搜档网
当前位置:搜档网 › 施工组织设计中英文摘要

施工组织设计中英文摘要

施工组织设计中英文摘要
施工组织设计中英文摘要

丽水澜庭B区1#楼施工组织设计

摘要:施工组织设计是建筑施工组织的核心和灵魂,是对工程建设项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件。本施工组织设计是针对丽水澜庭B区1#楼工程施工的纲领性文件。以1#楼为研究对象,深入实践,理论联系实际,查阅相关资料,针对本工程自身特点,制定出专项施工方案和相应的施工组织设计。本施工组织设计阐述了施工过程中常见问题及解决办法,文中所述的施工工艺及技术措施能较好的指导施工,使各分部分项工程质量、进度及成本得到有效控制,能保证各阶段施工有序进行。

关键字:施工组织设计;施工方案;质量;进度;成本

The construction organization design for the 1# buildings

at area B of LiShuiLanTing

Abstract: Construction organization design is the core and soul of construction organizations, and is the whole process of engineering construction projects and the specific arrangements envisaged in the concept, used to guide the construction of the project activities of the whole process of technical, economic and organizational comprehensive document. This construction organization design is a guiding document for the 1# building at area B of LiShuiLanTing.Take 1# buildings as a research object,with thorough practice, link theory with practice and access relevant information, according to the characteristics of t he project, make a special construction schemes and the corresponding construction organization design. This construction organization design expatiated the common problems and the solving methods in construction process, the construction technology and technical measures in this paper will better to guide construction,and made each division component project’s quality, schedule and cost to be controled effectively, also can guarantee the stage construction in an orderly way.

Key words:construction organization design;construction scheme;quality;schedule;cost

毕业论文中英文摘要及目录(供参考)

密级:立体停车库的PLC控制系统设计 Design of PLC Control System for Parking Garage 学院: 专业班级: 学号: 学生姓名: 指导教师: 2018年6月

摘要 随着我国国民经济的不断发展及城市现代化要求,汽车在我国越来越普及,而这将导致大中等城市“停车难”问题日益凸显。在现有的土地资源条件下,多层的机械式立体停车库可以很好的提高现有土地资源的利用率,充分发挥土地资源的空间优势,使得汽车的存放数量得以优化,从而快速有效地解决大中等城市“停车难”问题。本论文以一个三层三行三列二十一车位的升降横移式自动化立体停车库为主要研究对象,在深入分析了立体停车库运行原理的基础上,采用可编程控制器(PLC)为主要控制单元对该立体停车库控制系统进行设计。论文研究的主要内容为: 1、针对机械式立体停车库类型、国内外发展现状以及我国行业发展中存在的问题等进行研究。 2、选定以三层三行三列6+6+9结构二十一车位升降横移式立体停车库为研究模型,研究该立体停车库的总体结构设计及车库运行原理等。 3、对升降横移式立体停车库的硬件系统进行设计。内容包括:主回路设计,手动控制系统设计,PLC外围硬件设计,绘制了车库主电路图,手动控制电路图和PLC外围电路接线图等。 4、对升降横移式立体停车库的软件系统进行设计。内容包括:PLC总体介绍,PLC编程语言的选择,设计了程序主框架流程图,各基本功能程序流程图,按要求编写了梯形图程序等。 5、采用S7-200仿真软件对升降横移式立体停车库进行在线仿真与调试。 本论文重点对升降横移式立体停车库总体结构和控制系统的硬件、软件系统进行设计。设计过程采用模块化设计思路,结构灵活,通过对PLC软件系统设计及优化,使得本立体停车库具备智能化控制的功能,实现了立体停车库停车位能够安全、稳定、准确、快速的移动至人车交接处进行存取车操作。该立体停车库充分发挥土地资源的空间优势,大大提升了土地资源的空间利用率,是应对大中等城市停车难问题的有效解决方案。 关键词:立体停车库;升降横移式;PLC;控制系统设计 Abstract

