1 目的Objective

对生产计划及进度进行控制,确保生产按计划顺利执行,确保能够按照顾客的要求

及时发运、交付产品。

The objective of this procedure is to control the production plan and progress, to ensure the successful implementation of production plan, and to ensure the timely shipment and deliv ery of products per the customer's requirements.

2 适用范围Applicable Scope

适用于本公司所有产品的生产安排。

This is applicable to the production planning of all AICQ products.

3 职责Responsibilities

3.1 生产计划员负责编制公司生产计划,部门经理负责审核。

The production planner is responsible to formulate the company production plan. The department manager is responsible for audit.

3.2 生产计划员按项目计划编制新产品试生产计划,批生产计划。

The production planner is responsible to formulate the trial production and batch production plan for the new product per the project plan.

3.3 生产计划员按制造部工艺验证、工装验证计划编制新产品、新工艺的工艺和工装验

证生产计划。

The production planner is responsible to formulate the process and tooling validation & production plan for the new product and new process based on the process validation and tooling validation plan of Manufacture Engineering Department.

4.工作程序Work Procedure

年生产计划的编制Formulation of Annual Production Plan

根据公司年度销售计划编制公司年度品种、产量生产计划(按年度、分月编制)。

Formulate annual production type & output plan (yearly but monthly based) in line with the annual sales plan of the company.

制造工程部每年在年销售计划完成后10天完成年度生产计划的编制工作。

Every year the Manufacture Engineering Department shall complete the formulation of the annual production plan within 10 days after the accomplishment of annual sales plan.

四个月滚动生产计划的编制Formulation of Four-Month Rolling Production Plan 根据市场销售部编制的4个月滚动分月销售计划,编制总成4个月滚动分月生产计划。

Formulate the four-month rolling production plan for assembly in line with the four-month rolling sales plan of the Marketing Department.

市场销售部每月20日前编制好4个月的滚动分月销售计划,提供给制造部作为编制生产计划的依据。

Before the 20th of each month, the Marketing Department is responsible to work out the four-month rolling sales plan, and provide it to the Manufacture Engineering Department as a reference to the formulation of the production plan.

通过生产排产会对下月生产进行综合能力的平衡,确定下月总成品种、产量计划作为生产计划员编制生产计划的最后依据。

The final factor for the production planner to compile the production plan is decided by the assembly type and volume plan for the next month after analysis and balance on the comprehensive production capability for the next month in the production arrangement meeting.

生产计划的编制Formulation of Production Plan

制造部根据市场销售部编制的4个月滚动计划中第一个月销售计划,车间和库房在制品数量,安全库存量、生产排产会确定的下月生产计划,编制品种、产量月度生产计划。

The Manufacture Engineering Department shall compile monthly type and output plan according to the first-month sales plan in the four-month rolling plan provided by the Marketing Department, the quantities of products under production in the workshops and warehouses, the safety inventory and the production schedule for the next month.

制造部每月24日编制好次月度分日总成品种、产量生产计划。

The Manufacture Engineering Department shall compile the day-based monthly production plan of assembly type, output production plan by the 24th of each month.

生产作业单的编制Formulation of Production Worksheet

生产计划员每天下午4:40分下达第二天总成装配生产作业单。各库房按生产作业单组织各种零部件、辅料、包装盒等物料。保证第二天总成装配。

The production planner will give the assembly production worksheet for the next day at 4:40 in the afternoon. The warehouses will prepare all the parts, components, auxiliary materials and packing materials against the production worksheet, ensuring the accomplishment of assembly tasks next day.

当物料不能满足生产作业单需求,生产计划员及时组织生产所需零件,通知外协外购员组织采购所需外协外购件,或调整生产品种,重新下达生产作业单。

When the material falls short of the requirement of the production worksheet, the production planner should organize immediately the production of parts in need, or inform the purchaser to buy the outsourced parts, or readjust the production type and re-issue the production worksheet.

当总成库存货物不能满足“发运信息单(客户订单)”保证发运,及时采取“应急计划”,调整生产作业单的计划,重新下达新的生产作业单。满足客户需要。

When the products in the assembly warehouse can't satisfy the shipment of goods as stated in the "Shipment Information Notice" or Customer Order, the "Contingent Plan" should be initiated to readjust the production worksheet and issue new production worksheet to live up to the customer's requirements.

4.5 编制生产计划的依据Foundation of the Production Plan Formulation

4.5.1市场销售部提供的销售计划和发运信息单。

The shipment information notice and the sales plan provided by the Marketing Department

4.5.2总成材料明细表、生产车间的设备明细、各种消耗定额、零件下料工艺和定额、包

装工艺和各种工艺文件,由制造部、工程技术部提供。

The assembly material breakdown, equipment list in the workshop, various consumption rating, parts ingredient process & rating, packing process and all other process documents, which are provided by the Manufacture

Engineering Department, Engineering & Technical Department and the Equipment Department

4.5.3各生产零件的生产工时定额、生产车间和班组人员,制造部提供。

The Manufacture Engineering Department will supply the fixed work hours for the various parts and personnel in the workshop and each work team.

4.5.4制造部、采购物流部、市场销售部对本部门当月实际完成情况和完成情况的预测,

由各部门每月25日报制造部生产计划员。

The actual accomplishment and the forecast for the current month of the Manufacture Engineering Department, the Purchase & Logistics Department and the Marketing Department will be provided to the production planner in the Manufacture Engineering Department by the 25th each month.

