NATM tunnel design principle in the construction of major and

Construction Technology

W.Broere

I.The NATM Design Principle

1.Tunnel design and construction of two major theoretical and development process

Since the 20th century, human space on the ground floor of the growing demand, thus the underground works of the study of a rapid development. In a large number of underground engineering practice, it is generally recognized that the tunnel and underground cavern project, the core of the problem, all up in the excavation and retaining two key processes. How excavation, it will be more conducive to the stability and cavern facilitate support : For more support, Supporting how they can more effectively ensure stability and facilitate the cavern excavation. This is the tunnels and underground works two promote each other and check each other's problems.

Tunnels and underground caverns, and focusing on the core issues with the above practice and research, in different periods, People of different theories and gradually established a system of different theories, Each system includes theory and resolve (or are studying the resolution) from the works of understanding (concept), mechanics, engineering measures to the construction methods (Technology), a series of engineering problems.

A theory of the 20th century the 1920s the traditional "load relaxation theory." Its core content is : a stable rock self-stability, no load : unstable rock may have collapsed. need shoring structure to be supported. Thus, the role of the supporting structure of the rock load is within a certain range may be due to relaxation and collapse of rock gravity. This is a traditional theory, and their representative is Taishaji and Principe's and others. It works similar to the surface issues of the thinking is still widely used to.

Another theory of the 20th century made the 1950s the modern theory of timbering or "rock for the theory." Its core content is : rock stability is clearly bearing rock to their own

self-stability : unstable rock loss of stability is a process, and if this process in providing the necessary help or restrictions will still be able to enter the rock steady state. This theoretical system of representative characters Labuxiweici, Miller-Feiqieer, Fenner - Daluobo and Kashitenai others. This is a more modern theory, it is already out of the ground works to consider the ideas, and underground works closer to reality, the past 50 years has been widely accepted and applied. demonstrated broad development prospects.

Can be seen from the above, the former theory more attention to the findings and the results of treatment : The latter theory is even more attention to the process and the control of the process, right from the rock for the full utilization of capacity. Given this distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representation method.

2. NATM

NATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countries alleged to observe the dynamic design and construction of the basic principles.

NATM concept of filibustering Xiweici Austria scholars in the 20th century, Professor age of 50. It was based on the experience of both the tunnel and rock mechanics theory, will bolt and shotcrete combination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical and theoretical study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground works with a very rapid development, have become modern tunnels new technologies landmark. Nearly 40 years ago, the railway sector through research, design, construction combining, in many construction of the tunnel, according to their own characteristics successfully applied a new Austrian law, made more experience, have accumulated large amounts of data, This is the application stage. However, in the road sector NATM of only 50%. Currently, the New Austrian Tunneling Method almost become weak and broken rock section of a tunnel construction method, technical and economic benefits are clear. NATM the basic points can be summarized as follows : (1). Rock tunnel structure is the main loading unit, the construction must fully protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. To

this end, the construction of sub-section should not block too much, excavation should be used smooth blasting, presplit blasting or mechanical tunneling.

(2). In order to give full play to rock the carrying capacity should be allowed to control and rock deformation. While allowing deformation, which can be a rock bearing ring; The other hand, have to limit it, Rock is not so lax and excessive loss or greatly reduced carrying capacity. During construction should be used with rock close to, the timely building puzzle keeps strengthening Flexible support structure, such as bolting and shotcreting supporting. This adjustment will be adopted supporting structural strength, Stiffness and its participation in the work of the time (including the closure of time) to control the deformation of the rock mass.

(3). In order to improve the support structure, the mechanical properties, the construction should be closed as soon as possible, and to become a closed cylindrical structure. In addition, the tunnel shape with a round should, as far as possible, to avoid the corner of the stress concentration.

(4). Construction right through the rock and supporting the dynamic observation, measurement, and reasonable arrangements for the construction procedures, changes in the design and construction management of the day-to-day.

(5). To lay waterproof layer, or is subject to bolt corrosion, deterioration of rock properties, rheological, swelling caused by the follow-up to load, use composite lining.

(6). Lining in principle, and the early rock deformation Supporting the basic stability of the conditions under construction. rock and supporting structure into a whole, thereby improving the support system of security.

NATM above the basic elements can be briefly summarized as : "less disturbance, early spray anchor, ground measurements, closed tight."

3.With a spring to understand the principle NATM

(1). Cavern brink of a point A in the original excavation ago with stress (stress self-respect and tectonic stress) in a state of equilibrium. As an elastic stiffness of the spring K, P0 under compression in a state of equilibrium.

(2). Cavern excavation, A point in attacking lose face constraints, the original stress state to be adjusted, if the intensity of rock big enough, After less stress adjustments may cavern in a stable condition (without support). But most of the geological conditions of the

poor, that is, after the stress cavern adjustments, such as weak protection, we could have convergence deformation, even instability (landslides), must be provided to support power PE, in order to prevent landslides instability. Equivalent to the Spring of deformation u, in the role of PE is now in the midst of a state of equilibrium.

(3). By the mechanical balance equation, we can see in the spring P0 role in a state of equilibrium; Spring in the event of deformation u, PE in the role they will be in equilibrium, assuming spring elasticity of K, were : P0=PE+Ku

Discussion :

(1) When u = 0, that is not allowed P0=PE rock deformation, is a rigid support, not economic;

(2) when u ↑, PE ↓; When u ↓, PE ↑. That is, rock deformation occurred, the release of some of the load (unloading), we should allow some extent rock deformation, to give full play to rock the capacity for self. Is an economic support measures, the rock self-stability P=P0-PE=Ku;

(3) When u=umax, landslides, have relaxation load and unsafe.

4. Points

(1). Rock cavern excavation is affected by that part of rock (soil) body, the rock is a trinity : have a load bearing structure, building materials.

