STUDIES ON IMPACT STRENGTH OF CONCRETE

SUBJECTED TO SUSTAINED

ELEVATED TEMPERATURE

Concrete has a remarkable fire resisting properties. Damage in concrete due to fire depends on a great extent on the intensity and duration of fire. Spalling cracking during heating are common concrete behaviour observed in the investigation of the fire affected structures. Plenty of literature is available on the studies of concrete based on time temperature cures. In power, oil sectorsand nuclear reactors concrete is exposed to high temperature for considerable period of time. These effects can be reckoned as exposure to sustained elevated temperature. The sustained elevated temperature may be varying from a few hours to a number of years depending upon practical condition of exposures. The knowledge on properties under such conditions is also of prime importance apart from the structures subjected to high intensity fire. Impact studies of structure subjected to sustained elevated temperature becomes more important as it involves sensitive structures which is more prone to attacks and accidents. In this paper impact studies on concrete subjected to sustained elevated temperature has been discussed. Experiments have been conducted on 180 specimens along with 180 companion cube specimens. The temperatures of 100°C, 200°C and 300°C for a duration of exposure of 2 hours 4 hours and 6 hours has been considered in the experiments. The results are logically analyzed and concluded.

1. INTRODUCTION

The remarkable property of concrete to resist the fire reduces the damage in a concrete structure whenever there is an accidental fire. In most of the cases the concrete remains intact with minor damages only. The reason being low thermal conductivity of concrete at higher temperatures and hence limiting the depth of penetration of fire

damage. But when the concrete is subjected to high temperature for long duration the deterioration of concrete takes place. Hence it is essential to understand the strength and deformation characteristics of concrete subjected to temperature for long duration. In this paper an attempt has been made to study the variation in Impact Strength of concrete when subjected to a temperature range 100oC, 200oC and 300oC sustained for a period of 2 hrs, 4 hrs and 6 hrs.

The review of the literature shows that a lot of research work [1 – 3] has taken place on the effect of elevated temperature on concrete. All these studies are based on time –temperature curves. Hence an attempt has been made to study the effect of sustained elevated temperature on impact strength of concrete and the results are compared with the compressive strength. The experimental programme has been planned for unstressed residual strength test based on the available facilities. Residual strength is the strength of heated and subsequently cooled concrete specimens expressed as percentage of the strength of unheated specimens.

2. EXPERIMENTAL INVESTIGATION

2.1. TEST SPECIMEN AND MATERIALS

A total of 180 specimens were tested in the present study along with 180 companion cubes. An electric oven capable of reaching a maximum temperature of 300oC has been used for investigation. Fine and coarse aggregates conforming to IS383 has been used to prepare the specimen with mix proportions M1 = 1:2.1:3.95 w/c = 0.58, M2 = 1:1.15:3.56 w/c = 0.53, M3 = 1:0.8:2.4 w/c = 0.4.

2.2 TEST VARIABLES

The effects of the following variables were studied.

2.2.1 Size s

Size of Impact Strength Test Specimen was 150 mm dial and 64 mm thickness and size of companion cube 150 x 150 x 150 mm.

2.2.2 Maximum Temperature

In addition to room temperature, the effect of three different temperatures (100oC, 200oC and 300oC) on the compressive strength was investigated.

2.2.3 Exposure Time at Maximum Temperature

Three different exposure times were used to investigate the influence of heat on compressive strength; they are 2 hrs, 4 hrs and 6 hrs.

2.2.4 Cooling Method

Specimens were cooled in air to room temperature.

3. TEST PROCEDURE

All the specimens were cast in steel moulds as per IS516 and each layer was compacted. Specimens were then kept in their moulds for 24 hours after which they were decoupled and placed into a curing tank until 28 days. After which the specimens were removed and were allowed to dry in room temperature. These specimens were kept in the oven and the required target temperature was set. Depending on the number of specimen kept inside the oven the time taken to reach the steady state was found to vary. After the steady state was reached the specimens were subjected to predetermined steady duration at the end of which the specimens are cooled to room temperature and tested.

ACI drop weight impact strength test was adopted. This is the simplest method for evaluating impact resistance of concrete. The size of the specimen is 150 mm dial and 64 mm thickness. The disc specimens were prepared using steel moulds cured and heated and cooled as. This consists of a standard manually operated 4.54 kg hammer with 457 mm drop. A 64 mm hardened steel ball and a flat base plate with positioning bracket and lugs. The specimen is placed between the four guides pieces (lugs) located 4.8 mm away from the sample. A frame (positioning bracket) is then built in order to target the steel ball at the centre of concrete disc. The disc is coated at the bottom with a thin layer of petroleum jelly or heavy grease to reduce the friction between the specimen and base plate. The bottom part of the hammer unit was placed with its base upon the steel ball and the load was applied by dropping weight repeatedly. The loading was continued until the disc failed and opened up such that it touched three of the four positioning lugs. The number of blows that caused this condition is recorded as the failure strength. The companion cubes were tested for cube compression strength (fake).