4.5.5每天销售数、交付数和库存结存数清单,每天9:00完成,由仓库管理员负责。每月

销售计划、销售计划完成、发交计划、发交计划完成和库存结存统计报表,每月26日由市场销售部负责。

The list of daily sales, delivery and inventory balance will be finished by the warehouse keeper at 9:00 each day. The monthly sales plan, accomplishment of sales plan and distribution and submission plans, the statistic summary of the inventory balance will be done by the 26th by the Marketing Department.

4.6 编制生产计划的项目和要求The Items and Requirements for Compiling the

Production Plan

4.6.1 编制制造部月度生产作业计划。

Formulation of the Monthly Production Operation Plan for the Manufacture Engineering Department

4.6.2 编制安全库存量。由生产计划员按4个月滚动计划编制。

The Formulation of Safety Inventory will be made by the production planner per the four-month rolling plan.

4.7 月度计划的平衡和调整The Balance and Readjustment of Monthly Plan

4.7.1 本月25日下达的月度分日计划,作为各部门为下月工作进行布置任务和实施工作

的依据。

The day-based monthly plan will be issued on the 25th in the current month as reference for the operation arrangement and implementation for the next month of different departments.

4.7.2 当销售计划发生变更,原生产计划不能满足销售计划的需要,生产计划员应及时调

整原生产计划,满足销售的需求。

When the sales plan changes and the original production plan can’t meet with the requirements of the sales plan, the production planner should adjust the production plan in time to meet with the requirements of sales.

4.7.3 当设备故障、其它因素造成原生产计划不能满足销售计划的需要,生产计划员应

及时调整原生产计划,满足销售的需求。

When the equipment breaks down or other factors which cause the original production plan can’t meet with the requirements of the sales plan, the production planner should adjust the production plan in time to meet the sales requirements.

4.8 生产计划的编制、审核、批准管理职责The Managerial Duties of Formulation,

Audit and Approval of the Production Plan

4.8.1 年度、4个月度滚动分月销售计划由副总经理、总经理批准下达到制造部。

The annual, four-month rolling sales plans are approved and issued by General Manager or the Deputy General Manager to the Manufacture Engineering Department.

4.8.2 生产计划员编制的4个月滚动分月生产计划,经制造工程部经理审核、副总经理或

总经理批准由制造工程部分发各相关单位作相关事宜之依据。月度分日生产计划由制造部经理审批后分发各相关单位执行。

The production planner compiles four-month rolling production plans, the manager of the Manufacture Engineering Department audits and the general manager or the deputy general approve and the Manufacture Engineering Department issues the relevant affairs to the relevant departments.

Four-month rolling production plans are handed out to the relevant department after they are reviewed by manufacture manage.

4.8.3 公司月度生产计划的调整由制造部申请上报,制造部经理审核,副总经理或总经理

批准,才可实行。

Prior to implementation, the adjustment of the monthly production schedule have to be reported by the Manufacture Engineering Department, audited by the manager in the Manufacture Engineering Department, and approved by the general manager or deputy general for approval.

4.9 生产计划完成情况的统计Statistics of the Accomplishment of the Production

Plan

4.9.1 制造工程部生产计划员负责生产计划完成情况的统计。

The production planner in the Manufacture Engineering Department is responsible for the statistic summary of the accomplishment of the production plan.

4.9.2 分年度、月度、日计划完成情况的统计工作,生产计划员负责。

The production planner is responsible for the daily, monthly and annual statistic summary of the accomplishment of the production plan.

4.9.3 各种生产计划和生产统计报表保存三年,生产计划员负责归档保存。

All the production plans and production statistic statements will be kept for 3 years. The production planner is responsible for the filing and management.

4.10 新产品生产计划New Product Production Plan

4.10.1 工程技术部下达新产品试生产进度计划、PPAP进度计划,制造部根据项目进度要求

下达新产品试生产计划、PPAP生产计划。各部门按计划要求执行。

Engineering & Technical Department will issue the new product trial production schedule and PPAP schedule, while the Manufacture Engineering Department will issue the new product trial production plan and PPAP production plan. Each department implements the plan.

4.10.2 工程技术部、制造部下达试生产进度计划、PPAP进度计划,制造部根据试生产、

PPAP计划进度要求下达新产品试生产计划、PPAP生产计划。各部门按计划要求执行。

Engineering & Technical Department and the Manufacture Engineering Department will issue trial production schedule plan and PPAP schedule plan.

The Manufacture Engineering Department will issue the new product trial production plan, PPAP production plan per the production and the requirements of PPAP schedule plan. Each department implements the plan.

5 相关文件Specific Documents

5.1 AICQ/QP-0301-00 《合同评审控制程序》

AICQ/QP-0301-00 “Contract Audit Control Procedure”

5.2AICQ/QP-0602-00 《采购控制程序》

AICQ/QP-0602-00 “Purchase Control Procedure”

6 质量记录Quality Record

6.1 AICQ/QR-0901-01 《4个月滚动生产计划》

AICQ/QR-0901-01 “Four-Month Rolling Production Plan》

6.2 AICQ/QR-0901-02 《月、分日滚动生产计划》

AICQ/QR-0901-02 “Daily and Monthly Rolling Production Plan”

6.3 AICQ/QR-0901-03 《生产作业单》

AICQ/QR-0901-03 “Production Worksheet”

6.4 AICQ/QR-0901-04 《年度(分月)生产计划完成情况统计表》

AICQ/QR-0901-04 “Statistics of Accomplishment of Annual (monthly-based)