(2). Tunnel construction is in the rock stress is of special architectural environment, which can not be equated with the construction on the ground.

(3). Tunnel structure rock + = bracing system.

II. The new Austrian highway construction in the basic method

NATM one of the characteristics is the scene monitoring, measurement information to guide construction, through the tunnel construction measure receipts and excavation of the geological observation for prediction and feedback. And in accordance with the established benchmark for measuring the tunnel construction, excavation section steps and sequences, Supporting the initial parameters for reasonable adjustments to guarantee the safety of construction, a tunnel rock stability, the quality of the project and supporting structure of the economy and so on. The author of commitments (Chengde) Chek (Chifeng) East Maojingba Tunnel NATM basic construction method for investigation concluded, synthesis of a new

highway tunnel Natm the selection of different types and the basic characteristics of the construction methods and tips.

1.A tunnel construction method of choice tunnel construction method of choice, mainly based on the engineering geological and hydrogeological conditions Construction, rock type, buried deep tunnel, the tunnel section size and length lining types, Construction should be the premise of safety and engineering quality at the core, and with the use of the tunnel function, the level of construction technology, Construction machinery and equipment, time requirements and economic feasibility of factors to consider in selection.

When choosing the method for tunnel construction on the surrounding environment negatively affected, should also be a tunnel, the environmental conditions as the method to choose one of the factors, taking into rock changes the method and the applicability of the possibility of change. Tunnel project to avoid mistakes and unnecessary increase investment in public works. NATM new construction, we should also consider the entire process of construction of auxiliary operations and changes in the surrounding rock to measure control methods and the tunnel through special geological lots of construction means for a reasonable choice.

2. New Austrian Tunneling Method program New Austrian Tunneling Method used all methods can be divided into sections, Division level and the three major types of excavation method and some changes in the program.

(1) Full-face method. That whole section excavation method is based on the design of an excavation face excavation molding. Excavation order is its full face excavation, steel bracing, pouring concrete lining. Often choose to IV-VI Class Rock Hard Rock Tunnel, which can be used blasting deep hole.

Excavation whole section of the law is a larger space operations, introducing supporting large mechanized operations, improving the speed and process small, less interference and facilitate the construction organization and management. Excavation is due to shortcomings in the larger, lower relative stability of rock, and with each cycle of the relatively large workload, it requires the construction units should have a strong excavation, transport and slag out and support capability, Maojingba VI : Class V rock used in the full-face excavation to achieve the desired results.

Full-face excavation face, drilling and blasting construction more efficient use of deep focus to accelerate the excavation blasting speed, and the rock blasting vibration frequency less conducive to a stable transfer rocks. The drawback is every deep hole blasting vibration larger. Therefore require careful drilling and blasting design and strict control of blasting operations.

Full-face excavation method is the main process : the use of mobile carts (or platforms), the first full-face a bored, and installed a line, and then drilling platform car outside 50m back to a safe place and then detonate, Blasting to make a shape out after drilling Jardine car again moved to the excavation face in place, began a cycle of drilling and blasting operations, Anchor sprayed simultaneously supporting or after the first arch wall lining.

(2) step method. Step method of design is generally divided into sections on the half-section and the lower half section two excavation molding. Excavation order is its first half excavation arch bolt jet concrete bracing, arch lining, the central part of the second half of excavation, sidewall of excavation, concrete wall jet bolt support and lining. The more applicable to the II, III and soft joint development of the surrounding rock, which were used Tim change program.

Long-step method : The next stage distance away, on the general level above 50m ahead, Construction can be assigned to the Department of next larger machine with parallel operations, when mechanical deficiencies can be used interchangeably. When the case of a short tunnel, the upper section will be all dug later, and then dug under the section, the construction of which less interference, single process can work.

Short step method : on the stage length 5-50m apply to Ⅱ, Ⅲrock can be shortened Invert closing time, Supporting improve early stress conditions, but larger construction interference, in the event of Soft Rock need to consider carefully, Auxiliary shall be applied measures to stabilize the excavation excavation face, in order to ensure the safety of construction.

Ultrashort step method : The only step ahead 3-5m, section closed faster. The method used for the high level of mechanization of various rock section, in the event of the siege soft rock when required careful consideration. Auxiliary shall be applied measures to stabilize the construction excavation face to ensure the safety of construction.

Excavation level of character is the first step to using light excavation drilling machine drill a hole, rather than through large drilling platform car. Two step method of excavation operations with sufficient space and a faster rate of construction. Level is conducive to the stability of excavation face. Especially Excavation in the upper, lower operational safety. Three step method of excavation is the next shortcomings of operations interfere with each other. It should be noted at the bottom of the upper operational stability, level of excavation will increase the number of country rock.

(3) Segment excavation method. Excavation Law Division can be divided into five changes in the program : Excavation Division level, from top to bottom hole lead, heading advance on the excavation, single (double) and lateral pit method. Excavation will be conducted Section Division excavation by the Ministry of shape, and to advance some of excavation, it may be called derivative ahead excavation pit method.

Law Division level : general application or soil collapse easily lots of soft rock, with its advantages - stage method, height can be lengthened, the two-lane tunnel for a hole-fold, cycling Road Tunnel - hole 2 times; rather than single (double) PENDANTS Heading a high degree of mechanization, can accelerate the progress of the projects.

The next heading advance excavation method (that is guided pit wall first arch) : This Act applies to Ⅱ, Ⅲrock. in the soft ground tunneling, to be adopted next general guide advance excavation pit wall first arch Act. Its advantages are : Heading advance excavation, the use of proven geological conditions in advance to facilitate change in the method. Face to facilitate started procedures applicable to the labor arrangements for the use of small machinery and construction. The drawbacks : The next section will guide small, slow construction and construction processes more, construction and management difficult.

Unilateral-arm pit Law : rock instability, the tunnel span larger, ground subsidence is difficult to control when using this method. Its characteristics are : a positive step and arms Heading Act advantages.