施工组织设计的重要性及国内外发展趋势

施工组织设计的重要性及国内外发展趋势 郑妍 (福建信息职业技术学院,福建,福州350000)摘要随着社会经济不断迅猛发展,建筑工程承包市场的规模、范围和开放度在不断扩大,工程项目向大型化和复杂化发展,竞争越来越激烈;国际投资商和业主对建筑承包商的要求和期望也越来越高,从而对建筑工程项目施工中的组织设计提出了更高的要求。 关键词施工组织;建筑工程;管理;发展;优化 0 引言 施工组织设计的任务是在技术上解决建筑物高耸、大跨度、深基础的施工方案选择问题;在安装技术上如何配备现代化的通信、监控、自动控制等系统的施工新趋势;在施工质量上如何按照重量标准体系高效优质的施工;在文明施工上怎样做到无污染、无噪声、无公害,创造文明、整洁、美观的施工现场。总之,它就是国家的建设方针、指导政策下,从施工的全局出发,根据拟建工程的各种具体条件,拟定工程施工方案,安排施工进度,进行现场布置;把设计和施工、技术和经济、企业的全局活动和工程的施工组织设计,把施工中各单位、各部门、各工种、各阶段以及各项目之间的关系等更好地协调起来,使施工建立在科学、合理的基础之上,从而做到人尽其力、物尽其用,优质、安全、低耗、高效地完成工程施工任务,取得最好的经济效益和社会效益。 1 建筑施工组织的重要性 由于建筑产品的单一性,一成不变的施工组织设计难以适用于所有的建筑工程项目,所以,如何根据各建筑工程项目不同特点编制相应的施工组织设计则成为施工管理中的重要一环。多年来,受计划经济思想的影响,在施工组织设计的编制和执行过程中,存在许多问题,如在工程招投标过程中、签订施工承包合同时,为应付建设单位的审查,不得不编一个书面的施工组织设计(不具备现场操作性),具体施工时完全凭经验组织施工,想到哪,做到哪,造成大量的窝工、浪费、效率低下,一些施工单位的管理人员,不熟悉也不钻研施工组织设计的编制业务,使一些新工艺、新技术、新材料得不到及时的应用和推广,更没有结合建筑工程项目的具体情况进行优化施工方案、降低工程成本、质量安全措施制定等;有些施工组织设计在编制时,没有结合建设单位提出的要求和合同条款,片面地考虑现场施工方便,从而造成后期施工上的被动;特别是只重视施工组织设计的技术性,而忽视其质量,安全,经济性,以致影响了施工组织设计作用的发挥,直接影响工程质量和施工企业的经济效益。 随着我国社会主义市场经济体制的迅速发育,在施工组织管理方面也出现了许多新的情况和变化:招投标制和建筑监理制的健全完善,以政府指导价和市场价相结合的建筑市场价格改革与以“鲁布革经验”、“FIDIC《施工合同条款》”等为代表的国际惯例的接轨,包括推行功法制度在内的企业技术发展体制的改革和以计算机管理为核心的现代管理模式的发展等。从而给施工组织设计提出一系列新的要求和新的课题。施工企业不仅要重视施工组织设计,

[上海]工业厂房中英文对照施工组织设计(土建、水电安装

[上海]工业厂房中英文对照施工组织设计 施 工 组 织 设 计 中建四局第五建筑工程有限公司 China Construction Fourth Bureau Fifth Engineering Division Co.,Ltd

目录Index 第1部分施工组织设计总说明 .......错误!未定义书签。 1.1工程概况Generals (268) 1.1.1项目情况Condition (268) 1.1.2建筑结构概况General of Building Structure ................ 错误!未定义书签。 1.1.3地质情况Geological Condition ................................... 错误!未定义书签。 1.1.4水纹及周围道路情况Water wave and peripheral road and underground pipelines ........................................................................... 错误!未定义书签。 1.1.5安全文明施工目标Safety and civilized construction objectives错误!未定义 书签。 1.1.6工程特点、难点及对策Project difficulty and countermeasure错误!未定义 书签。 1.2工程目标Project Objective (268) 1.2.1质量目标Quality Objective (268) 1.2.2工期目标Schedule Objective (268) 1.2.3安全、文明施工目标Safety, Civilized Construction Goal (269) 1.3施工大型机械的配备 (269) Preparation of large equipment for construction (269) 1.4工程施工设想Construction Consideration (270) 1.5编制依据Reference (270) 第2部分施工进度计划 (272) 2.1进度计划编制说明Description of Schedule Preparation (272) 2.2施工流水段划分 (272) Division of Streamlined Construction Section (272) 2.2.1施工流水段划分的原则Principle of the Division of Streamlined

