接处驻波比须小于1.5。 2.1馈线布放要求 ?同轴电缆所经过的线井应为电气管井(弱电井),不得使用风管或水管管井。 ?同轴电缆应尽量在线井和吊顶的线槽布放,走线美观,并按规定用扎带进行牢固固定,且不得于其他厂家的馈线及电线绑扎在一起。 ?同轴电缆的连接头必须牢固安装,接触良好,并做防水密封处理。 ?电缆头的规格型号必须与射频同轴电缆相吻合。 ?电缆冗余长度应适度,各层的开剥尺寸应与电缆头相适合。 ?电缆头的组装必须保证电缆头口面平整,无损伤、变形,各配件完整无损。 电缆头与电缆的组合良好,导体的焊接或插接应牢固可靠,电气性能良好。 ?芯线为焊接式的电缆头,焊接质量应牢固端正,焊点光滑,无虚焊、无气泡,不损伤电缆绝缘层。焊剂宜用松香酒精溶液,严禁使用焊油。 ?芯线为插接式的电缆头,组装前应将电缆芯线(或铜管)和电缆头芯子的接触面清洁干净,并涂防氧化剂后再进行组装。 ?电缆施工时应注意端头的保护,不能进水、受潮;暴露在室外的端头必须用防水胶带进行防水处理;已受潮、进水的端头应锯掉。 ⑴按照设计文件的路由布放,要求走线整齐、美观,不得有交叉、扭曲、裂损、空中飞线等情况; 电梯井内馈线布放较杂乱。电梯井内馈线布放整齐,固定牢固。

室内分布系统试题 答案

室内分布系统考试 单位_____________ 姓名______________ 一、选择题(每题分,共30分) 1.以下器件中属于有源器件的是(C ) A.耦合器 B.功分器 C.干线放大器 D.合路器 2.在800-2500 MHz时,三功分器的最大插入损耗是多少? (B ) A.-≤ B.-≤ C.-≤ D.-≤ 3.在800-2500 MHz时,6dB耦合器直通端的最大插入损耗是多少?(B ) A.-≤2dB B.-≤ C.-≤ D.-≤ 4.在室内分布系统中,楼层的覆盖一般用什么类型的天线?(A ) A.全向吸顶天线 B.定向天线 C.八木天线 D.抛物面天线 5.在室内分布系统中,电梯的覆盖一般用什么类型的天线?(B ) A.全向吸顶天线 B.定向天线 C.八木天线 D.抛物面天线 6.在满足覆盖质量要求和投资预算的前提下,尽量减少干放的使用数量,干放不可串联使用,并联 使用时每个信号源单元所带干放不超过(C ) A.3台 B.4台 C.5台 D.6台 7.在1900 MHz时,1/2馈线每百米损耗为( C ) A. 6 dB B.7 dB C.11 dB D.12 dB 8.在地铁、隧道等一些陕长的环境中,一般采用什么电缆进行覆盖。(C )

A.1/2馈线 B.7/8馈线 C.泄漏电缆 D.1/2软馈线 9.目前建设的室内分布系统中,要求功分器、耦合器等无源器件支持频段范围为( A ) A.800—2500MHz B.800—2200MHz C.1710—2200MHz D.1710—2500MHz 10.室内分布系统布线要求中,驻波比应小于( A ) A. B. C. 14 D. 11.综合室内分布系统中,CDMA/3G/WLAN系统不可共用的器件是( A ) A.干线放大器 B.合路器 C.功分器 D.室内天线 12. 1 W等于多少dBm( C ) A.20dBm B.27dBm C.30dBm D.33dBm 13.以下设备标注中,哪个表示耦合器?( B ) A.PS n-mF B.T n-mF C.CB n-mF D.ANT n-mF 14.Sitemaster的主要作用是用于测试( C ) A.天线口功率B.光路时延C.驻波比D.直放站增益 15.话音质量等级(MOS)的主观判断分为几个等级( C ) A.2; B.4; C.5; D. 6 16.在室内分布系统中,要求信源和干放的输入输出及天线口功率与设计值误差在( B ) A.±1dB B.±2dB; C.±; D.±3dB; 17.在室内分布系统中,要求有源设备接地地阻值为( B ) A.<3欧姆 B.<5欧姆 C.<10欧姆 D.<15欧姆 18.以下直放站中,哪种是需要在LOS(视线连接)条件应用的?( D ) A.同频直放站