Production Plan”

6.5 AICQ/QR-0901-05 《年度(分月)生产计划》

AICQ/QR-0901-05 “Annual (monthly-based) Production Plan”

文件更改履历表

文件更改履历表

文件管理程序中英文对照

德信诚培训网 更多免费资料下载请进:https://www.sodocs.net/doc/8517138402.html, 好好学习社区 Document Control Procedure 文件管理程序 1.0 Purpose 目的 Define the requirements and responsibilities for Document control. 定义出文件控制的要求和权责。 2.0 Scope 范围 This procedure applies to all QMS documentation, including: quality manual, procedure, WI, external document and form. 适用于与质量管理体系有关的所有文件。包括:手册、程序文件、操作指导书、外来文件及表单。 3.0 Definitions 定义 3.1 Quality Manual: According to the requirements of International and national standard (such as ISO9001), describe quality management system documentation in Co-active. 3.1质量手册:根据相关国际或国家标准(如ISO9001)要求,阐述本公司质量管理体系的文件。 3.2 Procedure: Define the function of QMS requirement allocation by department. Such as document control, management review, internal audit procedure. 3.2程序文件:描述为实施质量管理体系要求所涉及的各职能部门的活动的文件。如文件控制程序、 管理评审控制程序、内部审核控制程序。 3.3 Working Instruction: Operation procedures, inspection standards, design drawing and etc. 3.3操作指导书:操作规程、检验标准、加工图纸等。 3.4 Form: Records of operation results. 3.4表单:用于记录作业结果所用的文件。 4.0 Procedure 程序 4.1 Responsible for the formulation of documents to file the proper approval, and timely send the electronic document and the paper version to DCC, ensure that the relevant departments to understand the change. Once the document released, the relevant departments must follow procedures. When the file changes do not affect the contents of the file (such as correcting typos,

质量管理体系 文件控制程序

文件控制程序 一、目的:对与组织质量管理体系有关的文件进行控制,确保各相关场所使用文件为有效版本。 二、范围:对与组织质量管理体系有关的文件进行控制,确保各相关场所使用文件为有效版本。 三、职责者:公司总经理、管理者代表、各部门负责收集。 四、内容: 1、职责 1.1总经理负责批准发布质量手册。 1.2管理者代表负责审核质量手册。 1.3各部门负责本部门相关文件的编制、使用和保管。 1.4办公室负责组织对现有体系文件的定期评审。 1.5各部门负责本部门与质量管理体系有关的文件的收集、整理和归档等。 2、程序 2.1文件分类及保管 2.1.1文件一级分类及代号 2.1.2 文件二级分类及代号 每一大类生产质量管理文件下,又规定作二级分类,即分为:

二类分类代号中的字母除SOP,SMP为英文缩写外,其它均为中文的拼音缩写。2.1.3第一级质量管理体系文件为质量手册,第二级质量管理体系文件为程序文件,由办公室备案保存。第三级质量管理体系文件,由各相关部门自行保存并报办公室 备案存档。 2.2文件的编号 2.2.1文件的编号与格式 编号格式 版本号(两位数字) 2.2.2 一级分类、二级分类、三级分类代号的编制按2.1.1、2.1.2的有关规定执行。 2.2.3 顺序号用三个阿拉伯数字表示,按文件编制的顺序排列。 2.2.4 版本号表示文件修订情况,文件的第一版用“00”表示,第一次修订用“01”表示,以后每次修订按顺序递增。 2.2.5例如: 程序文件《文件控制程序》编号:CX-SMP-001-00表示该文件是:程序文件 , 2.3文件的编写、审核、批准、发放文件发布前应得到批准,以确保文件是适宜的: a)质量手册由办公室负责组织编写,由管理者代表审核,上报总经理批准发布, 由办公室负责登记、发放; b)各部门工作文件由各部门负责人组织编写、汇总,由管理者代表审核,报总 经理批准,办公室负责登记、发放; c)应确保文件使用的各场所都应得到相关文件的适用版本。文件的发放、回收 要填写《文件发放、回收记录》。 2.4文件的受控状况 文件分为“受控”和“非受控”两大类,凡与质量体系运行紧密相关的文件应为受控,由各主管部门按规定执行。所有受控文件必须在该文件封面书写“受控”表 明其受控状态,并注明分发号。 2.5文件的修订或替换

南开20秋《生产运营管理》《生产计划与控制》在线作业

1.运作战略属于公司的()战略 A.发展战略 B.职能战略 C.竞争战略 D.多元化战略 答案:B 2.设计是把计划、规划、设想、解决问题的方法,通过()表达出来的过程 A.视觉方式 B.嗅觉方式 C.触觉方式 D.听觉方式 答案:A 3.下列不属于“5S”推进阶段的是() A.形式化 B.行事化 C.习惯化 D.制度化 答案:D 4.某月饼店固定成本30000元,每块月饼人工和材料等可变成本平均为6元,每块月饼售价16元。要达到损益平衡,必须制作及销售多少块月饼?() A.5000 B.3000 C.1875 D.1500 答案:B 5.是谁首次提出了劳动分工的概念() A.泰勒 B.亚当·斯密