毕业设计外文翻译附原文

外文翻译 专业机械设计制造及其自动化学生姓名刘链柱 班级机制111 学号1110101102 指导教师葛友华

外文资料名称: Design and performance evaluation of vacuum cleaners using cyclone technology 外文资料出处:Korean J. Chem. Eng., 23(6), (用外文写) 925-930 (2006) 附件: 1.外文资料翻译译文 2.外文原文

应用旋风技术真空吸尘器的设计和性能介绍 吉尔泰金,洪城铱昌,宰瑾李, 刘链柱译 摘要:旋风型分离器技术用于真空吸尘器 - 轴向进流旋风和切向进气道流旋风有效地收集粉尘和降低压力降已被实验研究。优化设计等因素作为集尘效率,压降,并切成尺寸被粒度对应于分级收集的50%的效率进行了研究。颗粒切成大小降低入口面积,体直径,减小涡取景器直径的旋风。切向入口的双流量气旋具有良好的性能考虑的350毫米汞柱的低压降和为1.5μm的质量中位直径在1米3的流量的截止尺寸。一使用切向入口的双流量旋风吸尘器示出了势是一种有效的方法,用于收集在家庭中产生的粉尘。 摘要及关键词:吸尘器; 粉尘; 旋风分离器 引言 我们这个时代的很大一部分都花在了房子,工作场所,或其他建筑,因此,室内空间应该是既舒适情绪和卫生。但室内空气中含有超过室外空气因气密性的二次污染物,毒物,食品气味。这是通过使用产生在建筑中的新材料和设备。真空吸尘器为代表的家电去除有害物质从地板到地毯所用的商用真空吸尘器房子由纸过滤,预过滤器和排气过滤器通过洁净的空气排放到大气中。虽然真空吸尘器是方便在使用中,吸入压力下降说唱空转成比例地清洗的时间,以及纸过滤器也应定期更换,由于压力下降,气味和细菌通过纸过滤器内的残留粉尘。 图1示出了大气气溶胶的粒度分布通常是双峰形,在粗颗粒(>2.0微米)模式为主要的外部来源,如风吹尘,海盐喷雾,火山,从工厂直接排放和车辆废气排放,以及那些在细颗粒模式包括燃烧或光化学反应。表1显示模式,典型的大气航空的直径和质量浓度溶胶被许多研究者测量。精细模式在0.18?0.36 在5.7到25微米尺寸范围微米尺寸范围。质量浓度为2?205微克,可直接在大气气溶胶和 3.85至36.3μg/m3柴油气溶胶。