Bilateral arm Heading law : in large-span shallow tunnels, surface subsidence require strict, especially poor rock used. Advantages of this method are : Construction of safe, reliable, but slow construction, high cost.

III.The main tunnel construction technology

1. Cave construction :

(1)excavation slope around :

Lofting total station measurements, the use of excavators from top to bottom, paragraph by paragraph excavation, not the amount of excavation or the end of next overlapping excavation, remove pits with the above may slump topsoil, shrubs and rock slopes, rock strata of slope excavation needs blasting, Discussion should focus mainly loose blasting. Also partial artificial finishing, when excavation and inspection slope of slope, if sliding and cracking phenomenon and slowing down due slope.

(2).Cheng Tung-supporting :

Yang Brush Singapore Singapore after the completion of timely inspection plate slope gradient, the gradient to pass the inspection, the system set up to fight time anchor, and the exposed bolt heads, hanging metal based network expansion and bolt welding into first overall. Linked network immediately after the completion of shotcrete and repeatedly jet until it reaches the thickness of the design so far.

(3).as of gutter construction :

Yang slope away from the groove 5 meters excavation ditch interception, interception gutter mainly mechanical excavation, artificial finishing, after dressing, 7.5# immediately masonry made of mortar and stones, and the floor surface with mortar.

2. Auxiliary construction :

(1)A long pipe roof :

Sets arch construction : construction Lofting, template installation, assembling reinforcement, the guidance of lofting 127 installation guide, concrete pouring.

Pipe specifications : Heat Nazarbayev Seamless Steel Tube ¢108 mm and a thickness of 6 mm, length of 3 m, 6 m;

N pipe from : Central to the distance 50 cm;

N Inclination : Elevation 1 ° (the actual construction works by 2 °), the direction parallel with the Central Line;

N pipe construction error : Radial not more than 20 cm;

N tunnel longitudinal joints within the same section with more than 50% adjacent pipe joints staggered at least a meter.

A. pipe roof construction method :

Lofting accurate measurement personnel, marking the centerline and the vault out of its hole elevation, soil excavation reserved as a core pipe roof construction work platform Excavation footage of 2.5 meters, after the end of excavation, artificial symmetrical on both sides of excavation (Commodities H) platform, level width of 1.5 meters, 2.0 meters high, as construction sets and pipe arch shed facilities drilling platform. Pipe-roof design position should be and it should be a good hole steel tube, grouting after playing non-porous tube steel, non-porous tube can be used as pipe inspection, Grouting quality inspection, drill vertical direction must be accurately controlled to guarantee the opening hole to the right, End each drilling a hole is a pipe jacking, drilling should always use dipcompass drilling pipe measuring the deflection, found that the deflection over design requirements in a timely fashion. Pipe joints using screw connection, screw length 15 cm, to stagger the pipe joints, odd-numbered as the first section of the introduction of three-meter steel pipes and even numbered the first section of pipe using 6 meters, After each have adopted six-meter-long steel pipe.

B. pipe roof construction machinery :

N drilling machinery : XY-28-300 equipped with electric drill, drilling and pipe jacking long shelf;

N grouting machine : BW-250/50-injection pump two Taiwan;

N using cement-water glass slurry. Mud and water volume ratio 1:0.5; water glass slurry concentration of water-cement ratio 1:1 silicate 35 Baume; The efficacy silicate modulus pressure grouting pressure early pressure 2.0MPA 0.5~1.0MPA; end.

(2). a small catheter

A. small catheter used ahead diameter of 42 mm and a thickness of 3.5 mm thermal Nazarbayev seamless steel tubes, steel pipe was front-tip, Welding on the tail ¢6 stiffening brace and the wall around the drilling hole grouting 8 mm, but the tail of a meter without grouting holes and Advance Construction of a small catheter, the tubes and the lining of the centerline parallel to 10 ° -30 ° Chalu into the rock arch. penstocks to 20-50 cm spacing. Each was over a steel tubes, should be closed immediately shotcrete excavation face and then grouting. After grouting, erecting steel Arch, Supporting the early completion of every (2-3 meters, and the paper attempts to be) another one for steel tubes, Advance small catheter general lap length of 1.0 meters.

B. Grouting parameters :

N water slurry and water glass volume : 1:0.5;

N slurry water-cement ratio 1:1

N 35 Baume concentration of sodium silicate; The efficacy silicate modulus

N grouting pressure 0.5~1.0MPA; if necessary, set up only orifice Pulp Cypriots.

(3). bolting ahead : The Chalu must be greater than 14 degrees, grouting satiated and lap length is not less than 1 meter.

3.Correcting construction :

Embedded parts used by the Design Dimensions plank make shape design, installation in contrast snoop plate car, and position accuracy (error ± 50CM), the firm shall not be fixed, you must be in possession of the wire through the middle wear.

4. Leveling Construction

Installation templates, at the request of both sides leveling layer calibration position to install template. Side-channel steel templates used [10#, top elevation with a corresponding length of the road elevation unanimously to allow deviation ±2mm. adjusted using the standard measurement to determine elevation. Every template fixed a certain distance from the outside to ensure that no displacement, the joints template close comfort, not from a slit, crooked and formation, and the bottom connector templates are not allowed to leak plasma. Concrete before reperfusion, the bottom surface of concrete must be clean. When the concrete arrived at the construction site directly installed backward mode of the road bed, and using artificial Huabu uniform. Concrete paver should be considered after the earthquake destroyed the settlement. Unrealistically high can be 10% higher, Lan is the surface elevation and design line. Concrete earthquake destroyed at or anywhere near the corner with plug-Lan Lan pound for pound order; Flat-Lan pound for pound crisscross comprehensive Lan, Inside each location is no longer the time for concrete sinks, no longer emitted large bubbles, and the surface of cement mortar later. normally no less than 15 seconds, also should not be too long; Then Chun-pound beam along the longitudinal Lan-pound trailer, With redundant Chun-pound concrete beams were dragged shift Trim, Dixian Department should keep leveling Lan facts. Finally, the diameter 75~100mm rolling seamless steel pipe for further leveling. Just do prohibited in the surface spraying water, and threw cement.