C.霍桑 D.甘特 答案:B 6.不属于科学管理内涵的是() A.组织要科学 B.要有科学的精神 C.产品设计要科学 D.方法和工具要科学 答案:C 7.下列哪项战略属于公司战略?() A.成本领先 B.差异化 C.集中化 D.多元化 答案:D 8.按生产要素密集程度和与顾客接触程度划分,医院是() A.大量资本密集服务 B.大量劳动密集服务 C.专业资本密集服务 D.专业劳动密集服务 答案:C 9.下列基本质量管理图表工具中哪一种显示的是两种变量相关程度() A.直方图 B.散布图 C.流程图 D.控制图 答案:B 10.项目管理有()大生命周期

A.3 B.4 C.5 D.6 答案:B 11.在服务能力生命周期的()时期竞争更多地表现为某一方面的(价格/质量)竞争 A.创业期 B.合理化 C.成长 D.成熟 答案:D 12.供应链管理下的采购与传统采购不同在于() A.为库存采购 B.与供应商一般是买卖关系 C.与供应商结成战略伙伴关系 D.让供应商竞争以获利 答案:C 13.是()首次提出全面质量管理的概念 A.贝尔 B.费根鲍姆 C.戴明 D.克劳斯比 答案:B 14.波士顿大学的5个运作竞争重点中,总是排在第一位的是() A.交货可靠性 B.产品可靠性 C.一致性质量 D.低价格 答案:C

ASME程序文件-材料控制规则(中英文)

These rules are supplemented to the QC Manual for material control. 1.Purchasing 1.1 The material requisition prepared by Design Dept. is the basis of material purchasing, and is supplemented with the purchase specification or drawings or other specific procedures which specifies requirements not covered by the material requisition. 1.2 The Purchase Department shall maintain a close contact with vendors and ask for information on procurement status and necessary documents from the vendor such as their procedures, the mill test reports or certificate of compliance etc, for reviewing by the Material QC Engineer. If necessary the Purchase Department will apply for source examination at vendor’s shop. 1.3 The Purchase Department Supervisor shall be responsible for purchasing materials. 1.4 The Purchase Engineer shall prepare the purchase order in accordance with the material requisition accompanying with its supplementary documents. The completed purchase order shall be approved by the Purchase Dept. Supervisor. The Purchase Engineer shall send the purchase order, accompanying with purchase specification as required, to the contracted vendor and also a copy to the Examination Section. 1.5 When any part of the specifications or contract conditions is amended, the revised Purchase Order shall be prepared in the same manner as the original. If the amendment is limited to condition which does not affect the quality or the technical matter, such as delivery date, the amended condition may be informed to the vendor by telephone or telex, and shall be noted on a copy of the Purchase Order retained by the Purchase Dept.. 1.6 All of the purchase orders shall be filed for reference. 2. Receiving Inspection and Storage 2.1 When materials are received, the Material Warehouse Keeper shall place the in-coming material and parts in designated area and request the Material QC Engineer for receiving inspection. 2.2 The receiving inspection/。n shall be made in accordance with the “Rules for Receiving Inspection”(QC P 02) 2.3 Acceptable materials for Code items shall be segregated from those materials for

生产计划与控制简答题

简答题 1、预测工作的步骤有哪些? 答: 1.明确预测的对象与有关的预测要求; 2.确定预测期的长短; 3.选择预测方法; 4.收集与分析数据资料; 5.进行预测; 6.对预测过程进行监控。 2、简述什么是综合计划 答:综合计划:是对劳动力水平、工作时间、库存及积压订单进行权衡的计划活动。目标是以最少的成本实现企业的生产能力和产品市场需求之间的平衡. 3、简述什么是德尔菲法 答:德尔菲法:挑选专家;开始第一轮函询调查。即向专家寄去一些背景材料,并提出所需预测的具体项目。由专家回答问题,通过对专家的各种回答进行综合整理,把主要相同的结论统一起来,剔除次要及分散的事件。然后将整理结果反馈给各位专家,进行第二轮函询。各位专家对整理结果加以评价,修正原来的预测值,对预测目标重新进行预测。 4、制定生产作业计划的基本要求是什么? 答: 1.确保实现已确定的交货期 2.减少作业人员和设备的等待时间 3.使作业加工对象的流程时间最短 4.减少在制品的数量和停放时间 5.标准化基本原理是什么? 答:统一、简化、最优。同类产品统一参数,统一计量单位,采用优先数列;简化规格品种;进行优化设计,取得最好经济效益。 6、生产调度工作的原则是什么 答: 1.计划性:以生产作业计划为依据 2.统一性:给调度部门权力,保证调度指示和命令的统一性,防止出现多头指挥的现象。 3.预防性:调度工作要以预防为主。 7、简述企业计划的种类和内容 答:企业的计划按计划期的长短可分为长期计划、年度计划和作业计划。 按业务内容分为生产计划、质量计划、人力资源计划、采购计划、财务计划、销售计划等。按范围可分为企业计划、车间计划、工段计划、班组计划及机台计划。 8、合理组织生产过程有哪些基本要求? 答:合理组织生产过程的基本要求是 (1)生产过程的连续性。 (2)生产过程的比例性。 (3)生产过程的节奏性。 (4)生产过程的柔性。 9、生产作业计划工作的内容有哪些?