施工组织设计概述

施工组织设计 第一章概述 第一节编制原则 1.1.1 编制依据 1、本工程招标文件招标图纸及技术条款要求。 2、国家及水利水电行业技术规范、规程及标准。 3、本工程招标现场踏勘资料及其它材料。 4、本公司以往类似工程的施工经验和现有的综合施工能力。 1.1.2 编制指导思想 淮北大堤涡下段加固工程范围为涡河口以下淮河左堤(老元塘~下草湾),工程等级为I等I级,涉及安徽省蚌埠市怀远县、淮上区、五河县和明光市。加固长度约98km,主要工程内容为堤身加培、填塘、防渗、护坡、穿堤建筑物加固等。基于本工程的重要性,我单位以精心施工确保工程质量、抢抓工期尽早发挥效益作为出发点,编制投标文件时着重于下面几点: 1、响应招标文件,满足业主对本工程工期、质量及安全生产、文明施工的要求。 2、抓住本工程的特点、难点和重点,采取有针对性的措施,解决技术的关键问题。 3、优化施工方案,完善施工组织,合理利用施工资源,强化施工管理,确保整个工程“保 质、安全、快速、文明”施工。 4、在科学可行的技术基础上,深化细化施工程序、施工方法、施工进度计划,施工中尽可 能保持高生产效率。 5、在施工组织中,结合文明施工和环境保护进行施工布置和临时设施规划,树立本工程良 好的总体施工形象。 1.1.3 编制内容 我单位认真研究了本招标工程的全部招标文件、招标图纸及技术条款的要求,并对施工现场进行了详细踏勘,据此编制施工组织设计。分别对工程施工进度计划和保证措施,施工总平面布置,各分项工程施工方案,施工机械、试验设备、劳动力数量和人员配备,质保体系和措施,安全体系和措施、文明施工措施,环保施工及施工组织机构等作详细说明。 1.1.4 施工总体目标 我公司属水利水电总承包一级施工企业。若我单位中标,将按照“加强管理,精心施工,创优良工程,树文明形象,拓一方市场”的公司经营方针进行施工。我公司将响应招标文件全部条款,采取切实可行的方案措施,达到以下目标:

毕业设计中英文摘要

摘要 本毕业设计选取的题目是东天山小区2-1楼工程造价与施工组织设计。本工程负一层为半地下车库,地上六层,外加一阁楼层,建筑高度26.15m,建筑面积9119.7m2,结构形式为砖混结构。本毕业设计由工程造价、施工组织设计、工程项目管理、专题设计等四个部分组成。 第一部分工程造价。通过福莱一点通软件计算工程量,综合分析现行建筑市场的人工、材料、机械等市场价格,编制设计任务书规定范围的工程量定额报价和工程量清单报价。 第二部分施工组织设计。根据工程特点划分施工段,确定合理的施工顺序,选择主要分部分项工程施工方法和主要施工机械,根据工期要求编制合理施工进度计划表,并绘制施工平面图,以及采取有效的质量、安全等保证措施,例如安全文明施工措施、季节性施工措施等。 第三部分工程项目管理。包括工程进度、质量、造价三大控制以及工期索赔和项目管理机构设计。根据工期要求,在工程进度调整条件下,绘制调整后进度计划表并依据索赔程序,编制工期索赔文件。另外根据工程特点,确定本工程的质量、进度、造价等控制要点,进行项目管理机构设计。 第四部分专题设计。根据工程特点进行外脚手架计算和模板设计。并绘制脚手架设计图和模板设计图。 关键词:工程量计算;工程造价;施工方案;脚手架设计

Abstract The graduation design subject is Easten sky mountain district 2-1# building project cost and the construction organization design.The -1 layer of the project is a underground garage,there are 6 layers overground and a attic, the building is 26.15 meters tall and it’s construction area is 9119.7 square meters, the structure form is brick and concrete structure. the graduation design consists of four parts which are construction cost ,the construction organization design, project management and scaffolding template special design The first part is construction cost .The cost of construction project is calculated by Fly. Analysis the current price of labor, materials, machinery in the construction market and work out the Fixed price and the detailed list of engineering quantity price.choose construction measures of main component project and major machine, The second part is construction organization design. Devide the construction period according to the features of the project, make sure a reasonable construction sequence, Prepare the reasonable construction progress schedule on the basis of construction time limit, draw the construction plan chart and make some measures to protect the quality and safety of the project like safety civilized construction measures and seasonal construction measures. The third part is project management. It includes progress,quality and cost control,claim for extension of time and project management institutions desigh. Draw adjusted progress schedule in the progress of the projects under the condition of adjustment, Draw the construction plan chart, and prepare period claim document depend on the claim program. Make sure the project quality, progress, cost and control points and desigh project management mechanism. The fourth part is project design.Desigh the scaffold and template according to engineering characteristics and draw their figures. Key words: Quantity calculation ;Construction cost ; Construction method;Scaffold design