5. Water, cable duct construction

领导风格外文翻译文献

领导风格外文翻译文献 (文档含中英文对照即英文原文和中文翻译) 原文: 1. Introduction The leadership in organizing a government so far has tended to be only one leadership style for all employees’ abilities, namely instruction leadership style, so it has impacted and caused low-level service performance, [1]. An ofiicer’s leadership is no more than as a power figure, who is highly chained by formal rules. So, there is no possibility for appreciations to occur. The implication which occurs toward human resources of employees is that there is a strong tie with formal rules, so there is no room for employees to take initiatives, innovative actions, and to make significant development. Therefore, the time has come for the single-style bureaucratic leadership style orientation to change into the situational leadership style, a style based on situations and conditions of the subordinate/employees’ abilities. Besides the leadership style, the officer’s motivation also plays an important role in achieving high performance because it is related with :

施工组织设计外文翻译

摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工

土木工程外文翻译隧道与地下空间技术

隧道与地下空间技术 2006 年 5-7 月刊,第 21 期,章节 3-4,第 332 页 釜山——巨济的交通系统:沉管隧道开创新局面 1 1Wim Janssen Peter de Haas Young-Hoon Yoon 荷兰隧道工程顾问:大宇工程建设公司釜山—巨济交通线隧道工程技术顾问 韩国大宇工程建设公司摘要 釜山—巨济交通系统将会为釜山和巨济两岛上的大城市提供一条道路连接。该沉管隧道有许多特点:长度达到千米,处于水下 35 米处,海况条件严峻、地基土较为软弱和线型要求较高。基于以上诸多特点,隧道的设计和建造面临着巨大的挑战。可以预见的是这项工程将会开创沉管隧道施工技术的新局面。本文突出论述了这些特点以及阐述在土木和结构方面的问题。1.工程简介 釜山是韩国的第二大城市和一座重要的海港。它位于韩国的东南部,其南面和东面朝向朝鲜海峡同时在釜山北部山势较为陡峭。该市发展迅速,近年来的人口增长超过 370 万(总计 460 万人)。人口密度达到 4850 人/km2,约为香港的 3/4。釜山市的进一步发展由于其所处的地理位置而受到限制。釜山—巨济交通系统在釜山和巨济岛之间创造了一条直接的联系线,以从客观上满足釜山的城市扩展,在巨济岛上发展工业区,以及为釜山市民在较短的行车距离内增加休闲娱乐的去处。巨济岛西侧目前已经与朝鲜半岛相连,在本项连接工程完工之后,从釜山市到巨济岛的驾车时间将由原来的 2 小时缩短为现在的 45 分钟。釜山—巨济交通系统将在巨济岛与 Gaduk 岛之间提供一条连接,使其成为连接釜山新港地区至巨济岛的双重高速公路体系的一部分。这一系统总计公里长,穿越海峡并将Daejuk Jungjuk 和 Jeo 三个无人小岛连接在一起。原则上该系统由一条长度为 3240m 的双向四车道沉管隧道和两座主跨 475,两边跨 230m 的斜拉桥组成。2.规划组织该项目是作为一个公私合作,共同建设的工程,GK 交通系统公司可获得设计、施工和运营的特许权,经营期限为 40 年。特许权基于该系统设计理念的一个环节。GK 交通系统公司由大宇工程建设公司领衔的 7 家特许权法人组成。TEC/Halcrow 等合资公司作为技术顾问,从工程开始便参与该项工程。Halcrow 与 TEC 两个合资公司分别负责关于桥梁和隧道建设方面的技术问题。永久设施的设计工作已接近完成,后续的建设的准备工作也已经开始。图 1. 工程地理位置图 2. 空中鸟瞰效果图设计要求和基本闲置因素该项目将 Gaduk 岛与巨济岛经 Daejuk Jungjuk and Joe island 三个小岛连接在一起,基本布局由三条航道的要求决定。位于 Gaduk 岛和 Daejuk 岛之间的主航道宽 1800m, 18m。 深由于这条航道没有官方的水深规定,因此选择以隧道的方式穿越成为一种可行的方案。另外两条位于 Jungjuk—Jeo 岛和 Joe—巨济岛的次级航道,最小宽度分别为435m 和 404m,各自的通航净空要求分别为 52m 和 36m。两条次级航道的水深均为 16m。鉴于 Daejuk 岛和 Gaduk 岛之间相对较为陡峭的海岸,开挖作业又是在海床以下 25至 30 米处,这就使得工程无法满足两岛之间的对准开挖。而为了驾驶的舒适与安全又不得不延长梯度线和坡长。因此,将穿越该水域的沉管隧道设置在略低于海床平面成为一个合理的选择。图 3. 线路纵剖面图岩土条件 地层在隧道线路方向上呈现出不同但是在纵向自上而下依次为典型的海洋粘土、海砂、砾卵石和海床基岩。 在沉管隧道沿线的海床主要以海洋粘土为主,除了在海岸线附近露出地表的海床、

浅谈华为公司的领导风格

沈阳理工大学应用技术学院题目:浅谈华为公司的领导风格 姓名 院(中心、所)经济管理学院 学号 年级2011级 专业工商管理 考试科目组织行为学 考试时间 考试分数 教师签字