4. ANALYSIS AND RESULTS

4.1 RESIDUAL COMPRESSIVE STRENGTH VS. TEMPERATURE

From Table 1, at 100°C sustained elevated temperature it is seen that the residual strength of air cooled specimens of mixes M1, M2 and M3 has increased in strength 114% for M1 mix, 109% for M2 mix and 111% for M3 mix for 6 hours duration of exposure. When the sustained elevated temperature is to 200°C for air cooled specimens there is a decrease in strength up to 910% approximately for M1 mix for a duration of 6 hours, but in case of M2 mix it is 82% and for M3 mix it is 63% maximum for 6 hours duration of exposure. When the concrete mixes M1, M2 and M3 are exposed to 300°C sustained temperature there is a reduction in strength up to 78% for M1 mix for 6 hour duration of exposure.

4.2 RESIDUAL COMPRESSIVE STRENGTH VS DURATION OF EXPOSURE

From Table 1, result shows that heating up to 100°C for 2 hours and 4 hours, the residual strength of mix M1 has decreased where as the residual strength of mix M2 and M3 has increased. The residual strength is further increased for 6 hours duration of exposure in all the three mixes M1, M2 and M3 even beyond the strength at room temperature. When the specimens of mixes M1, M2 and M3 are exposed to 200°C for 2,4 and 6 hours of duration, it is observed that the residual strength has decreased below the room temperature and has reached 92% for M1 mix, 82 and 73% for M2 and M3 mix respectively. Concrete cubes of mixes M1, M2 and M3 when subjected to 300°C temperature for 2,4 and 6 hours the residual strength for mix M1 reduces to 92% for 2 hours up to 78% for six hours duration of exposure, for M2 mix 90% for 2 hours duration of exposure up to 76% for six hour duration of exposure, for M3 mix 88% up to 68% between 2 and 6 hours of duration of exposure.

5. IMPACT STRENGTH OF CONCRETE

5.1 RESIDUAL IMPACT STRENGTH VS TEMPERATURE

From the table 1, it can be observed that for the sustained elevated temperature of 100°C the residual impact strength of all the specimens reduces and vary between 20 and 50% for mix M1, 15 to 40% for mix M2 and M3. When the sustained elevated temperature is 200°C the residual impact strength of all the mixes further decreases. The reduction is around 60-70% for mix M1, 55 to 65% for M2 and M3 mix. When the sustained elevated temperature is 300°C it is observed that the residual impact strength reduces further and vary between 85 and 70% for mix M1 and 85 to 90% for mix M2 and mix M3.

5.2 RESIDUAL IMPACT STRENGTH VS DURATION OF EXPOSURE

From the Table 1 and Figures 1 to 3, it can be observed that there is a reduction in impact strength when the sustained elevated temperature is 100°C for 2 hrs, 4 hrs and 6 hrs, and its range is 15 to 50% for all the mixes M1, M2 and M3. The influence of duration of exposure is higher for mix M1 which decreases more rapidly as compared to mix M2 and mix M3 for the same duration of exposure. When the specimens are subjected to sustained elevated temperature of 200°C for 2,4 and 6 hour of duration, further reduction in residual impact strength is observed as compared to at 100°C. The reduction is in the range of 55-70% for all the mixes. The six hour duration of exposure has a greater influence on the residual impact strength of concrete. When the sustained elevated temperature is 300°C for 2,4 and 6 hours duration of exposure the residual

impact strength reduces. It can be seen that both temperature and duration of exposure have a very high influence on the residual impact strength of concrete which shows a reduction up to 90% approximately for all the mixes.

6. CONCLUSION

The compressive strength of concrete increases at 100oC when exposed to sustained elevated temperature. The compressive strength of concrete decreases when exposed to 200°C and 300°C from 10 to 30% for 6 hours of exposure. Residual impact strength reduces irrespective of temperature and duration. Residual impact strength decreases at a higher rate of 20% to 85% as compared to compressive strength between 15% and 30 % when subjected to sustained elevated temperature. The impact strength reduces at a higher rate as compared to compressive strength when subjected to sustained elevated temperature.

混凝土受持续高温影响的强度的研究

混凝土具有显着的耐火性能。在电力,石油部门核反应堆和混凝土接触在高温环境相当一段时间,因混凝土对火的强度和持续时间很大程度上取决于温度和时间。这些持续高温的影响不容忽视。根据多年的研究数据显示,持续升高温度可从几个小时不同的实际情况解释,在这种情况下混凝土的性能最重要的因素还是它的结构承受高强度火。持续受到结构的影响研究高温下变得更加重要,因为它涉及到敏感的结构,这是更容易袭击和意外事故。本文对混凝土的影响研究受到持续升高温度已经讨论过。实验已进行了180份标本,沿180同伴立方体试样。试验中一直以温度100℃,200℃和300℃的接触时间2小时,4小时和6小时为参照,结果是在理论和实践上进行分析和总结。