施工组织设计毕业论文

四川建筑职业技术学院5号教学楼 施 工 组 织 设 计 设计题目: 姓名:

系(院): 专业名称: 指导老师: 年月日 摘要: 施工组织设计是建筑施工组织的核心和灵魂,是对工程建设项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件。本施工组织设计是针对德阳市四川建筑职业技术学院5号教学楼施工的纲领性文件。编制时对项目管理机构设置、施工总体部署、施工准备、主要分部分项工程施工方法、工程质量保证措施、安全及文明施工措施、施工现场管理措施等诸多因素尽可能充分考虑,突出科学性、适用性及针对性,是确保优质、低耗、安全、文明、高速完成全部施工任务的重要经济技术文件。本施工组织设计包括:施工方案的设计,主要分项工程施工方法的设计,基础工程设计中的土方工程;主体工程设计中的模板工程、钢筋工程、混凝土工程、脚手架工程、砖砌筑工程、屋面工程、装饰工程、给排水管道安装、电气安装工程等,以及质量保证措施的设计、安全技术措施的设计、施工现场文明施工措施的设计、降低成本措施的设计和各项资源需用量计划的设计。 关键词:工程施工设计安全文明

目录引言

第一章编制说明·1 第一节编制目的·1 第二节指导思想·1 第三节编制依据·1 第二章工程概况·2 第一节建筑概况·2 第二节建筑墙体·2 第三节建筑装饰·2 第四节结构概况·2 第五节电气安装工程·2 第六节给排水安装工程·3 第三章施工部署·4 第一节总体施工部署··4 第二节施工组织和协调管理·4 第三节施工段的划分·7 第四节施工准备·8 第五节施工总平面布置·9 第四章主要施工方案·11 第一节工程施工测量方案·11 第二节土方施工方案·13 第三节钢筋工程·15 第四节模板工程·20

施工组织设计中英文对照

办公楼工程施工组织设计 NEW OFFICE BUILDING PROJECT Organizational Arrangement For Construction 目录Contents一、编制说明............................................... 2 Explanation to the Compilation 二、工程概况.. (6) Project Profile三、施工准备 (9) Preparations for the Commencement四、项目组织管理机构............... 14 The Project Administration Organization五、土建部分主要施工方法The Main Construction Method for the Civil Work ............................................................................................... (21) 六、装饰装修工程主要施工方法The Main Construction Method for (45) Finishing Work七、安装部分主要施工方法................ 52 Main working plan for installation八、季节性施工措施..................................... 64 Working plan for seasonality九、质量保证措施.................................... 67 Quality guarantee measurement十、工期保证措施.......................... 72 The steps for time limitation guarantee十一、安全生产措施.............................

土木工程毕业设计中英文翻译

附录:中英文翻译 英文部分: LOADS Loads that act on structures are usually classified as dead loads or live loads are fixed in location and constant in magnitude throughout the life of the the self-weight of a structure is the most important part of the structure and the unit weight of the density varies from about 90 to 120 pcf (14 to 19 KN/m)for lightweight concrete,and is about 145 pcf (23 KN/m)for normal calculating the dead load of structural concrete,usually a 5 pcf (1 KN/m)increment is included with the weight of the concrete to account for the presence of the reinforcement. Live loads are loads such as occupancy,snow,wind,or traffic loads,or seismic may be either fully or partially in place,or not present at may also change in location. Althought it is the responsibility of the engineer to calculate dead loads,live loads are usually specified by local,regional,or national codes and sources are the publications of the American National Standards Institute,the American Association of State Highway and Transportation Officials and,for wind loads,the recommendations of the ASCE Task Committee on Wind Forces. Specified live the loads usually include some allowance for overload,and may include measures such as posting of maximum loads will not be is oftern important to distinguish between the