目录 摘要···························································· 1.华为公司领导者的介绍 0 2.任正非的领导风格 0 2.1低调 0 2.2狼性精神 (1) 2.3用毛泽东兵法治商 (1) 2.4危机管理理念 (2) 3.任正非的领导秘诀 (2) 3.1“一法”——《华为基本法》——明确的发展纲领·2 3.2“两制”——规范的HR机制、严密的运营机制 (3) 3.3朴实无华的宣教 (3) 4.结束语 (3) 参考文献: (4) 摘要 领导是管理的重要的职能,领导的水平的高低常常决定着组织的生存死亡。领导的有效性是组织成败的关键。领导者身负组织领导的重任,其思想观念、心理素质和特殊心理机制,不仅影响到个人工作的成效,更影响到其部署和群体作用的发挥乃至整个组织的行为绩效。领导的本质是影响力,即对一个组织、一个群体或一些人的行为与观念是施加影响的过程。领导能力意味着影响着团队中成员的发展、留任和激发成员的能力,具有魅力的领导有能力将其自身的价值观与其下属的相统一,他能够影响其下属视其为了集体的利益而舍弃自身的利益。具有魅力的领导,可以激发团队的成员对于团队的项目的热情、发展其忠诚度,建立成

员们的自信和承诺,领导者将成为影响团队效率的楷模。关键词:领导者;华为公司;任正非;领导风格

1.华为公司领导者的介绍 正所谓“上梁不正下梁歪”,作为一个领导者不能起到楷模作用,那么他的下属也只能成为乌合之众,不能有所作为,领导者的领导风格对下属和团队将产生重要的影响。华为公司的创始人任正非出生在贵州的一个贫困的小村庄,任正非虽然生在农村,但他从小就开始接受教育,可谓“贫贱不能移”,任正非凭借着其才能和智慧以及对知识的孜孜不倦的追究,使他进入一个技术密集型行业。1978年,任正非从部队转业,以2万元注册资本创办了深圳华为技术有限公司,现任华为有限公司的总裁。公司主营电信设备,发展迅猛,成为中国市场GSM设备、交换机产品及接入系统的佼佼者。2000年他被美国《福布斯》杂志评选为中国富豪第三位。个人财产估计为5亿美元。2005年他入选《时代周刊》全球“建设者与巨子”100名排行榜,他是中国唯一入选的企业家。同一档为有美国的苹果电脑公司董事长及首席执行官乔布斯、传媒大亨默多克、俄罗斯石油巨头阿布拉莫维奇、2011年任正非以11亿美元首次进入福布斯富豪榜,排名全球第1056名,中国第92名。在《财富》中文版第七次发布中,位居“中国最具影响力的商界领袖”榜单之首。 2.任正非的领导风格 2.1低调 低调的人做有高度的事业。木秀于林,风必摧之,故老子云:“夫唯不争,故天下莫能与之争”,不争者胜天下。任正非深谙这道理,为人处世一向低调。他对各种采访、会议、评选都躲得远远的,不论是直接有利于华为形象的宣传活动,还是政府的活动,或者令许多商界精英趋之若鹜的媒体盛世,他都统统拒绝。他向华为高层发下死命令:“除非重要客户或合作伙伴,其他活动一律免谈,谁来游说我,我就撤谁的职。”人们几乎没有看过他在电视屏幕上登场亮相,也几乎没有听到过他激情的演讲。任正非一贯的追求是“做事业,做有高度的事业”。唯有练好内功,方可与对手论高下。“桃李不言,下自成蹊”,就是这样,也许唯

土木工程外文文献翻译

专业资料 学院: 专业:土木工程 姓名: 学号: 外文出处:Structural Systems to resist (用外文写) Lateral loads 附件:1.外文资料翻译译文;2.外文原文。

附件1:外文资料翻译译文 抗侧向荷载的结构体系 常用的结构体系 若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。确实,较好的高层建筑普遍具有构思简单、表现明晰的特点。 这并不是说没有进行宏观构思的余地。实际上,正是因为有了这种宏观的构思,新奇的高层建筑体系才得以发展,可能更重要的是:几年以前才出现的一些新概念在今天的技术中已经变得平常了。 如果忽略一些与建筑材料密切相关的概念不谈,高层建筑里最为常用的结构体系便可分为如下几类: 1.抗弯矩框架。 2.支撑框架,包括偏心支撑框架。 3.剪力墙,包括钢板剪力墙。 4.筒中框架。 5.筒中筒结构。 6.核心交互结构。 7. 框格体系或束筒体系。 特别是由于最近趋向于更复杂的建筑形式,同时也需要增加刚度以抵抗几力和地震力,大多数高层建筑都具有由框架、支撑构架、剪力墙和相关体系相结合而构成的体系。而且,就较高的建筑物而言,大多数都是由交互式构件组成三维陈列。 将这些构件结合起来的方法正是高层建筑设计方法的本质。其结合方式需要在考虑环境、功能和费用后再发展,以便提供促使建筑发展达到新高度的有效结构。这并

不是说富于想象力的结构设计就能够创造出伟大建筑。正相反,有许多例优美的建筑仅得到结构工程师适当的支持就被创造出来了,然而,如果没有天赋甚厚的建筑师的创造力的指导,那么,得以发展的就只能是好的结构,并非是伟大的建筑。无论如何,要想创造出高层建筑真正非凡的设计,两者都需要最好的。 虽然在文献中通常可以见到有关这七种体系的全面性讨论,但是在这里还值得进一步讨论。设计方法的本质贯穿于整个讨论。设计方法的本质贯穿于整个讨论中。 抗弯矩框架 抗弯矩框架也许是低,中高度的建筑中常用的体系,它具有线性水平构件和垂直构件在接头处基本刚接之特点。这种框架用作独立的体系,或者和其他体系结合起来使用,以便提供所需要水平荷载抵抗力。对于较高的高层建筑,可能会发现该本系不宜作为独立体系,这是因为在侧向力的作用下难以调动足够的刚度。 我们可以利用STRESS,STRUDL 或者其他大量合适的计算机程序进行结构分析。所谓的门架法分析或悬臂法分析在当今的技术中无一席之地,由于柱梁节点固有柔性,并且由于初步设计应该力求突出体系的弱点,所以在初析中使用框架的中心距尺寸设计是司空惯的。当然,在设计的后期阶段,实际地评价结点的变形很有必要。 支撑框架 支撑框架实际上刚度比抗弯矩框架强,在高层建筑中也得到更广泛的应用。这种体系以其结点处铰接或则接的线性水平构件、垂直构件和斜撑构件而具特色,它通常与其他体系共同用于较高的建筑,并且作为一种独立的体系用在低、中高度的建筑中。