在众多火灾案例中, 建筑结构严重破坏甚至倒塌的情况屡有发生, 火灾对建筑结构的危害已受到人们的广泛关注。目前, 国内外对混凝土高温后力学性能的研究进行了大量研究工作并取得了一定成果:研究了加热速度、达到的最高温度、在最高温度下的接触时间对混凝土强度的影响;进行了混凝土升温、冷却速率对剩余强度的试验;本文正是基于这种情况, 通过试验研究了骨料类型、冷却方式、强度等级、静置时间等因素对混凝土高温后抗压强度的影响, 为高温(火灾)后进行结构的安全评估和鉴定、加固提供依据。

1引言

随着温度升高, 混凝土的不同力学性能均有不同幅度的下降; 在相同温度作用下, 随着恒温时间的增加,混凝土的各项力学性能降幅逐渐增大; 混凝土骨料及冷却方式、冷却速度对火灾后混凝土的力学性能有较大影响。

第一,火灾后混凝土的抗压强度:(1)随温度升高,火灾后混凝土抗压强度逐渐降低;(2)相同温度作用后, 喷水冷却比自然冷却混凝土的强度损失大, 快速冷却比慢速冷却混凝土的强度损失大;(3)相同温度作用后, 硅质骨料比钙质骨

料混凝土的强度损失大;(4)相同温度作用后, 最高温度持续时间越长,混凝土的强度损失越大。

第二,火灾后混凝土的抗拉强度:(1)火灾后混凝土抗拉强度随温度升高逐渐降低;(2)混凝土抗拉强度的降幅高于抗压强度;(3)相同温度作用后, 最高温度持续时间越长,混凝土的强度损失越大。

因此,有必要了解混凝土的强度和变形特性持续受温度的时间长。本文尝试研究混凝土强度时,受到温度范围100℃,200℃和300℃持续影响期间2小时,4小时和6小时发生的变化,文献回顾显示,已对混凝土的温度升高得到的效果进行了大量研究工作,所有这些研究都是基于时间—温度曲线。因此对持续高温的影响,冲击强度研究抗压强度与混凝土和结果进行了比较。

2实验研究

2.1试样和材料

在本研究中,随着180的同伴立方体,共有180份标本进行了测试。已被用于调查的电烤箱能够达到的最高温度300℃。已用于符合以IS383的粗骨料配比试样准备M1=1:2.1:3.95 W / C =0.58,混合比M2=1:1.15:3.56 W / C =0.53,M3=1:0.8:2.4 W / C= 0.4。

2.2测试变量

对以下变量的影响进行了研究。

2.2.1尺寸

冲击强度试样尺寸是直径150毫米和64毫米的厚度和大小同伴的150×150×150毫米的立方体。

2.2.2最高温度

除了到室温,三个不同温度(100℃,200℃和300℃)的效果对抗压强度进行了调查。

2.2.3在最高温度的接触时间

三种不同的接触时间被用来研究热的影响,对抗压强度,他们分别是是2小时,4小时和6小时。

2.2.4冷却方法

标本在空气中冷却至室温。

3测试程序

所有标本共投中钢模具为IS516和每一层被压缩。标本然后保持24小时后,他们将固化脱模和放置在他们的模具坦克,直到28天后的标本,并允许在室温干燥温度。这些标本保存在烤箱和温度设定所需的目标。根据标本数量保持箱内,以达到稳定状态的时间被发现有所不同。而后达到稳定状态的标本到预定稳定的时间,其

中的试样冷却至室温和测试结束。

通过ACI落锤冲击强度测试,这是最简单的方法评估影响混凝土电阻。试样的尺寸为直径150毫米和64毫米的厚度。光盘标本准备使用钢模具固化和加热和冷却。这包括一个手动操作标准457毫米下降4.54公斤锤。64毫米的淬硬钢球和平面226底板与定位支架。试样放置之间的四个导向件(耳)位于远离样品的4.8毫米。一个框架(支架定位),然后建立以目标在混凝土光盘中心的钢球。光盘被涂上一层薄薄的凡士林底部或沉重的油脂,以减少标本和底板之间的摩擦。底部的一部分其基地后,钢球锤单位和被丢弃的重量反复负载应用。继续加载,直到光盘失败,开辟了这样,它触及的三个四个定位耳。破坏强度的打击,造成这种情况的数量记录。同伴立方体抗压强度(FCK)进行了测试。

4分析和结果

4.1残余抗压强度VS温度

从表1可以看出,在100°C持续高温,残余强度的空气冷却混合M1,M2和M3的标本增加M1混合强度至114%,109%,M2与M3的组合至111%,混合到6个小时的接触时间,当持续高温是200°C的空气冷却,标本有一个下降强度高达910%,大约为M1组合的6个小时的时间,但在M2的组合的情况下,它是82%和M3的组合,它是63%,最高为6个小时的接触时间。