三体系管理体系程序文件

目录

文件与记录管理程序 1、目的 通过对管理体系文件的严格控制管理,确保其文件使用的有效性、保管和更改的规定。并对质量记录其完整性、准确性、清晰、保管等予以控制。以证明产品三体系满足规定要求、管理体系有效运行,并为实现可追溯性、证实作用以及采取纠正和预防措施提供依据。 2、适用范围 适用于本公司所有管理体系文件及相关资料记录的管理与控制。 3、职责与权限 ISO综管部负责公司管理体系文件的收集、分类编号、整理、存档保管、发放及与管理和 控制有关的其他工作。 各部门负责本部门在用文件的管理和控制。 4、程序内容 管理体系文件的分类、编制、审核、审批按下列规定执行: 管理体系文件的编号、归口、分类、 4.2.1 公司编制的各级管理体系文件均由综管部归口、分类并统一编号,其文件编号规定。 4.2.2 文件受控分类 管理体系文件分为受控原版、受控副本、非受控副本: 1)受控原版是不须加盖受控文件印章,由综管部保存,仅作为复制用途。 2)受控副本为受控原版的复印件,其上加盖红色“受控本”印章发放,作为公司内使用的合法文件,公司内不允许使用“受控本”变黑的非法复印文件,以确保文件更新时能够从发放或使用场所撤出失效或作废的文件。 3)非受控副本为受控原版的复印件,其上加盖红色本公司名印章作为提供给客户或公司以外的人员使用的合法文件。公司内部不允许使用加盖红色本公司印章名的体系受控文件。 4.2.3 文件版次规定 为确保公司管理体系文件的有效性能够得到控制,对其采用版次来控制最新有效版次。版次采用“A”+第几次版本,文件经过一次修改后进行换版,版本号增高一位(如:A0首次发行版本、A1第一次修改、A...n第n次修改 文件的发放与记录 4.3.1 综管部根据管理手册、程序文件、效率记录制定并及时登录《受控文件总表》;根据质量记录表格制定并及时登录《质量记录总表》,确保各部门使用最新有效的文件。根据统一分发号加盖红色“受控”印章发放,收件人应当场核对页数,页码和分发号无误后,在《文件发放与回收记录》上签收。 4.3.2用部门的体系文件破损或遗失时,须填写《文件领用申请表》经体系负责人批准补发。破损文件及时交还综管部,遗失文件须追究相关人员责任。 4.3.3 非发放范围人员需领用文件时,须填写《文件领用申请表》经该文件的批准人同意后,按本节第条办理手续。 4.3.4 三体系记录空白表格的发放由综管部根据《质量记录总表》发放三体系记录空白表格,不需要加盖蓝色“受控本”印章,接收人在表格原件背面签字,作为发放记录(注:综管部只控制质量记录空白表格的格式、编号和版次)。 文件的更改

ISO14001文件管理与控制程序(中英文版)

文件管理与控制程序 Documents management and control procedure 1.目的Purpose 确保环境管理体系文件、适用的外来文件(有关的法律、法规、标准、相关方提供的文 件或规范)使用的有效性。To assure the 2.适用范围 scope 适用于对环境管理体系相关文件及适用的外来文件的控制。It is apply to the environment management system relation documents and usable external documents’ control. 3.职责Responsibility 3.1 环工组:负责环境管理体系文件及适用的外来文件的归口管理;负责监控文件的执行。 The environment team: to manage and be in charge of environment management documents and external documents. 3.2 各部门individual department:确保各相关场所均使用现行文件的有效版本。To ensure The relative workplace is using the current effective documents. 4.工作程序Work procedure 4.1文件控制范围包括:documents control’s scope a)环境管理手册;environment management manual; b)环境管理体系程序文件;environment management system procedure documents; c)环境管理体系作业指导文件;the work instruction documents for environment management system; d)环境记录表格;environment record form; e)外来文件。External documents. 4.2 文件的编写writing the documents 4.2.1环境管理手册和环境管理体系程序文件由环境管理者代表组织各部门人员编写。 Environment management manual and the environment management system procedure documents, which will be written by each department’s people that

质量手册、程序文件的管理制度

编号:SY-AQ-01352 ( 安全管理) 单位:_____________________ 审批:_____________________ 日期:_____________________ WORD文档/ A4打印/ 可编辑 质量手册、程序文件的管理制 度 Management system of quality manual and procedure documents

质量手册、程序文件的管理制度 导语:进行安全管理的目的是预防、消灭事故,防止或消除事故伤害,保护劳动者的安全与健康。在安全管理的四项主要内容中,虽然都是为了达到安全管理的目的,但是对生产因素状态的控制,与安全管理目的关系更直接,显得更为突出。 1、目的与适用范围 为了确保在质量体系运行中的各个场所使用的文件是有效版本,特制 定本制度。 本制度适用于《质量手册》、《程序文件》的更改,发放和回收的管 理。 2、管理要求 2.1全质办是《质量手册》、《程序文件》的归口管理部门。 2.2《质量手册》、《程序文件》在贯彻实施过程中若发现差距或不 符合实际情况时,各职能部门要以书面形式反馈全质办,全质办向管理 者代表提出更改报告,填写文件更改通知单,经管理者代表报准后进行 更改、控版和回收。 2.3全质办指定专人负责《质量手册》、《程序文件》按规定范围进 行发放、更改和因收,对其使用和保管进行监控。

2.4全质办受管理者代表委托解释《质量手册》和《程序文件》的有关内容。 2.5技术科负责对《质量手册》、《程序文件》进行标准化审查。 2.6《质量手册》、《程序文件》持有者要保证其有固定的存放位置,以便在任何情况下都能对其进行更改、回收等。 2.7《质量手册》、《程序文件》持有者要妥善保管,不得丢失,不准外借,更 不准私自提供他人转抄或复印,若发现类似问题,应予以追究责任。 这里填写您的公司名字 Fill In Your Business Name Here