施工组织设计外文翻译

XXXXXXXXX 毕业设计(论文)外文翻译 学生姓名: 院(系): 专业班级: 指导教师: 完成日期:

施工组织设计的重要性 摘要: 建筑工程在施工过程中,施工组织方案的优劣不仅直接影响工程的质量,对工期及施工过程中的人员安全也有重要影响。施工组织是项目建设和指导工程施工的重要技术经济文件。能调节施工中人员、机器、原料、环境、工艺、设备、土建、安装、管理、生产等矛盾,要对施工组织设计进行监督和控制,才能科学合理的保证工程项目高质量、低成本、少耗能的完成。 关键词: 项目管理施工组织方案重要性 施工组织设计就是对工程建设项目整个施工过程的构思设想和具体安排,是施工组织管理工作的核心和灵魂。其目的是使工程速度快、质量好、效益高。使整个工程在施工中获得相对的最优效果。 1.编制施工组织设计重要性的原因 建筑工程及其施工具有固定性与流动性、多样性与单件性、形体庞大与施工周期长这三对特点。所以,每一建筑工程的施工都必须进行施工组织设计。这是因为:其它一般工业产品的生产都有着自己固定的、长期适用的工厂。而建筑施工具有流动性的特点,不可能建立这样的工厂,只能是当每一个建筑工程施工时,建立一个相应的、临时性的,如同工厂作用性质的施工现场准备,即工地。施工单件性特点与施工流动性特点,决定了每一建筑工程施工都要选择相应的机具和劳动力组织。选择施工方法、拟定施工技术方案及其劳动力组织和机具配置,统称为施工作业能力配置。施工周期的特点,决定了各种劳动力、机具和众多材料物资技术的供应时间也比较长,这就产生了与施工总进度计划相适应的物资技术的施工组织设计内容。由此可见,施工组织设计在项目管理中是相当重要的。 2.施工组织设计方案的重要性 建筑产品作为一种商品,在项目管理中工程质量在整个施工过程中起着极其重要的作用。工程建设项目的施工组织设计与其工程造价有着密切的关系。施工组织设计基本的内容有:工程概况和施工条件的分析、施工方案、施工工艺、施工进度计划、施工总平面图。还有经济分析和施工准备工作计划。其中,施工方案及施工工艺的确定更为重要,如:施工机械的选择、水平运输方法的选择、土方的施工方法及主体结构的施工方法和施工工艺的选择等等,均直接影响着工程预算价格的变化。在保证工程质量和满足业主使用要求及工期要求的前提下,优化施工方案及施工工艺是控制投资和降低工程项目造价的重要措施和手段。 2.1施工组织方案在很大程度上影响着工程质量,因此合理的施工组织方案 不仅是确保工程顺利完成的基础,也是工程安全的依据。施工组织设计是建筑工程设计文件的重要组成部分,是编制工程投资概预算的主要依据和编制招投标文件的

桥梁结构设计外文文献翻译

桥梁结构设计外文文献翻译 (文档含中英文对照即英文原文和中文翻译) 结构设计 Augustine J.Fredrich 摘要:结构设计是选择材料和构件类型,大小和形状以安全有用的样式承担荷载。一般说来,结构设计暗指结构物如建筑物和桥或是可移动但有刚性外壳如船体和飞机框架的工厂稳定性。设计的移动时彼此相连的设备(连接件),一般被安排在机械设计领域。 关键词:结构设计结构分析结构方案工程要求 Abstract: Structure design is the selection of materials and member type ,size, and configuration to carry loads in a safe and serviceable fashion .In general ,structural design implies the engineering of stationary objects such as buildings and bridges ,or objects that maybe mobile but have a rigid shape such as ship hulls and aircraft frames. Devices with parts planned to move with relation to each other(linkages) are generally assigned to the area of mechanical . Key words: Structure Design Structural analysis structural scheme Project requirements Structure Design Structural design involved at least five distinct phases of work: project requirements, materials, structural scheme, analysis, and design.

有关隧道方面外文文献与翻译

A convection-conduction model for analysis of the freeze-thaw conditions in the surrounding rock wall of a tunnel in permafrost regions HE Chunxiong( 何春雄 ), (State Key Laboratory of Frozen Soil Engineering, Lanzhou Institute of Glaciology and Geocryology, Chinese Academy of Sciences, Lanzhou 730000, China; Department of Applied Mathematics, South China University of Technology, Guangzhou 510640, China) WU Ziwang( 吴紫汪 )and ZHU Linnan( 朱林楠 ) (State key Laboratory of Frozen Soil Engineering, Lanzhou Institute of Glaciology and Geocryology Chinese Academy of Sciences, Lanzhou 730000, China) Received February 8, 1999 Abstract Based on the analyses of fundamental meteorological and hydrogeological conditions at the site of a tunnel in the cold regions, a combined convection-conduction model for air flow in the tunnel and temperature field in the surrounding has been constructed. Using the model, the air temperature distribution in the Xiluoqi No. 2 Tunnel has been simulated numerically. The simulated results are in agreement with the data observed. Then, based on the in situ conditions of sir temperature, atmospheric pressure, wind force, hydrogeology and engineering geology, the air-temperature relationship between the temperature on the surface of the tunnel wall and the air temperature at the entry and exit of the tunnel has been obtained, and the freeze-thaw conditions at the Dabanshan Tunnel which is now under construction is predicted. Keywords: tunnel in cold regions, convective heat exchange and conduction, freeze-thaw. A number of highway and railway tunnels have been constructed in the permafrost regions and their neighboring areas in China. Since the hydrological and thermal