当混凝土混合的量M1,M2和M3接触于100°C持续高温是减少在比量M1组合为6小时的接触时间高达78%的强度。

4.2残余抗压强度VS接触时间

从表1结果表明,加热到达100℃,2小时和4小时后,混合残余强度M1有所下降,其中作为混合M2和M3的残余强度增加。残余强度进一步增加为6个小时的接触时间,在所有的三个M1,M2和M3的混合比量,甚至超越了在室温下的强度。

当混合比量M1,M2和M3的标本接触在2,4和6小时的时间内,到达200°C,它是观察残余强度有所下降,低于室温已达到92%混合比量M1,M2和M3的82%和73%混合拌匀。

混合M1,M2和M3的混凝土块时,受到300°C的温度为2,4和6小时组合混合比量M1的残余强度的2小时减少到92%高达78%,为6个小时的接触时间,M2混合为2个小时的接触时间高达76%,90%的6个小时的接触时间, M3的混合高达88%,68%的接触时间2至6小时。

5影响混凝土强度

5.1剩余影响强度与温度

从表1可以看出,持续高温100°C的所有标本的残余冲击强度降低20%-50%之间不同的组合比量M1,15%至40%为混合M2和M3。

土木工程英文文献

2.1 Reinforced Concrete Plain concrete is formed from a hardened mixture of cement ,water ,fine aggregate, coarse aggregate (crushed stone or gravel),air, and often other admixtures. The plastic mix is placed and consolidated in the formwork, then cured to facilitate the acceleration of the chemical hydration reaction lf the cement/water mix, resulting in hardened concrete. The finished product has high compressive strength, and low resistance to tension, such that its tensile strength is approximately one tenth lf its compressive strength. Consequently, tensile and shear reinforcement in the tensile regions of sections has to be provided to compensate for the weak tension regions in the reinforced concrete element. It is this deviation in the composition of a reinforces concrete section from the homogeneity of standard wood or steel sections that requires a modified approach to the basic principles of structural design. The two components of the heterogeneous reinforced concrete section are to be so arranged and proportioned that optimal use is made of the materials involved. This is possible because concrete can easily be given any desired shape by placing and compacting the wet mixture of the constituent ingredients are properly proportioned, the finished product becomes strong, durable, and, in combination with the reinforcing bars, adaptable for use as main members of any structural system. The techniques necessary for placing concrete depend on the type of member to be cast: that is, whether it is a column, a bean, a wall, a slab, a foundation. a mass columns, or an extension of previously placed and hardened concrete. For beams, columns, and walls, the forms should be well oiled after cleaning them, and the reinforcement should be cleared of rust and other harmful materials. In foundations, the earth should be compacted and thoroughly moistened to about 6 in. in depth to avoid absorption of the moisture present in the wet concrete. Concrete should always be placed in horizontal layers which are compacted by means of high frequency power-driven vibrators of either the immersion or external type, as the case requires, unless it is placed by pumping. It must be kept in mind, however, that over vibration can be harmful since it could cause segregation of the aggregate and bleeding of the concrete. Hydration of the cement takes place in the presence of moisture at temperatures above 50°F. It is necessary to maintain such a condition in order that the chemical hydration reaction can take place. If drying is too rapid, surface

土木工程外文文献及翻译

本科毕业设计 外文文献及译文 文献、资料题目:Designing Against Fire Of Building 文献、资料来源:国道数据库 文献、资料发表(出版)日期:2008.3.25 院(部):土木工程学院 专业:土木工程 班级:土木辅修091 姓名:武建伟 学号:2008121008 指导教师:周学军、李相云 翻译日期: 20012.6.1

外文文献: Designing Against Fire Of Buliding John Lynch ABSTRACT: This paper considers the design of buildings for fire safety. It is found that fire and the associ- ated effects on buildings is significantly different to other forms of loading such as gravity live loads, wind and earthquakes and their respective effects on the building structure. Fire events are derived from the human activities within buildings or from the malfunction of mechanical and electrical equipment provided within buildings to achieve a serviceable environment. It is therefore possible to directly influence the rate of fire starts within buildings by changing human behaviour, improved maintenance and improved design of mechanical and electrical systems. Furthermore, should a fire develops, it is possible to directly influence the resulting fire severity by the incorporation of fire safety systems such as sprinklers and to provide measures within the building to enable safer egress from the building. The ability to influence the rate of fire starts and the resulting fire severity is unique to the consideration of fire within buildings since other loads such as wind and earthquakes are directly a function of nature. The possible approaches for designing a building for fire safety are presented using an example of a multi-storey building constructed over a railway line. The design of both the transfer structure supporting the building over the railway and the levels above the transfer structure are considered in the context of current regulatory requirements. The principles and assumptions associ- ated with various approaches are discussed. 1 INTRODUCTION Other papers presented in this series consider the design of buildings for gravity loads, wind and earthquakes.The design of buildings against such load effects is to a large extent covered by engineering based standards referenced by the building regulations. This is not the case, to nearly the same extent, in the