论文写作规范(中英文摘要及正文)-译文格式

要 随着时代的发展,人们对纺织品的要求也已经不再仅仅局限于实用。激烈的国际竞争逼使纺织企业采用高新 技术重视绿色工艺,开发环保产品则已成为新世纪市场竞争的新焦点。欧共体的Eco-label 倡导的是全生态的概念,欧盟委员会(2002/371/EC )生态标准中,在纺织纤维中列出腈纶纤维的考核指标:原料纤维中丙烯腈的残留量应低于1.5mg/kg 。 丙烯腈是一种有毒物质,且有致癌作用。其极毒,对温血动物的毒性约为氰化氢的1/30。丙烯腈不仅蒸气有毒,而且附着于皮肤上也易经皮肤中毒。长时间吸入稀丙烯腈蒸气,则能引起恶心、呕吐、头痛、疲倦和不适等症状。由此可见,丙烯腈直接危害着人们的健康。 本文依照欧盟(2002/371/EC )生态标准对腈纶纤维中丙烯腈残留量的控制,通过试验论证,确立了采用顶空固相微萃取和色质联用技术(HS —SPME —GC/MS ),由此建立腈纶纤维中丙烯腈残留量的测定方法。该方法具有操作简单,便捷,灵敏度高,准确性好的优点,而且仪器价格适中,便于推广。本文实验所使用的方法检测限低于0.5mg/kg ,回收率在86.2~ 关键词:腈纶,丙烯腈,残留量,气相色谱/质谱

competition, developing environmentally safe products has already become the new focus of the market competition in the new century. What Eco-label of European Community is advocated is all ecological concept , in the ecological standard of EU Committee (2002/371 / EC ), list the examination index of the fibre of the acrylic fibres in the dope-dyed fiber: The residue amount of the acrylonitrile should be lower than 1.5mg/kg in the raw materials fibre. The acrylonitrile is a kind of noxious substance extremely poisonous , the toxicity to the warm-blooded animal is about 1/30 of the hydrogen cyanide. Not only the vapour is poisonous for the acrylonitrile , but also adhere to the skin book of changes skin is poisonned. Suck the vapour of the rare acrylonitrile for a long time, can cause such symptoms as the nausea , vomitting , have a headache , tired and uncomfortable ,etc. . Therefore, the acrylonitrile is endangering people's health directly. Describe the HS-SPME-GC/MS procedure of determination method for acrylonitrile residue in acrylic fibre according to the limit control of European (2002/371/EC). The method provided very good linearity data. This method is easy to operate, highly sensitive and lower cost, easy to be extend. The limits of detection were below 0.5mg/kg, Acerage recovery between 86.2~98.6%.

施工组织摘要

摘要 施工组织设计是现代建筑的一个重要组成部分,在建筑工程中起着至关重要的作用,是施工方研究和规划的重点。高效合理的施工组织设计可以帮助施工方加快工程的进度,降低成本,保障生产的顺利进行,并可以实现对资源有效控制和管理。 本设计主要针对重庆建筑职业学院教学楼进行施工组织设计,根据设计图纸工程地处环境等因素从工程任务安排,施工部署,施工顺序施工方法,机械选择,施工进度计划等方面在考虑夏季季施工等情况下,对本工程进行较为合理的施工组织安排。 因本人能力有限如有安排不合理或与实际不相符的情况请老师多提宝贵意见,以便我能及时改正。 [关键词]施工组织、进度计划

ABSTRACT Construction organization design is an important component of modern architecture, plays an important role in construction project, is the focus of the construction of research and planning. Efficient and reasonable construction of the construction organization design can help quicken the progress of the project, reduce costs, ensure production run smoothly, and can realize effective control and management of resources. This design is aimed at building Chongqing vocational college teaching building construction organization design, according to the engineering design drawings from engineering task arrangement, is located in the environmental factors such as construction plan, construction sequence of construction method, mechanical selection, construction progress plan, etc, in considering the summer season construction cases, this project to carry on the reasonable construction organization arrangement Because my ability is limited if there are any unreasonable arrangements or is inconsistent with the actual situation, please the teacher to give more valuable opinions, so that I can correct in time [key words ] construction organization, schedule