全球领导力文献综述与分析

全球领导力文献综述与分析 2014年02月25日17:53 来源:《领导科学》(郑州)2012年11(中)期作者:李云飞字号 打印纠错分享推荐浏览量【作者简介】李云飞,天津商业大学F2U合作学院。 一、全球领导力的定义 全球领导力在世界范围内是个热门话题,同传统的领导力一样,始终没有一个被所有人认可的定义。研究全球领导力的专家学者根据各自的经验、不同的文化背景从不同的视角给出了不同的定义。 最初全球领导力的概念是借鉴进而延伸传统的国内领导力而来的(Yeung and Ready,1995),但是学者们很快意识到由于全球竞争的不定性和多种压力,全球领导力远比国内领导力复杂,这种不定性和压力增加了领导者的工作范围(Weber,1998)。Adler(2001)阐明了这个问题:“全球领导力不同于国内领导力,它涉及人与人之间的相互作用和不同文化之间的观念,而不仅仅是指领导者在本国特定的领导风格的有效性,也不是比较不同国家的不同领导方式……” 有些学者是从跨文化视角定义全球领导力的。Dorfman(2003)将全球领导力定义为一种跨越地理和文化边界的影响,并且这种影响不局限于全球化事物,也不局限于个人及其知识、技能和能力,也不局限于组织中的CEO。Carey等(2004)提出,全球领导力能够跨越地理和文化的边界以激发组织成员共同的愿景、促进合作的决策、适应全球变化浪潮、激励和授权多样化的员工队伍。 Mendenhall(2011)对全球领导者和领导力做了广义的界定:全球领导者是指那些通过建立在相互信任基础上的有效沟通而在组织中产生重大正量改变,在跨界利益相关者、外部权力机构的不同来源,以及在当时复杂的地理和文化条件下建立有效的组织结构和程序的领导者。 基于以上不同的定义,笔者认为,全球领导力概念的核心就是多元化,包括文化、人力资源、地理等。不同范畴的多样化增加了领导力环境的复杂性,因此,有效性成为全球领导力的终极目标。 二、研究历史回顾 领导力的研究在国际上可以追溯到1900年,距今已有100多年的历史了。在1900年至1940年期间,领导力研究致力于挖掘领导者独特的素质,最有代表性的是伟人理论,这个理论强调领袖是天生的,而不是制造的。根据Toyne和Nigh(1997)的研究,20世纪五六十年代国际商务的出现促使学者着手研究不同文化背景下的领导力以及不同文化对领导力的影响,然而这些研究并非当时国际商务研究的主流。 20世纪60年代,有些研究商业管理的学者开始关注管理跨国公司的相关问题,他们的研究促使人们对民族文化本质以及这些文化本质的不同对管理不同国家员工带来的影响有了更深刻的理解,这个研究量规被称作“比较管理”。这些学者把人类学文化框架扩展至商业应用领域,起到了开创性作用(Redding 1997;Schollhammer 1969)。

施工组织设计外文文献翻译最新译文

文献出处: Phillip Yetton. The Study of Construction Organization Design [J]. International Journal of Project Management, 2015, 9(2): 33-43. 原文 The Study of Construction Organization Design Author: Phillip Yetton Abstract Building construction is a complex work, huge building products, the production cycle is long, is a collection of architectural art, architecture, function, structure, decoration, water supply, power supply, intelligent system for a wind. Need to complete a project unit, type of work well together, and in the process of implementing, also under the influence of various subjective and objective conditions around. In order to meet the quality, cost, time limit for a project, under the premise of safety goal task to complete a project, must according to the requirement of the construction unit and the characteristics of the proposed construction project, the various raw materials on the basis of full investigation, compile an used to guide the whole process of technology, economy and management of project construction comprehensive document, this document is the construction organization Keywords: Construction; Organization design; Project cost 1 Introduction Construction organization design is a construction project for the object establishment, to guide the project bidding, construction contracts, construction preparation, construction installation until the whole process of the final acceptance of the technology, economy and management comprehensive document, is to ensure that project smooth implementation effective programmatic document. Construction organization design is proper or not, will directly relate to the quality of the proposed construction project, cost, time limit, safety, etc. The smooth realization of the intended target. With the development of The Times, modern engineering project scale and the demand is higher and higher, project management has become increasingly complex, and the construction organization design also put forward higher requirements. The construction organization design, construction organization

隧道施工外文翻译

超大型土压平衡式盾构在 隧道施工中引发的地面沉降分析 1 摘要: 使用盾构法进行隧道施工会导致隧道周边的土体位移和地面的沉降,这就使得估测土体的位移和沉降变得尤为重要了。由于之前已做过很多研究,所以在该领域已取得突破。然而,对于超大型土压平衡式盾构机在隧道施工中所引发土体移位与沉降的研究还很罕见,其原因是该工法在世界范围内很少被应用,但近年来,该工法已经在城市地下铁道运输结构的施工中有所应并且前景广阔。由于高含水地层中的切应力作用会使土体中产生超孔隙水压力。在盾构停止推挤土体后孔隙水会逐渐消散,土压力也会逐渐减小。而且,土质移位和地面沉降将会发生。与小型盾构机相比,上述现象在超大型土压平衡式盾构机施工中更为明显,原因就是它超大的开挖面面积。通过对监测数据和工程实际的隧道参数进行分析,可以发现盾构隧道施工参数对开挖面上土压力的影响规律和超孔隙水压力的大小。而且,通过调整隧道的开挖参数,可以减小地面沉降。盾构尾部的空隙填充量可以由反演算法与镜像法来确定。可以依据空隙量来调整注浆量以减少地面的沉降量。在上海的两个工程实例证明了这种方法在以后工程施工中的价值。 2 关键词 超大型土压平衡式盾构、盾构法隧道施工、地面沉降、镜像法 3 概述 盾构法隧道施工因其低噪音和对路面交通影响小的优点而被广泛的应用在城市地下隧道工程的施工中。但是,对原状土的扰动和土层损失将不会导致土层形变和地面沉降,而且会破坏建筑与结构的稳定。盾构法施工已被广泛研究以至于取得了许多的瞩目成就。但是超大型土压平衡式盾构在世界范围内很少被使