室内分布系统分场景覆盖设计规范(宾馆酒店篇)

内蒙古移动室内分布系统分场景设计规范 (宾馆酒店篇) 中国移动通信集团内蒙古有限公司 2009年09月

1.室内分布系统分场景方案概述 (3) 2.宾馆酒店 (4) 2.1场景描述 (4) 2.2分布系统类型选择 (4) 2.3建设方式及天线布点位置 (5) 2.3.1建设方式 (5) 2.3.2天线分布图 (6) 2.4室内外协同覆盖的考虑 (6) 2.4.1切换区设置 (6) 2.4.2泄漏控制 (7) 2.5信源选择及容量配置 (7) 2.5.1容量分析 (7) 2.5.2信源选择及功率设置 (7) 2.5.3增强性功能配置 (7) 2.6特别注意事项 (8)

1.室内分布系统分场景方案概述 基础网络建设是中国移动近年的工作重点。集团公司提出了“根据市场发展需要调整建设思路,提升网络质量,保障良好的客户感知”的目标,将采取“加大室内覆盖力度”等手段来保证网络质量。 由于室分系统设计的复杂度,针对地区目前的实际情况,通过模型化分类场景的分析,阐述不同场景的设计要点、工程实施和验收要点,为室分的设计人员、厂家及施工管理人员提供参考。 针对目前的楼宇结构情况,为实现分场景模型化研究,对室内分布场景进行划分如下:

2.宾馆酒店 2.1场景描述 酒店楼体为钢筋混凝土框架,墙体一般按照酒店的装修材质分为砖墙精装修、砖墙简装修两类。 砖墙精装修吸收电磁波能力强,损耗大;砖墙简装修损耗相对小。 根据宾馆场景的具体特点,对其进行二级分类如下: 对于酒店场景,通常话务量发生较大的区域为低层的大厅、咖啡厅、大型会议室、宴会厅、餐厅等场所;这些区域天线的布点可以相对密一点;对于标准层的客房一般话务量发生的时段通常都在晚上。可采取以下措施达到室内深度覆盖: 采用“小功率,多天线”的分布思路,信号只经过一次穿透覆盖室内,; 考虑天线进客房、会议室、老总办公室及纵深较大的办公区、餐厅包间、酒店内娱乐场所等重要区域;在标准层天线进客房一般为入户在窗边安装一副定向天线可满足本身及左右两边各一个房间的覆盖,这样一个天线就可以覆盖三个房间;对于老总办公室及总统套房、VIP客房这样的地方要一个房间一个天线,功率不需要太高,要重点保障!低层其它的功能区视具体楼宇的实际情况,根据隔断的多少及材质决定天线的布放情况。 2.2分布系统类型选择 GSM优先采用无源方案,如果楼宇规模很大,则建议使用微蜂窝+干放或是微蜂窝+光纤直放站的信源分布方式。

室内设计策划书-模板

室内设计策划书 常见的十种室内设计方案 从建筑风格衍生出多种室内设计风格,根据设计师和业主审美和爱好的不同,又有各种不同的幻化体。这里,向大家介绍目前较为常见的10种室内设计风格。 1、古典风格(豪华富裕) 在装修刚兴起的年代,装修大多追求的是较为豪华富裕的风格。尤其是在20世纪80年代和90年初,室内装修往往是炫耀自己身份的一种特殊形式。业主们会要求把各种象征豪华的设计嵌入装修之中,例如彩绘玻璃吊顶、壁炉、装饰面板、装饰木角线等等,而且基本上以类似于巴洛克风格结合国内存在的材料为主要装饰方式。 2、朴素风格(随心所欲) 20世纪90年代,在一些地区出现一股家装热。由于受技术和材料所限,那时还没有真正意文上的设计师来进行家装指导,因此随心所欲就是当时的最大写照。业主们开始追求一种整洁明亮的室内效果。时至今日,这种风格仍然是大多数初次置业者装修的首选。 3、精致风格(高贵庄重) 在经过近10年的摸索,随着国内居民的生活水平的提高、对外开放的增多,人们开始向往和追求高品质的生活。大约是从20世纪90年代中期开始,人们开始在装修中使用精致的装饰材料和家具,尤其是在这个时候,国内的设计师步入家装设计行列,从而带来了一种新的装饰理念。 4、自然风格(艺术休闲) 20世纪90年代开始的装饰热潮,带给人们众多的装饰观念。市面上大量出现的台湾、香港的装饰杂志让人们大开眼界,以前大家所不敢想像的诸如小花园、文化石装饰墙和雨花石等装饰手法纷纷出现在现实的设计之中。尤其是大家看惯了红榉大量使用所造成的“全国装修一片黄”的装饰现象之后,亲近自然、返璞归真也就成为了人们所追求的目标之一。 5、轻快风格(豪爽大方) 20世纪90年代中期开始,家居的设计思想得到了很大的解放,人们开始追求各种各样的设计方式,其中现代主义、后现代主义等一系列较为完整的设计体