生产计划与控制作业

作业 1、某零件批量为4件,有4道工序。各工序的单件作业时间为t 1=15min ,t 2=20min ,t 3=5min ,t 4=5min ,试计算该批零件在三种移动方式下的加工周期。 解:(1)1 T =m i i n t =∑顺=4×(15+20+5+5)=180min (2)1 = (1)m i L i T t n t =+-∑平=(20+15+5+5)+(4-1)×20=105 min (3)1 1 1 1 =n (1)min(,)m m i j j i j T t n t t -+==--∑∑平顺 =4×(15+20+5+5)-(4-1)×(15+5+5)=105min 2、北京双菱牌拉锁的历年销售记录如下: 年份 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 销售量 198 207 225 262 275 280 207 353 420 456 试用错误!未找到引用源。二次移动平均法(取n=5)错误!未找到引用源。二次指数平滑法(取ɑ=0.1,0.3),预测2001~2005年的销售量。 解:选用二次指数平滑法进行预测,计算1991~2000年各年的一次指数平滑值和二次指数平滑值(表1所示),例如: 依据公式 [1][1]1[2] [1][2]1 (1)(1)t t t t t t SA A SA SA SA SA αααα--=+-=+- 得 [1][1]199219921991[2][1][2]199219921991(1)0.1207(10.1)198198.9(1)0.3198.9(10.3)198198.27 SA A SA SA SA SA αααα=+-=?+-?==+-=?+-?= 表1 拉锁市场销售量及指数平滑值 年份 销售量 SA t [1] SA t [2] 年份 销售量 SA t [1] SA t [2] 1991 198 198 198 1996 280 220.87 210.12 1992 207 198.9 198.27 1997 207 219.49 212.93 1993 225 201.51 199.24 1998 353 232.84 218.90 1994 262 207.56 201.74 1999 420 251.55 228.70 1995 275 214.30 205.51 2000 456 272.00 241.69 计算参数值,利用预测方程式进行预测: [1][2]2000[1][2]2000=22272241.9302.31()0.3/0.7(272241.69)12.991t t t t a SA SA b SA SA α α -=?-== -=?-=-

质量管理体系文件控制程序

质量管理体系文件控制程序 HQZ/B401—2004 1 目的与范围 对质量管理体系的所有文件进行有效控制,确保质量管理体系运行的各个场所使用有效文件,并处于受控状态,以及质量管理体系的持续有效进行。 本文件规定了工厂质量管理体系文件管理的职责、控制要求与工作程序。 本文件适用于工厂质量管理体系所有文件的控制。 2 术语 2.1 文件 信息及其承载媒体。 2.2 质量手册 规定组织质量管理体系的文件。 2.3 程序文件 为进行某项活动或过程所规定的途径的文字描述。 2.4 质量管理 在质量方面指挥和控制组织的协调的活动。 2.5 质量管理体系 在质量方面指挥和控制组织的管理体系。 3工作流程 4 质量科是质量管理体系文件的归口管理部门,负责组织质量管理体系文件的编

制、付印、发放、更改(换版)、回收处理和控制。 党政办负责涉及质量管理体系运行的厂部文件的制定、发放和控制以及涉及体系运行外来文件的收发、传递和管理。 各部门负责本部门与质量管理体系文件有关的支持性管理文件的编制、报批、发放、更改和控制。 5 质量管理体系文件的管理与控制 5.1 文件分类 工厂质量管理体系文件主要有: a) 质量管理手册(A层次) b) 质量管理体系程序(B层次) c) 质量管理体系的支持性管理文件(C层次—指程序文件中涉及的有关规定、 其他管理文件、作业指导书、检验规程等) 5.2 文件标识 5.2.1 文件编号 质量管理体系文件属工厂管理标准中的一部分,其编号按企业标准来对待。 a) 质量管理手册的编号 发布年号 手册版次号 质量管理手册代号 工厂管理标准代号 b) 质量管理体系程序的编号 发布年号 该章中的程序文件顺序号 标准章号 程序代号 工厂管理标准代号

采购控制程序中英文版本

XX有限公司 文件编号: 版本版次: 制定部门: 制定日期: 修定日期: 总页次: 会签:

1.0 目的Purpose 建立公司采购过程的管理程序,对产品采购的过程及价格进行有效控制,以确保所采购的物品/服务质量能符合和满足公司的各项生产需求。 To establish a management procedure for purchasing process control, ensure to control the product purchasing process and price effectively, in order to ensure the products/service purchased can satisfy the company’s requirements and needs. 2.0 范围Scope 本文件适用于公司内部所有采购过程(指满足公司最终产品所需要的各种原材料、辅助材料、设备及维修材料、外协加工服务、工具以及其它物品的采购)。 This procedure apply to all purchase process happen in our company (all kinds of raw material, auxiliary material, equipments and maintain material, outside machining service, tooling and all other goods needed by the company’s production or work.) 3.0 适用文件Applicable documents 以下文件的最新版本有效 The latest issue of the following documents are effect. COP037 《供应商管理程序》 COP028 《仓储管理程序》 COP010《测量仪器校正与管理程序》 COP002《质量环境记录控制程序》 < Quality and environment Records control procedure> COP038《不合格品控制程序》 QCI002 《IQC来料检验作业指导书》 PMI014《产品搬运包装防护作业指导书》 4.0 职责Responsibilities 4.1 采购部负责制定物料的采购计划、采购以及价格控制。 Purchasing department is responsible to arrange the material purchase plan, purchase process and price control. 4.2 品保部负责公司成品委外检验和试验,仪器校正的作业。