用,而且盾构施工过程中的土体沉降也少有被研究。在以往对其他类型盾构隧道施工研究中,有两方面被作为主要的研究对象,即开挖面和盾构尾部。首先,现在对于开挖面失效模式的研究重点主要在破坏区形状方面而不是在土压力和超孔隙水压力方面。实际上,后来提到的两方面对于地面沉降是很重要的,特别是在砂土和粉土地层中。相比于小型盾构机,超大型土压平衡式盾构机的大断面开挖会引发土压力和超孔隙水压力的更大影响。通过研究这两方面因素,超大型土压平衡式盾构开挖面的土压平衡机质会被揭示出来。其次,在盾构隧道的尾部后端形成的空隙会在施工过程中被同步注浆。但是,在绝大多数情况下,空隙是不会被完全充填的,之后则会导致地面沉降。当凝结开始后,同步注浆的体积会有所减少,隧道衬砌结构的形变和扰动土的固结被视为引发盾构尾部土体沉降的首要诱因。然而,由于空隙未被充填完全而导致的泥浆渗入周围土层则很少作引发盾构尾部土体沉降的诱因而被进一步研究。对于超大型土压平衡式盾构机施工而言,这一点尤为重要。而且,在确定同步注浆质量方面具有很高的实践价值。 4 开挖面的研究 4.1 超孔隙水压力在隧道盾构中的浮动原则 超大型土压平衡式盾构机的施工方法主要是在开挖面后的土压力与土舱中的土压力之间寻求一个平衡。土舱中的土压力在计算时要考虑水文地质和隧道的埋深,表达式为h p k γ0 =,其中P 是平衡土压力和开挖面前端土体压力而且包括水压力;γ是土层的平均重度可以取为m kN 30.18;h 是土舱内压力传感器的 埋置深度,k 0是土的侧压力系数,范围是0.75~0.90,并且根据地面沉降的监测数据进行调整。 超大型土压平衡式盾构施工中的平衡状态是理想状态。当封闭结构前端的土体被刀盘挤压时,这种理想的平衡就会在刀盘的敞开面形式。随着刀盘的旋转和向前不断推进,土压力与超孔隙水压力也会有所增加,在此之后超孔隙水压力就会形成了。该压力在后期会逐渐消散而且导致土体固结和地面沉降。在超孔隙水压力增大时,土质结构会被更严重的破坏;当超孔隙水压力消散后,土层固结与

毕设外文文献翻译

xxxxxxxxx 毕业设计(论文)外文文献翻译 (本科学生用) 题目:Poduct Line Engineering: The State of the Practice 生产线工程:实践的形态 学生姓名:学号: 学部(系): 专业年级: 指导教师:职称或学位: 2011年3月10日

外文文献翻译(译成中文1000字左右): 【主要阅读文献不少于5篇,译文后附注文献信息,包括:作者、书名(或论文题目)、出版社(或刊物名称)、出版时间(或刊号)、页码。提供所译外文资料附件(印刷类含封面、封底、目录、翻译部分的复印件等,网站类的请附网址及原文】 Requirements engineering practices A precise requirements engineering process— a main driver for successful software development —is even more important for product line engineering. Usually, the product line’s scope addresses various domains simultaneously. This makes requirements engineering more complex. Furthermore, SPL development involves more tasks than single-product development. Many product line requirements are complex, interlinked, and divided into common and product-specific requirements. So, several requirements engineering practices are important specifically in SPL development: ? Domain identification and modeling, as well as commonalities and variations across product instances Separate specification and verification for platform and product requirements ? Management of integrating future requirements into the platform and products ? Identification, modeling, and management of requirement dependencies The first two practices are specific to SPL engineering. The latter two are common to software development but have much higher importance for SPLs. Issues with performing these additional activities can severely affect the product line’s long-term success. During the investigation, we found that most organizations today apply organizational and procedural measures to master these challenges. The applicability of more formal requirements engineering techniques and tools appeared rather limited, partly because such techniques are not yet designed to cope with product line evelopment’s inherent complexities. The investigation determined that the following three SPL requirements engineering practices were most important to SPL success. Domain analysis and domain description. Before starting SPL development, organizations should perform a thorough domain analysis. A well-understood domain is a prerequisite for defining a suitable scope for the product line. It’s the foundation for efficiently identifying and distinguishing platform and product requirements. Among the five participants in our investigation, three explicitly modeled the product line requirements. The others used experienced architects and domain experts to develop the SPL core assets without extensive requirements elicitation. Two organizations from the first group established a continuous requirements management that maintained links between product line and product instance requirements. The three other organizations managed their core assets’ evolution using change management procedures and versioning concepts. Their business did not force them to maintain more detailed links between the requirements on core assets and product instances. The impact of architectural decisions on requirements negotiations. A stable but flexible architecture is important for SPL development. However, focusing SPL evolution too much on architectural issues will lead to shallow or even incorrect specifications. It can cause core assets to ignore important SPL requirements so that the core assets lose relevance for SPL development. Organizations can avoid this problem by establishing clear responsibilities for requirements management in addition to architectural roles. The work group participants reported that a suitable organizational tool for balancing requirements and architecture is roundtable meetings in which requirements engineers,

相关主题