最新大型广场防水工程施工组织设计技术标中英文

大型广场防水工程施工组织设计技术标中 英文

大连某某广场项目防水工程业主:某某置业(大连)有限公司 Developer:Kardan Land (Dalian) Co.,Ltd 投标单位:某某公司 日期:2012年3月6日

正本 大连某某广场项目防水工程 技术标 某某公司

目录 (一)施工组织设计 (1) 1、编制说明 Explanation to the Compilation (1) 2、工程概况及材料特色 Project Overview (3) 3、施工准备 Preparations for Commencement (3) 4、主要施工机具及劳动力资源配置Preparations for Major Construction equipment and work forces (4) 5、项目组织管理机构 The Project Administration Organization (5) 6、施工工艺流程方案Technical Flow Chart (6) 7、季节性施工措施Working plan for seasonality (20) 8、质量保证措施Quality guarantee measurement (20) 9、工期保证措施 The steps for time limitation guaratee (23) 10、安全生产措施Security Production Measurement (25) 11、现场文明施工措施Field civilization working measures (28) 附1.质量承诺书 (29) 附2.工期承诺书 (30) 附3.维修服务承诺书 (31) 附4.不分包承诺 (32) 附表1 劳动力计划表 (33) 附表2 施工机具表 (34) 附表3 项目管理机构配备表 (35) 附表4项经理简历表 (36) (二)材料选用分析报告及技术指标 (43) 1.材料选用分析报告 (43) 2.材料技术指标 (44) (三)防水二次深化设计 (49) (一)施工组织设计 1、编制说明 Explanation to the Compilation 1.1 综合说明 Comprehensive Explanations 首先,感谢某某(大连)房地产开发有限公司给我们公司提供了这次合作的机 会,我们将全心全意为开发商和业主服务,配合设计单位和总包单位一起共同完成本 项目的建设任务。 First of all, we would like to thank GTC (Dalian) Real Estate Development Co., Ltd for giving us such an opportunity . we will serve the Developers and Client whole-heartedly, execute the project with the design unit and the total package together .

毕业设计中英文翻译

本科毕业设计(论文)中英文对照翻译 院(系部)电气工程与自动化学院 专业名称电气工程及其自动化 年级班级电气05-5班 学生姓名辛玉龙 指导老师封海潮 2009年6月10日

可编程序控制器 可编程序控制器或可编程逻辑控制器(PLC),是一个具有编程能力且完成一定控制功能的设备。 PLC是1968年被美国通用汽车公司的一组工程师设想出来。可编程控制器起初被设计用于基于程序的灵敏性控制和执行逻辑指令。人们意识到它的主要优点是被用于梯形图编程语言,简化了维修并且减少了其余部分的清查。而且,PLC提供了更短的安装时间并通过程序实现比硬接线更加快捷的传输。 当前,世界上已有50多个不同的可编程控制器的生产厂家,因为有如此多的PLC在使用,所以涵盖市场上所有类型的设备是不可能的,幸运的是,根本就没有必要去理解每一个可用的PLC。所有的机器都有许多的相同之处。 1 可编程控制器的组成 所有的可编程控制器都有输入输出接口、存储器编程方法、中央处理器、电源。 输入接口为机器提供一个连接,或使过程被控制。 输入接口是模块且是可扩展的,当控制任务增加时,可以通过扩展模块来接收更多的输入。输入数量的多少是由CPU和存储容量来限制的。输入接口的功能与输出接口相反,它将信号从CPU输出,且将其转换成被外部设备螺线圈、电机启动器等设备来产生控制动作。输出接口本质上也是一个模块,所以当需要时,可以加入输出扩展功能。 PLC的编程语言有多种形式,大多数PLC语言都是基本梯形逻辑,它比继电器逻辑更加先进。流程图程序语言也被用于一些PLC中,流程图是图形语言,它显示出一个过程中的变量相互之间的关系。 编程设备或程序终端允许用户用程序的形式来键入指令,并存入存储器。 程序是由用户编写且存储于PLC的存储器当中,是在特定处理条件下用来产生正确的控制信号的所需动作的表现形式。这样一个程序包括允许