管理体系文件管理程序(DOC)

Q/2A GX01-2012 1 范围 本程序适用于哈飞汽车工业集团有限公司(以下简称公司)管理体系文件的编写、发布、修订、维护与评价。 本程序适用于公司本部,以及各分厂、分子公司。 2 目的 旨在保证公司管理体系文件的统一性、完整性、一致性和协同性。 3 术语和定义 3.1 管理体系(HF-MS,Hafei-Management System)文件,包括制度规范、管控(评估)标准、程序文件、作业指导书、管理授权表和管理手册等。 3.1.1 制度规范:由公司各职能部门及各二级单位制定的以书面形式表达,并以一定方式发布的、非针对个别事务处理的规范总称。包括章程、原则、规定、实施细则和决定等非流程性文件。 3.1.2 业务管控(评估)标准:哈飞汽车实施业务管控的纲领性、政策性文件,主要阐述长安汽车各业务管理和控制评价的基本原则和关键条款。 3.1.3 管理地图:展现本单位业务逻辑关系,使业务架构显性化的业务框架图。 3.1.4 程序文件:描述横向跨部门、纵向跨层级协作性工作的文件。通常是由一系列流程组成,辅之以职能职责、业务规则、记录表单等一系列标准,从而实现对业务流转关系的全面描述。部门内部跨业务处的协作性文件也属于程序文件范畴。 3.1.5 作业指导书:描述封闭在处室内部完成的管理工作,涉及工作步骤、操作规程、经验技巧、动作要领等各种指导性内容。 3.1.6 管理授权表:管理授权是指将业务中的决策责任和资源控制权赋予下属,使下属获得决策权和行动权。管理授权表描述管理体系文件中业务审批的授权情况。 3.1.7 管理手册:是某一范围数据、资料或文件的汇编,内容通常是某一专业或某一方面程序、规定、标准等文件的集合。 4 职责

中英文对照版-管理评审控制程序

ABC用品有限公司 质量管理体系程序文件 编制: 日期: 审核: 日期: 批准: 日期: 发放范围:公司各部门2013年10月01日生效

目录 序号章节名页码 1 目的Objective (2) 2 适用范围Applicable Scope (2) 3 职责Responsibility (2) 4 工作程序Work Procedures (3) 文件更改履历表 (7)

1 目的Objective 最高管理者按规定的时间间隔对质量体系现状进行评审,对所选定的质量体系的适宜性、有效性和充分性做出综合评价,保证满足标准的要求和实现质量方针及质量目标。 The top management shall review the present status of the quality s ystem at a specified time interval and make comprehensive assessment of its suitability, effectiveness and sufficienc y, e nsuring to meet the standards, quality policies and quality objectives. 2适用范围Applicable Scope 适用于最高管理者对现行的QS-9000:1998/ISO9001:1994质量体系的评审。 This is applicable to the review of QS-9000:1998 / ISO9001:1994 Quality System by the top management. 3职责Responsibility 3.1 公司总经理负责主持管理评审会议,审批管理评审报告,并对管理评审的全过程进行监督。 The General Manager is responsible to preside over the management review meeting, examine and approve the management review reports, and supervise the whole process of management review. 3.2 管理者代表负责向总经理汇报质量体系运行情况,提出改进建议,组织编写管理评审报告。负责组织 对管理评审中的持续改进、纠正预防措施的实施跟踪和验证 The management representative is responsible to report the status of quality system to the General Manager, submit improvement recommendations and formulate management review reports. It shall also responsible to follow and verify the continuous improvement and corrective & preventative actions as defined in management review. 3.3 各职能部门负责提供与本部门工作有关的评审资料,负责评审报告中所涉及的与本部门相关联的决定 的落实。 Each functional department is responsible to provide relevant information for review and implement the applicable decisions as in the review reports. 3.4 质量部负责编制管理评审计划,收集并提供管理评审所需的资料,负责对评审的纠正预防措施和持续 改进计划进行跟踪和验证,对管理评审资料整理归档。 The Quality Department is responsible to formulate management review plans, collect and provide necessary information for management review, follow and verify the corrective & preventative

质量管理体系程序文件

【最新资料,WORD文档,可编辑】

受控状态分发号 质量管理体系文件 质量管理体系程序文件 编号JD/QMB4.2.3—01~JD/ QMB8.5.2/8.5.3—05 编制办公室 评审各部门 批准管理者代表 版本号第A/0版

无锡市江达商品混凝土有限公司 文件修改记录表QR4.2.3—0107 文件名称编号 修改日期修改次数版本状态修改内容修改人批准人备注

质量管理体系程序文件目录表 序号ISO9001: 2000 标准条款号 文件编号文件名称 1 4.2.3 JD/QMB4.2.3—01 文件控制程序 2 4.2.4 JD/QMB4.2.4—02 记录控制程序 3 8.2.2 JD/QMB8.2.2—03 内部审核程序 4 8.3 JD/QMB8.3—04 不合格品控制程序 5 8.5.2—8.5.3 JD/QMB8.5.2/8.5.3—05 纠正措施和预防措施程序