土木工程外文翻译

转型衰退时期的土木工程研究 Sergios Lambropoulosa[1], John-Paris Pantouvakisb, Marina Marinellic 摘要 最近的全球经济和金融危机导致许多国家的经济陷入衰退,特别是在欧盟的周边。这些国家目前面临的民用建筑基础设施的公共投资和私人投资显著收缩,导致在民事特别是在民用建筑方向的失业。因此,在所有国家在经济衰退的专业发展对于土木工程应届毕业生来说是努力和资历的不相称的研究,因为他们很少有机会在实践中积累经验和知识,这些逐渐成为过时的经验和知识。在这种情况下,对于技术性大学在国家经济衰退的计划和实施的土木工程研究大纲的一个实质性的改革势在必行。目的是使毕业生拓宽他们的专业活动的范围,提高他们的就业能力。 在本文中,提出了土木工程研究课程的不断扩大,特别是在发展的光毕业生的潜在的项目,计划和投资组合管理。在这个方向上,一个全面的文献回顾,包括ASCE体为第二十一世纪,IPMA的能力的基础知识,建议在其他:显著增加所提供的模块和项目管理在战略管理中添加新的模块,领导行为,配送管理,组织和环境等;提供足够的专业训练五年的大学的研究;并由专业机构促进应届大学生认证。建议通过改革教学大纲为土木工程研究目前由国家技术提供了例证雅典大学。 1引言 土木工程研究(CES)蓬勃发展,是在第二次世界大战后。土木工程师的出现最初是由重建被摧毁的巨大需求所致,目的是更多和更好的社会追求。但是很快,这种演变一个长期的趋势,因为政府为了努力实现经济发展,采取了全世界的凯恩斯主义的理论,即公共基础设施投资作为动力。首先积极的结果导致公民为了更好的生活条件(住房,旅游等)和增加私人投资基础设施而创造机会。这些现象再国家的发展中尤为为明显。虽然前景并不明朗(例如,世界石油危机在70年代),在80年代领先的国家采用新自由主义经济的方法(如里根经济政策),这是最近的金融危机及金融危机造成的后果(即收缩的基础设施投资,在技术部门的高失业率),消除发展前途无限的误区。 技术教育的大学所认可的大量研究土木工程部。旧学校拓展专业并且新的学校建成,并招收许多学生。由于高的职业声望,薪酬,吸引高质量的学校的学生。在工程量的增加和科学技术的发展,导致到极强的专业性,无论是在研究还是工作当中。结构工程师,液压工程师,交通工程师等,都属于土木工程。试图在不同的国家采用专业性的权利,不同的解决方案,,从一个统一的大学学历和广泛的专业化的一般职业许可证。这个问题在许多其他行业成为关键。国际专业协会的专家和机构所确定的国家性检查机构,经过考试后,他们证明不仅是行业的新来者,而且专家通过时间来确定进展情况。尽管在很多情况下,这些证书虽然没有国家接受,他们赞赏和公认的世界。 在试图改革大学研究(不仅在土木工程)更接近市场需求的过程中,欧盟确定了1999博洛尼亚宣言,它引入了一个二能级系统。第一级度(例如,一个三年的学士)是进入

中英文论文对照格式

英文论文APA格式 英文论文一些格式要求与国内期刊有所不同。从学术的角度讲,它更加严谨和科学,并且方便电子系统检索和存档。 版面格式

表格 表格的题目格式与正文相同,靠左边,位于表格的上部。题目前加Table后跟数字,表示此文的第几个表格。 表格主体居中,边框粗细采用0.5磅;表格内文字采用Times New Roman,10磅。 举例: Table 1. The capitals, assets and revenue in listed banks

图表和图片 图表和图片的题目格式与正文相同,位于图表和图片的下部。题目前加Figure 后跟数字,表示此文的第几个图表。图表及题目都居中。只允许使用黑白图片和表格。 举例: Figure 1. The Trend of Economic Development 注:Figure与Table都不要缩写。 引用格式与参考文献 1. 在论文中的引用采取插入作者、年份和页数方式,如"Doe (2001, p.10) reported that …" or "This在论文中的引用采取作者和年份插入方式,如"Doe (2001, p.10) reported that …" or "This problem has been studied previously (Smith, 1958, pp.20-25)。文中插入的引用应该与文末参考文献相对应。 举例:Frankly speaking, it is just a simulating one made by the government, or a fake competition, directly speaking. (Gao, 2003, p.220). 2. 在文末参考文献中,姓前名后,姓与名之间以逗号分隔;如有两个作者,以and连接;如有三个或三个以上作者,前面的作者以逗号分隔,最后一个作者以and连接。 3. 参考文献中各项目以“点”分隔,最后以“点”结束。 4. 文末参考文献请按照以下格式:

土木工程毕业设计外文文献翻译修订版

土木工程毕业设计外文文献翻译修订版 IBMT standardization office【IBMT5AB-IBMT08-IBMT2C-ZZT18】

外文文献翻译 Reinforced Concrete (来自《土木工程英语》) Concrete and reinforced concrete are used as building materials in every country. In many, including the United States and Canada, reinforced concrete is a dominant structural material in engineered construction. The universal nature of reinforced concrete construction stems from the wide availability of reinforcing bars and the constituents of concrete, gravel, sand, and cement, the relatively simple skills required in concrete construction, and the economy of reinforced concrete compared to other forms of construction. Concrete and reinforced concrete are used in bridges, buildings of all sorts underground structures, water tanks, television towers, offshore oil exploration and production structures, dams, and even in ships. Reinforced concrete structures may be cast-in-place concrete, constructed in their final location, or they may be precast concrete produced in a factory and erected at the construction site. Concrete structures may be severe and functional in design, or the shape and layout and be whimsical and artistic. Few other building materials off the architect and engineer such versatility and scope. Concrete is strong in compression but weak in tension. As a result, cracks develop whenever loads, or restrained shrinkage of temperature changes, give rise to tensile stresses in excess of the tensile strength of the concrete. In

土木工程外文文献翻译

专业资料 学院: 专业:土木工程 姓名: 学号: 外文出处:Structural Systems to resist (用外文写) Lateral loads 附件:1.外文资料翻译译文;2.外文原文。

附件1:外文资料翻译译文 抗侧向荷载的结构体系 常用的结构体系 若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。确实,较好的高层建筑普遍具有构思简单、表现明晰的特点。 这并不是说没有进行宏观构思的余地。实际上,正是因为有了这种宏观的构思,新奇的高层建筑体系才得以发展,可能更重要的是:几年以前才出现的一些新概念在今天的技术中已经变得平常了。 如果忽略一些与建筑材料密切相关的概念不谈,高层建筑里最为常用的结构体系便可分为如下几类: 1.抗弯矩框架。 2.支撑框架,包括偏心支撑框架。 3.剪力墙,包括钢板剪力墙。 4.筒中框架。 5.筒中筒结构。 6.核心交互结构。 7. 框格体系或束筒体系。 特别是由于最近趋向于更复杂的建筑形式,同时也需要增加刚度以抵抗几力和地震力,大多数高层建筑都具有由框架、支撑构架、剪力墙和相关体系相结合而构成的体系。而且,就较高的建筑物而言,大多数都是由交互式构件组成三维陈列。 将这些构件结合起来的方法正是高层建筑设计方法的本质。其结合方式需要在考虑环境、功能和费用后再发展,以便提供促使建筑发展达到新高度的有效结构。这并

不是说富于想象力的结构设计就能够创造出伟大建筑。正相反,有许多例优美的建筑仅得到结构工程师适当的支持就被创造出来了,然而,如果没有天赋甚厚的建筑师的创造力的指导,那么,得以发展的就只能是好的结构,并非是伟大的建筑。无论如何,要想创造出高层建筑真正非凡的设计,两者都需要最好的。 虽然在文献中通常可以见到有关这七种体系的全面性讨论,但是在这里还值得进一步讨论。设计方法的本质贯穿于整个讨论。设计方法的本质贯穿于整个讨论中。 抗弯矩框架 抗弯矩框架也许是低,中高度的建筑中常用的体系,它具有线性水平构件和垂直构件在接头处基本刚接之特点。这种框架用作独立的体系,或者和其他体系结合起来使用,以便提供所需要水平荷载抵抗力。对于较高的高层建筑,可能会发现该本系不宜作为独立体系,这是因为在侧向力的作用下难以调动足够的刚度。 我们可以利用STRESS,STRUDL 或者其他大量合适的计算机程序进行结构分析。所谓的门架法分析或悬臂法分析在当今的技术中无一席之地,由于柱梁节点固有柔性,并且由于初步设计应该力求突出体系的弱点,所以在初析中使用框架的中心距尺寸设计是司空惯的。当然,在设计的后期阶段,实际地评价结点的变形很有必要。 支撑框架 支撑框架实际上刚度比抗弯矩框架强,在高层建筑中也得到更广泛的应用。这种体系以其结点处铰接或则接的线性水平构件、垂直构件和斜撑构件而具特色,它通常与其他体系共同用于较高的建筑,并且作为一种独立的体系用在低、中高度的建筑中。