环保工程施工组织设计方案概要知识讲解

xx项目 施工组织设计方案 xx公司 2013年5月 2项目说明 (5 2.1工程概况 (5 2.2处理工艺概述 (5 2.3工程目标管理 (6 2.3.1质量目标 (6 2.3.2工期目标 (6 2.3.3安全文明目标 (6 2.3.4环境保护目标 (7 2.3.5服务目标 (7 3项目组织架构 (7 3.3项目组织架构图 (7 3.4项目主要组织人员 (8 4项目详细技术方案 (8 4.1绿化移植方案 (8 4.1.1现场绿化介绍 (9

4.1.2移植方法 (9 4.2地下管线保护性开挖 (10 4.3雨季施工方案 (10 4.3.1雨季施工前准备工作 (10 4.3.2保证质量技术措施 (10 4.4深基坑开挖专项施工方案 (11 4.4.1深基坑支护及降水施工方法 (11 4.5土石方专项施工方案 (15 4.5.1土方工程施工技术措施 (15 4.5.2模板施工方法 (15 4.5.3模板工程施工工艺 (16 4.5.4模板安装 (17 4.4.5模板拆除 (18 4.4.6 土方回填 (18 5项目工料机安排布置 (19 6项目相关图纸 (19 2 7.1工程施工进度 (22 8项目安全、环保等保障措施 (23

8.1安全措施计划 (23 8.2施工环保措施计划 (28 9项目风险点及管控措施 (33 9.1施工触电应急措施 (33 9.2火灾/爆炸的应急措施 (34 9.3人员伤亡应急措施 (35 9.4外部依托措施 (36 9.5应急救援领导小组及其职责 (36 3 1编制依据 业主提供的招标文件及补充答疑文件; 我方设计方案; 《中华人民共和国环境保护法》 《中华人民共和国水污染防治法》 《中华人民共和国海洋环境保护法》 《中华人民共和国安全生产法》 《工程测量规范》GB 50026—2007 《建筑施工安全检查标准》JGJ 59-99 《施工现场临时用电安全技术规范》JGJ 46-2005

毕业论文标题中英文摘要关键词和目录的格式

毕业设计(论文) 新民本主义: 传统民本思想与现代民主理念的契合(字体:黑体小一) 专业年级 学生学号 学生姓名 指导老师 评阅人 二○○年月 中国·南京

摘要 (“摘要”两字的字体为黑体三号,居中。) 正文字体均为:宋体小四号,行距为倍 (不低于400字) 关键词:民本;民主;新民本主义 (“关键词”三字字体为黑体,内容(3-5)个,宋体小四号。各关键词之间用;)注意:摘要和关键词只能单独一页.

Abstract (“Abstract”一词用Times New Roman字体三号,加黑,居中。) Thought of people as the center is the marrow of our traditional culture and the core of the theory of managing state affairs. It germinates in the early state of antiquity society and is based on patriarchal clan system. It is also a kind of value seeking for the realization of the ethic reason and moral justice. Its basic thinking is that the monarch is defined by people and conversely people are defined by the monarch. At first appearance, its purpose is to value people’s suffering,fate and interest on the ruler’s position. However, its real intention is to fool the people so as to strengthen and consolidate the ruler’s rule. The theory of “people-oriented concept” includes nine topics such as “the theory of people is being the root of the monarch’s rule”, “the theory of people is being more valuable than the monarch”, “the theory of the monarch is being people’s servant”and so on. People –oriented means “value the people ”in essence, which sees “people”as its foundation of politics rule, ranking official, and administration. (正文字体为:Times New Roman字体,小四号,且行距为单倍或倍。) Key words:people- oriented concept;democracy;new people-basisism (“K ey words”一词用Times New Roman字体小四号,加黑。) 注意:英文摘要和关键词只能单独一页.

相关主题