室内分布系统施工规范报告

湖南省通信建设监理有限公司 范规统施工室内分布系 有源设备一、 )分布系统的主机单元、远端GRRU有源设备是指:分布式基站,射频拉远(单元等设备。 安装位置要求、1 安装位置应符合设计文件的要求,设备尽量安装在馈线走线的线井内,安11.装位置应便于调测、维护和散热的需要; 安装位置应无强电、强磁和强腐蚀设备的干扰;21. 安装场所应干燥、灰尘小、且通风良好31.; 安装位置便于馈线、电源线、地线的布线;41. 安装位置的室内不得放置易燃品;室内温度、湿度不能超过主机工作温度、1.5湿度的范围; 设备安装、2 严格按照说明书的介绍进行,使用合理的工具、安装件进行牢固安装牢固.12平整,不松动; 设备上要有(移动)标志,贴于设备右上位置;.22 要求所有的设备必须要安装正确、牢固、无损伤、掉漆的现象;3.2 厘米以上;304设备安装应严格避免强电强磁干扰,距强电至少要2. 米)米,联通/1.7.25设备挂壁式安装时,主机底部距离地面为(移动/1.5在特殊机房内安装时,主机底部或顶部应与其它原有壁挂设备底部或顶端 保持在同一水平线上; 米,在移动机0.86设备落地式安装时,龙门架底座或主机座应与墙壁距离.2房、交换机房等特殊专用设备机房内安装时,应与原有设备保持整体协调; 对于光纤分布系统的主机单元,各模块的安装数量应符合设计文件的规定;.72接地要求3

对于干线放大器、光纤分布系统的主机单元设备必须接地,并应用不小于1.3.湖南省通信建设监理有限公司 平方毫米的铜芯橡皮包线与建筑物的主地线接地;16 设备与地线、地线与保护地的连接端必须用线耳连接,不允许地线与设备23.直接绕接、驳接现象; 每台有源设备须各自安装独立的地线,不可共用一根地线;地线须按国标3.3规定,用黄绿色专用线,须加装平垫、弹簧垫拧紧; 设备接地不能接避雷地,要接保护地;3.4 度,弯曲曲率半径90.5为减少接地线的电感,要求接地线的弯曲角度大于3毫米;130大于 地线走线要用线码固定,严禁有飞线现象,不得与馈线、电源线有交叉现63.象; 的地线走线要求与射频走线固定原则相同,并作好标签识加套白色PVC.37别; 口必须用防火泥/8地线如遇穿墙走线,穿墙部分必须加套管保护,穿墙孔3.加以密封; 电源要求4 设备电源插板至少有两芯及三芯插座各一个,放置于工作状态时不易触摸4.1到的位置; 设备专用电源必须要安装空气开关对设备进行保护;.24 设备电源插座必须从空气开关盒内引出;.34 设备的输入电源线,必须火线、零线、地线相对应连接,不得错接;44. 的电源线走线要求与射频走线固定原PVC电源线走线要固定,加套白色.45则相同,走线外观要平直美观; 连接至主机的电源线不能和其他电缆捆绑在一起;4.6 电源线须作好标签识别;.74 口必须用防火电源线如遇穿墙走线,穿墙部分必须加套管保护,穿墙孔/.48泥加以密封; 连接电源线时,必须作好安全防护工作,以绝对保证人身安全;4.9 ;的橡胶皮包缆线.410交流220V供电电源线采用2.5mm2X3 二、天馈系统 湖南省通信建设监理有限公司

相关主题