土木工程外文翻译.doc

项目成本控制 一、引言 项目是企业形象的窗口和效益的源泉。随着市场竞争日趋激烈,工程质量、文明施工要求不断提高,材料价格波动起伏,以及其他种种不确定因素的影响,使得项目运作处于较为严峻的环境之中。由此可见项目的成本控制是贯穿在工程建设自招投标阶段直到竣工验收的全过程,它是企业全面成本管理的重要环节,必须在组织和控制措施上给于高度的重视,以期达到提高企业经济效益的目的。 二、概述 工程施工项目成本控制,指在项目成本在成本发生和形成过程中,对生产经营所消耗的人力资源、物资资源和费用开支,进行指导、监督、调节和限制,及时预防、发现和纠正偏差从而把各项费用控制在计划成本的预定目标之内,以达到保证企业生产经营效益的目的。 三、施工企业成本控制原则 施工企业的成本控制是以施工项目成本控制为中心,施工项目成本控制原则是企业成本管理的基础和核心,施工企业项目经理部在对项目施工过程进行成本控制时,必须遵循以下基本原则。 3.1 成本最低化原则。施工项目成本控制的根本目的,在于通过成本管理的各种手段,促进不断降低施工项目成本,以达到可能实现最低的目标成本的要求。在实行成本最低化原则时,应注意降低成本的可能性和合理的成本最低化。一方面挖掘各种降低成本的能力,使可能性变为现实;另一方面要从实际出发,制定通过主观努力可能达到合理的最低成本水平。 3.2 全面成本控制原则。全面成本管理是全企业、全员和全过程的管理,亦称“三全”管理。项目成本的全员控制有一个系统的实质性内容,包括各部门、各单位的责任网络和班组经济核算等等,应防止成本控制人人有责,人人不管。项目成本的全过程控制要求成本控制工作要随着项目施工进展的各个阶段连续 进行,既不能疏漏,又不能时紧时松,应使施工项目成本自始至终置于有效的控制之下。 3.3 动态控制原则。施工项目是一次性的,成本控制应强调项目的中间控制,即动态控制。因为施工准备阶段的成本控制只是根据施工组织设计的具体内容确

论文中英文翻译

An Analysis of Cooperative Principles and Humorous Effects in Friend s 合作原则的分析和在朋友的幽默效应 Humor is a very intriguing and fascinating phenomenon of human society, which is multidimensional, complex and all pervasive. Therefore, many scholars and experts at all times and in all over the world have done profound research on humor. 幽默是人类社会的一个非常有趣和引人入胜的现象,这是多方面的,复杂和无孔不入的。所以,在任何时候,在世界各地的许多学者和专家总是对幽默进行深入的研究。 The significant functions of humor have aroused the interest of many scholars. About 2,000 years ago, people began the research on humor. However, the study of humor is not a simple task for the reason that it is an interdisciplinary science drawing upon a wide range of academic disciplines including biology, psychology, sociology, philosophy, geography, history, linguistics, literature, education, family science, and film studies and so on. Moreover, there are different reasons and purposes for humor. One may wish to be sociable, cope better, seem clever, solve problems, make a critical point, enhance therapy, or express something one could not otherwise express by means of humor. 显著幽默的功能已引起许多学者的兴趣。大约在2000年前,人们对幽默开始研究,然而,这项幽默的研究不是一个简单的任务,理由是它是一个跨学科的科学绘图在各种各样的学科,包括生物学、心理学、社会学、哲学、地理、历史、语言、文学、教育、家庭科学和电影研究等。此外,幽默有不同的原因和目的,人们可能希望有点大男子主义,随机应变,似乎是聪明,解决问题,使一个临界点,加强治疗,或表达的东西不能以其他方式表达幽默的方式。 Within the 20th century, linguistics has developed greatly in almost every area of the discipline from sounds, words and sentences to meaning and texts. Meanwhile, linguistic studies on humor have also extended considerably to social, cultural, and pragmatic concerns. One of the most noticeable achievements in linguistics over the

土木工程专业外文文献及翻译

( 二 〇 一 二 年 六 月 外文文献及翻译 题 目: About Buiding on the Structure Design 学生姓名: 学 院:土木工程学院 系 别:建筑工程系 专 业:土木工程(建筑工程方向) 班 级:土木08-4班 指导教师:

英文原文: Building construction concrete crack of prevention and processing Abstract The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processing Foreword Concrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the

论文外文翻译

Analysis of the role of complaint management in the context of relationship marketing Author: Leticia Su′arez ′Alvarez, University of Oviedo, Spain Abstract This research aims to contribute to the relationship-marketing strategy by studying the role of complaint management in long-term relationships. Two factors distinguish it from other studies: it takes into account two types of customers, consumers and firms, and the result variable selected is the probability of ending an ongoing relationship. Two questionnaires were designed for every population. One of them was auto-administrated to a sample of consumers in the north of Spain, and the other one was sent to a representative sample of Spanish firms. The data analyses were conducted using structural equation modeling. The findings confirm the importance that theory accords to the relationship-marketing strategy, and also provide evidence for the importance of complaint management. Thus having a good complaint-handling system and trained and motivated staff who are fully committed to the firm’s objectives are fundamental requisites for firms to be able to build a stable customer portfolio. Keywords complaint management; relationship marketing; relationship termination; trust; satisfaction Introduction Nowadays, the main task for tourism firms is undoubtedly to deliver superior value to customers. One way that these firms can achieve part of this value is by maintaining quality relationships with their customers. In fact, it is well known that managing these relationships is critical for achieving corporate success. Thus the general aim of the present research is to analyze the most important factors that contribute to relationship stabilization between tourism firms and their customers. This research canters on retail travel agencies. We chose this particular type of tourism firm for two reasons. First, competition between retail travel agencies is becoming much more intense, fundamentally due to the advent of the Internet as an alternative distribution channel for tourism services (Wang & Cheung, 2004). The second reason is the current phenomenon of disintermediation, or the tendency of some tourism service providers to contact the end-customer directly. Because of these two developments, retail travel agencies urgently need to develop a strategy that allows them to maintain a stable portfolio of customers over time if they are to remain in the market for the long term. In order to achieve the proposed objective, we set out a causal model that incorporates a number of factors that can condition the future of the relationships between travel agencies and their customers. Specifically, we chose two variables that