质量管理体系程序文件编号JD/QMB4.2.3—01 第A版第0次修改 文件控制程序第1页共5页 1.目的 建立并保持形成文件的程序,以控制与质量管理体系有关的所有文件和资料,使与质量管理体系运行有关的各个场所使用适用文件的有关版本,从所有发放和使用的场所及时撤出失效和作废的文件。 2.范围 适用于本公司质量管理体系有效运行和产品质量有关的文件和资料的控制,包括适当范围的外来文件,如标准、法规、顾客财产的知识产权(提供的图纸)等。 3.引用标准 GB/T19001—2000《质量管理体系——要求》 JD/QMA—2006《质量管理手册》4.2.3《文件控制》 4.职责 4.1办公室负责质量管理体系管理文件的控制。

CX03管理体系文件控制和维护程序

1.目的 为使质量管理体系文件受控,确保文件的现行有效和保密,特编制本程序。 2.范围 适用于本中心与质量管理体系有关的所有文件的控制。 3.职责 3.1 中心主任应: 3.1.1批准《质量管理手册》、《程序文件》等重要的质量管理文件发布。 3.2 质量负责人应: 3.2.1负责组织编制《质量管理手册》、《程序文件》和其他管理性文件; 3.2.2负责《质量管理手册》、《程序文件》的审核; 3.2.3负责维护《质量管理手册》、《程序文件》的有效性。 3.3技术负责人应: 3.3.1负责组织编制、审核、批准各种技术作业指导文件; 3.3.2负责维护各种技术作业指导文件的有效性。 3.4文件和档案管理员应: 3.4.1负责质量管理体系文件的保管和发放。 4.工作程序 4.1 文件范围 4.1.1内部文件:本中心内部编制的文件。包括:《质量管理手册》、《程序文件》,各类作业指导文件、计划、报告及记录等。 4.1.2外部文件:与检测有关的法律、法规、规章、标准、检测方法、图纸、软件、指导书、教科书、备忘录、上级文件等。 4.1.3以上文件可能是硬拷贝、电子媒体及数字的、模拟的、摄影的或书面的形式。

4.2质量管理体系文件的层次 4.2.1第一层:质量管理手册――是本中心质量管理体系运行的纲领性文件,描述本中心质量方针、目标和质量管理体系各要素的要求、职责及途径; 4.2.2第二层:程序文件――是质量管理手册的支持性文件,对质量管理体系运行中各项质量活动的详细、明确描述。 4.2.3第三层:作业指导书――是对完成各项质量/技术活动的规定,供检测人员执行。 4.2.4第四层:质量和技术记录――是质量管理体系各项质量活动的证据。 4.3管理体系文件的编制、审批和发布 4.3.1质量方针、目标由中心主任亲自主持制定,经领导层集体讨论后由中心主任颁布。发布后的质量方针由质量负责人向全体员工宣贯,动员全体员工积极参与质量活动,将质量方针分解到本中心的每一个具体岗位上。 4.3.2第一层次和第二层次文件由质量负责人组织编写和审核,中心主任批准发布,质量记录由质量负责人组织编制并审批。 4.3.3第三层次文件和技术记录由技术负责人组织编制并审批。 4.4管理体系文件的修订和维护 4.4.1第一层次文件由质量负责人根据中心主任的要求安排修订,并维护其现行有效性。 4.4.2第二层次文件由质量负责人根据中心主任的要求和文件运行的问题安排修订,并维护其现行有效性。 4.4.3第三层次文件由技术负责人根据检测能力的要求组织修订,并维护其现行有效性。 4.4.4质量记录由质量负责人组织修订,并维护其现行有效性;技术记录由技术负责人组织修订,并维护其现行有效性。 4.5管理体系文件的管理与发放 4.5.1质量负责人批准质量管理体系文件的发放范围,文件和档案管理员建立所有文件、资料的帐目及明细(见《内部文件(资料)目录表》《文件审批登记表》《外来文件资料登记表》),所有经过审批的文件在《文件审批登记表》上进行登记,文件的收发、复制、归档均统一编号,并有责任人签字。 4.5.2文件和档案管理员建立保存有效的文件发放清单(见《文件收发登记表》),防止使用失效文件,使下发的文件始终处于受控状态。

ISO14001文件管理与控制程序(中英文版)

文件管理与控制程序 Docume nts man ageme nt and con trol procedure 1. 目的Purpose 确保环境管理体系文件、适用的外来文件(有关的法律、法规、标准、相关方提供的文 件或规范)使用的有效性。To assure the 2. 适用范围scope 适用于对环境管理体系相关文件及适用的外来文件的控制。It is apply to the en vir onment man ageme nt system relati on docume nts and usable exter nal docume nts ' con trol. 3. 职责Responsibility 3.1环工组:负责环境管理体系文件及适用的外来文件的归口管理;负责监控文件的执行。 The environment team: to man age and be in charge of en vir onment man ageme nt docume nts and exter nal docume nts. 3.2各部门in dividual departme nt :确保各相关场所均使用现行文件的有效版本。To en sure The relative workplace is using the curre nt effective docume nts. 4. 工作程序Work procedure 4.1 文件控制范围包括:documents control ' s scope a) 环境管理手册;en vir onment man ageme nt manu al; b) 环境管理体系程序文件;en vir onment man ageme nt system procedure docume nts; c) 环境管理体系作业指导文件;the work in structio n docume nts for en vir onment man ageme nt system; d) 环境记录表格;en vir onment record form; e) 夕卜来文件。External docume nts. 4.2 文件的编写writing the documents 4. 2. 1环境管理手册和环境管理体系程序文件由环境管理者代表组织各部门人员编写。 En vir onment man ageme nt manual and the en vir onment man ageme nt system procedure documents, which will be written by each department ' s people that orga ni

相关主题