土木工程外文翻译参考3篇

学校 毕业设计(论文)附件 外文文献翻译 学号: xxxxx 姓名: xxx 所在系别: xxxxx 专业班级: xxx 指导教师: xxxx 原文标题: Building construction concrete crack of prevention and processing 2012年月日 .

建筑施工混凝土裂缝的预防与处理1 摘要 混凝土的裂缝问题是一个普遍存在而又难于解决的工程实际问题,本文对混凝土工程中常见的一些裂缝问题进行了探讨分析,并针对具体情况提出了一些预防、处理措施。 关键词:混凝土裂缝预防处理 前言 混凝土是一种由砂石骨料、水泥、水及其他外加材料混合而形成的非均质脆性材料。由于混凝土施工和本身变形、约束等一系列问题,硬化成型的混凝土中存在着众多的微孔隙、气穴和微裂缝,正是由于这些初始缺陷的存在才使混凝土呈现出一些非均质的特性。微裂缝通常是一种无害裂缝,对混凝土的承重、防渗及其他一些使用功能不产生危害。但是在混凝土受到荷载、温差等作用之后,微裂缝就会不断的扩展和连通,最终形成我们肉眼可见的宏观裂缝,也就是混凝土工程中常说的裂缝。 混凝土建筑和构件通常都是带缝工作的,由于裂缝的存在和发展通常会使内部的钢筋等材料产生腐蚀,降低钢筋混凝土材料的承载能力、耐久性及抗渗能力,影响建筑物的外观、使用寿命,严重者将会威胁到人们的生命和财产安全。很多工程的失事都是由于裂缝的不稳定发展所致。近代科学研究和大量的混凝土工程实践证明,在混凝土工程中裂缝问题是不可避免的,在一定的范围内也是可以接受的,只是要采取有效的措施将其危害程度控制在一定的范围之内。钢筋混凝土规范也明确规定:有些结构在所处的不同条件下,允许存在一定宽度的裂缝。但在施工中应尽量采取有效措施控制裂缝产生,使结构尽可能不出现裂缝或尽量减少裂缝的数量和宽度,尤其要尽量避免有害裂缝的出现,从而确保工程质量。 混凝土裂缝产生的原因很多,有变形引起的裂缝:如温度变化、收缩、膨胀、不均匀沉陷等原因引起的裂缝;有外载作用引起的裂缝;有养护环境不当和化学作用引起的裂缝等等。在实际工程中要区别对待,根据实际情况解决问题。 混凝土工程中常见裂缝及预防: 1.干缩裂缝及预防 干缩裂缝多出现在混凝土养护结束后的一段时间或是混凝土浇筑完毕后的一周左右。水泥浆中水分的蒸发会产生干缩,且这种收缩是不可逆的。干缩裂缝的产生主要是由于混凝土内外水分蒸发程度不同而导致变形不同的结果:混凝土受外部条件的影响,表面水分损失过快,变形较大,内部湿度变化较小变形较小,较大的表面干缩变形受到混凝土内部约束,产生较大拉应力而产生裂缝。相对湿度越低,水泥浆体干缩越大,干缩裂缝越易产 1原文出处及作者:《加拿大土木工程学报》

英文翻译(小论文)

A virtual instrument based measurement and control platform for vibration analysis of motor LI Wen1, LI Li2 Abstract:This paper describes the establishing process of motor vibration analyzing system based on virtual instrument. This system consists of data acquisition module, vibration spectrum analysis module, and control module. Real-time collection of data acquisition module can be operated during motor running process. Power spectrum, harmonic analysis and STFT intensity spectrum can be done with vibration spectrum analysis module; and the performance of motor under different control laws can be easily studied by call control algorithms with control module. The test results show that the platform is feasible and effective. Key words: motor vibration; virtual instrument; spectrum analysis module; control module 2.1 data acquisition module Place DAQ Assistant Express VI and Write to Measurement File .vi into While Circulation in program block diagram while set the cycle time as 60s, then set the channel, sensitivity, sample rate and other parameters in DAQ Assistant . Run the program can collect experimental data and the data can be stored by the designated route in the folder. Fig.4 shoes its program Fig.4. program of DAQ Data acquisition

相关主题